Skip to content
PlanIndex Get alerts
Menu

Planning application

25/08687/FULL

1 Ranelagh Cottages London SW1W 8QA

Awaiting decision Westminster Full Planning Permission Application

Proposal

Alterations to the north-facing principal elevation, involving the removal of the existing front door and its decorative timber surround to be replaced with a sash window, and the construction of a new porch, which will require the removal of the existing window to form a new principal entrance into the dwelling.

As published by the council, reference 25/08687/FULL

Timeline

Dates from the published record

  1. 27 Nov 2025

    Received by Westminster

  2. 20 Jul 2026

    Added to PlanIndex

  3. Decision

    Awaiting decision

    The statutory target is eight weeks for most applications and thirteen for major development. Extensions of time are common.

What happens while it is decided

The process from here

This application is with Westminster for determination. The council publicises it, consults neighbours and technical bodies where required, and weighs the responses against local and national planning policy.

The statutory target is eight weeks for most applications and thirteen for major development, though extensions of time are common. Comments carry most weight while the case is undecided, so check the council portal for the deadline if you want to respond.

About full applications applications

How this application type works

A full application seeks permission for a complete, detailed proposal in one go: siting, design, access and landscaping are all fixed at this stage. It is the standard route for new buildings, conversions and changes of use. The statutory target is eight weeks for smaller schemes and thirteen weeks for major development, though complex cases often take longer by agreement.

More on full applications applications in our guide

Nearby applications

Within 500 metres

  • 25/05279/FULL Granted

    1 Ranelagh Cottages London SW1W 8QA

    Replacement conservatory.

    29 Jul 2025 5m away Full applications
  • 25/06178/FULL Withdrawn

    1A Ranelagh Cottages London SW1W 8QA

    Erection of a shared classical portico to the principal entrance,. Retention of existing boundary walls and brick paving, including a small pathway, installation of new stone paving and steps to provide a more legible entrance. (Site inlcudes 1 and 1A Ranelagh Cottages)

    1 Sep 2025 10m away Full applications
  • 26/00637/FULL Awaiting decision

    2 Ranelagh Cottages London SW1W 8QA

    Erection of single-storey extension at ground floor to provide level access.

    3 Feb 2026 10m away Full applications
  • 25/05841/ADLBC Granted

    22 Ebury Bridge Road London SW1W 8PZ

    Details of the new rooflight pursuant to condition 5 of building consent dated 25th April 2025 (RN:24/04168).

    18 Aug 2025 21m away Conditions
  • 25/05994/ADFULL Granted

    22 Ebury Bridge Road London SW1W 8PZ

    Details of the new rooflight pursuant to condition 6 of planning permission dated 25th April 2025 (RN:24/04167).

    22 Aug 2025 21m away Full applications
  • 25/07584/FULL Awaiting decision

    13 Ranelagh Grove London SW1W 8PA

    The erection of a new rear extension to the ground floor level including one roof light, the replacement of existing windows, alterations to the front terrace to incorporate new roof and new paving and installation of external AC condenser unit

    20 Oct 2025 35m away Full applications

In Westminster

  • 26/04824/ADFULL Granted

    New Zealand House 80 Haymarket London SW1Y 4TE

    Detailed design and specification of new blinds to NZH based on mock-up trials on-site. pursuant to condition 32 (i) of planning permission dated 8th April 2024 (23/00571/FULL).

    20 Jul 2026 Full applications
  • 26/04829/ADFULL Granted

    New Zealand House 80 Haymarket London SW1Y 4TE

    Details of external and internal signage strategy pursuant to Condition 33(E) of planning permission dated 8th April 2024 (RN: 23/00571/FULL)

    20 Jul 2026 Full applications
  • 26/04841/ADFULL Granted

    29 Henstridge Place London NW8 6QD

    Details of the facing materials you will use, including glazing, and elevations and roof plans annotated to show where the materials are to be located pursuant to condition 5 of planning permission dated 18th November 2025 (RN:25/06159).

    20 Jul 2026 Full applications
  • 26/04989/FULL Awaiting decision

    1 Kildare Terrace London W2 5JT

    Erection of a mansard roof extending over the main house and side wing, replacement lower ground rear extension with roof terrace above, lowering of lower ground floor slab, installation of an air source heat pump in rear garden, new front boundary treatment, and new second floor window on the north elevation.

    24 Jul 2026 Full applications
  • 26/04986/FULL Awaiting decision

    Inver Court Inverness Terrace London W2 6JB

    Replacement of combustible materials in the render facades; timber decking and plastic soffits/ fascias to terraces with non-combustible materials on the 5th and 6th floors.

    24 Jul 2026 Full applications