Planning application
35B Panton Street London SW1Y 4EA
Works: Windows or glazing
Permission granted. Work must normally begin within three years of the decision or the permission lapses.
Proposal
Replacement of existing corner window with new double door.
As published by the council, reference 25/08852/FULL
Application record
- Reference
- 25/08852/FULL
- Type
- Full Planning Permission Application
- Status
- Decided
- Decision
- Granted As published: Application Permitted
- Received
- 5 Dec 2025
- Validated
- 13 Feb 2026
- Decided
- 2 Apr 2026
- Ward
- St James's
- Decision by
- Delegated Decision
- Postcode
- SW1Y 4EA
Site history
Applications at this address on the Westminster register
This site has had 2 applications since 2025: 1 approved, 0 refused.
-
26/00913/LBC Awaiting decision
35B Panton Street London SW1Y 4EA
Replacement of existing corner window with new double door. (Linked to 25/08852/FULL)
Timeline
Dates from the published record
-
5 Dec 2025
Received by Westminster
-
13 Feb 2026
Validated
Checked as complete and ready for consideration.
-
2 Apr 2026
Decision issued: Application Permitted
-
29 Jul 2026
Added to PlanIndex
Related applications
Cases linked to this one on the register
1 later application on the register refers to this one:
-
26/00913/LBC Awaiting decision
35B Panton Street London SW1Y 4EA
Replacement of existing corner window with new double door. (Linked to 25/08852/FULL)
Who's behind it
Company information only, from the register and Companies House
Japan Centre Group Ltd Agent, registered in London
Liquidation · incorporated 1976 · London
2 applications on PlanIndex
Trade members see everything this firm has filed, how it was decided, and get an email the day it files again.
See their track recordDocuments
Plans, drawings, consultee responses and the officer's report
17 documents on file for this application
A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.
Watch members (£5 a month) open the document list from here.
Open the documentsWhat this grant of permission means
Westminster granted permission on 2 April 2026, subject to any conditions on the decision notice. Work must normally begin within three years or the permission lapses. More in our guide to what happens after a planning decision.
About full applications
A full application seeks permission for a complete, detailed proposal in one go, with siting, design, access and landscaping all fixed at this stage. More in our guide to planning application types.
Nearby applications
Within 0.3 miles
-
31 Coventry Street London W1D 6AS
82% historically approved · decision due ~25 Aug
Display of a building replica shroud advert attached to the scaffolding measuring 19.3m x 60.9m with an externally illuminated insert advertising banner measuring 10m x 20.3m on the corner elevation of Coventry Street and Whitcomb Street for a temporary period from 1st September 2026 until 1st September 2027.
At appeal Advertising 5 docs -
First Floor Flat 37 Panton Street London SW1Y 4EA
88% historically approved · decision due ~27 Apr
Details of amendments to front elevation to amend the height of the window to match the adjacent window opening and infill void below new window with brickwork pursuant to Condition 3 of planning permission dated 5 June 2025 (RN: 24/09072/FULL)
Awaiting decision Full applications Extension Windows or glazing 2 docs -
35B Panton Street London SW1Y 4EA
90% historically approved · decision due ~10 Apr
Replacement of existing corner window with new double door. (Linked to 25/08852/FULL)
Awaiting decision Heritage and listed buildings Windows or glazing 12 docs -
Whitcomb Street Carpark 39 - 41 Whitcomb Street London WC2H 7DT
Use of part of car park at Level 7 to store e-cargo bikes as part of micro logistic hub.
Granted Full applications 23 docs -
Thistle Hotel 39 Coventry Street London W1D 6BZ
The proposed upgrade of an existing telecommunications base station installation comprising the installation of 1 no dish on existing steel work and ancillary development thereto at Every Hotel Piccadilly, previously known as Thistle Hotel.
Decided Telecoms -
Harold Pinter Theatre Panton Street London SW1Y 4DN
Internal alterations to a basement plant room including removal of redundant plant, formation of a new doorway, installation of a fire door, replacement lighting and associated making good works.
Decided Heritage and listed buildings 5 docs
Other full applications
In Westminster
-
26/07528/FULL Awaiting decision
69 Eaton Place London SW1X 8DF
Installation of new cast iron water pipe on rear courtyard elevation. (Linked with 26/07529/LBC)
-
26/05200/FULL Decided
1 The Court House 165 Seymour Place London W1H 4PU
Installation of waterproofing system to the existing lead flat roofs
-
26/07521/FULL Awaiting decision
Flat 18 Harlequin Court 20 Tavistock Street London WC2E 7NZ
Installation of one external condenser unit
-
26/07508/FULL Awaiting decision
Buckingham Palace The Mall London SW1A 1AA
Replacement of existing security lighting to the Buckingham Palace Forecourt with 80 compact LED spotlights installed within the lantern clusters across 10 principal piers, with associated concealed cabling and reversible fixings. (Linked with 26/07509/LBC)
-
26/07472/FULL Awaiting decision
Flat 3 82 New Cavendish Street London W1G 9TA
Replacement windows to second floor level with vacuum, double glazing windows. (Linked with 26/07473/LBC)