Skip to content
PlanIndex Get alerts
Menu

Planning application

Block A To L Albany W1J 0AL

Awaiting decision Westminster 25/08792/LBC Listed Building Consent Application

Still open. Anyone can comment while the consultation period runs, and comments go to the council rather than to us.

Proposal

Installation of new door sets; retention and upgrading of existing front, outer and commmunal doors the Mansion House and Ropewalk Sets.

As published by the council, reference 25/08792/LBC

Application record

Reference
25/08792/LBC
Type
Listed Building Consent Application
Status
Pending
Received
3 Dec 2025
Validated
3 Dec 2025
Ward
West End
Postcode
W1J 0AL

Timeline

Dates from the published record

  1. 3 Dec 2025

    Received by Westminster

  2. 20 Jul 2026

    Added to PlanIndex

  3. Decision

    Awaiting decision

    Decision expected by 28 January 2026, 8 weeks from validation under the statutory target for most applications. Extensions of time are common and are agreed case by case.

    Westminster took a median of 91 days over the applications it decided in the last year.

Who's behind it

Company information only, from the register and Companies House

ADAM Architecture Agent, an architecture practice registered in Winchester

Active · incorporated 1986 · Winchester

90 applications on PlanIndex · across 23 councils · 99% granted

Trade members see everything this firm has filed, how it was decided, and get an email the day it files again.

See their track record

Documents

Plans, drawings, consultee responses and the officer's report

23 documents on file for this application

A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.

Watch members (£5 a month) open the document list from here.

Open the documents

What happens while it is decided

This application is with Westminster for determination, against a statutory target of eight weeks. Over the last year Westminster decided heritage and listed building applications in a median of 119 days. More in our guide to how long planning decisions take.

About heritage and listed building applications

Listed building consent is needed for works that affect the special interest of a listed building, and carrying out such works without it is a criminal offence. More in our guide to planning application types.

Nearby applications

Within 0.3 miles

  • Royal Academy Of Arts Burlington House 49 - 52 Piccadilly London W1J 0AN

    26/04441/FULL Submitted 3 Jul 2026 50 yards away

    Installation of new plant and relocation of existing plant at main roof level.

    Decided Full applications 18 docs
  • Royal Academy Of Arts Burlington House 49 - 52 Piccadilly London W1J 0AN

    26/04711/LBC Submitted 14 Jul 2026 50 yards away

    Installation of new plant and relocation of existing plant at main roof level.

    Decided Heritage and listed buildings
  • L Block Albany London W1J 0AZ

    22/01024/LBC Submitted 17 Feb 2022 50 yards away

    Replacement of existing fire alarm system with modern equivalent, incorporating the use of wireless hardware to extend coverage within residential communal units.

    Granted Heritage and listed buildings 13 docs
  • 5 L Block Albany London W1J 0AZ

    05/01803/LBC Submitted 10 Mar 2005 50 yards away

    Installation of a conservation type rooflight at mansard roof level.

    Granted Heritage and listed buildings Loft or dormer 8 docs
  • 5 L Block Albany London W1J 0AZ

    05/00866/LBC Submitted 3 Feb 2005 50 yards away

    Installation of boiler flue to rear flank wall. Removal of lift and replacement with new spiral staircase. Removal and replacement of door to bathroom.

    Granted Heritage and listed buildings 10 docs
  • 5 L Block Albany London W1J 0AZ

    05/00865/FULL Submitted 3 Feb 2005 50 yards away

    Installation of three dormer windows to rear roof level and insertion of boiler flue to rear flank wall.

    Withdrawn Full applications Loft or dormer Windows or glazing 2 docs

In Westminster

  • 26/06288/LBC Decided

    Barness Court 6 - 8 Westbourne Terrace London W2 3UW

    Installation of a gas pipework to south elevation and wall. (Linked with 26/06287/FULL)

    Received 14 Sep, published by the council 21 Sep 2026 Heritage and listed buildings
  • 26/07529/LBC Awaiting decision

    69 Eaton Place London SW1X 8DF

    Installation of new cast iron water supply pipe on rear courtyard elevation. (Linked with 26/07528/FULL)

    Received 5 Nov, published by the council 6 Nov 2026 Heritage and listed buildings
  • 26/07509/LBC Awaiting decision

    Buckingham Palace The Mall London SW1A 1AA

    Replacement of existing security lighting to the Buckingham Palace Forecourt with 80 compact LED spotlights installed within the lantern clusters across 10 principal piers, with associated concealed cabling and reversible fixings. (Linked with 26/07508/FULL)

    Received 4 Nov, published by the council 5 Nov 2026 Heritage and listed buildings
  • 26/07473/LBC Awaiting decision

    Flat 3 82 New Cavendish Street London W1G 9TA

    Replacement windows to second floor level with vacuum, double glazing windows. (Linked with 26/07472/FULL)

    Received 3 Nov, published by the council 6 Nov 2026 Heritage and listed buildings
  • 26/07471/LBC Awaiting decision

    12 Queen Anne's Gate London SW1H 9AA

    Excavation of single-storey basement, internal reconfiguration and installation of modern services. (Linked with 26/07470/FULL)

    Received 3 Nov, published by the council 5 Nov 2026 Heritage and listed buildings