Planning application
25/08840/FULL
79 Fermoy Road London W9 3NJ
Proposal
Installation of an Alternative Wall Treatment (AWT) to replace the previously approved green wall associated with planning permission RN: 09/03456/FULL, following the execution of the S106 Deed of Variation (ref. 24/01309/MOD106).
As published by the council, reference 25/08840/FULL
Timeline
Dates from the published record
-
5 Dec 2025
Received by Westminster
-
7 Apr 2026
Decision issued: Application Permitted
-
29 Jul 2026
Added to PlanIndex
What a grant of permission means
The process from here
Permission has been granted, usually subject to conditions listed on the decision notice, some of which must be discharged before work starts. The decision notice on the council portal sets out exactly what was approved.
Work must normally begin within three years of the decision or the permission lapses. Neighbours cannot appeal a grant; challenging one means judicial review of how the decision was made, within tight time limits.
About full applications applications
How this application type works
A full application seeks permission for a complete, detailed proposal in one go: siting, design, access and landscaping are all fixed at this stage. It is the standard route for new buildings, conversions and changes of use. The statutory target is eight weeks for smaller schemes and thirteen weeks for major development, though complex cases often take longer by agreement.
Nearby applications
Within 500 metres
-
26/08918/COADV Awaiting decision
Ground 399 Harrow Road London W9 3NF
Display of externally illuminated fascia sign measuring 5.376m X 0.488, non illuminated other sign measuring 1.881m X 1m and 0.972m X 0.7m(Linked to FULL 25/08917/COFUL)
-
25/08917/COFUL Awaiting decision
Ground 399 Harrow Road London W9 3NF
Installation of a new timber shopfront including new timber fascia, cornice and traditional style awning, signage and lighting. Rebuilding console brackets and pilasters. (Linked to 26/08918/COADV)
-
25/08933/FULL Granted
532 Harrow Road London W9 3QF
Installation of timber shopfront, new timber fascia, cornice and traditional style awning and lighting.
-
25/08934/ADV Granted
532 Harrow Road London W9 3QF
Display of handpainted fascia signage, awning signage, window vinyls, projecting barbershop pole.
-
26/04573/FULL Awaiting decision
2A Ashmore Road London W9 3DF
Installation of two skylight to the ground floor flat roof and erection of rear extension at second floor level with a skylight.
-
25/05887/ADFULL Granted
Ground Floor 425 Harrow Road London W10 4RE
Details of a servicing management plan and details of how waste is to be stored on site and how materials for recycling will be stored separately pursuant to condition 5 and 9 of planning permission dated 28th August 2025 (RN:25/04438/FULL)
Other full applications applications
In Westminster
-
26/04824/ADFULL Granted
New Zealand House 80 Haymarket London SW1Y 4TE
Detailed design and specification of new blinds to NZH based on mock-up trials on-site. pursuant to condition 32 (i) of planning permission dated 8th April 2024 (23/00571/FULL).
-
26/04829/ADFULL Granted
New Zealand House 80 Haymarket London SW1Y 4TE
Details of external and internal signage strategy pursuant to Condition 33(E) of planning permission dated 8th April 2024 (RN: 23/00571/FULL)
-
26/04841/ADFULL Granted
29 Henstridge Place London NW8 6QD
Details of the facing materials you will use, including glazing, and elevations and roof plans annotated to show where the materials are to be located pursuant to condition 5 of planning permission dated 18th November 2025 (RN:25/06159).
-
26/04989/FULL Awaiting decision
1 Kildare Terrace London W2 5JT
Erection of a mansard roof extending over the main house and side wing, replacement lower ground rear extension with roof terrace above, lowering of lower ground floor slab, installation of an air source heat pump in rear garden, new front boundary treatment, and new second floor window on the north elevation.
-
26/04986/FULL Awaiting decision
Inver Court Inverness Terrace London W2 6JB
Replacement of combustible materials in the render facades; timber decking and plastic soffits/ fascias to terraces with non-combustible materials on the 5th and 6th floors.