Skip to content
PlanIndex Get alerts
Menu

Planning application

Dorchester Hotel 53 Park Lane London W1K 1QA

Granted Westminster 25/08202/ADLBC Approval of Details (ADLBC)

Relates to 25/07961/ADFULL

Permission granted. Work must normally begin within three years of the decision or the permission lapses.

Proposal

Details of photographs, drawings and written description providing details of the condition of the building fabric beneath the plastic green cladding shown on drawing A-HW-250-05 Rev. 07, pursuant to condition 3 of Listed building Consent dated 2nd May 2025 (25/00132/LBC). [Linked with 25/07961/ADFULL].

As published by the council, reference 25/08202/ADLBC

Application record

Reference
25/08202/ADLBC
Type
Approval of Details (ADLBC)
Status
Decided
Decision
Application Permitted
Received
11 Nov 2025
Validated
23 Jan 2026
Decided
19 Mar 2026
Ward
West End
Decision by
Delegated Decision
Postcode
W1K 1QA

Site history

Applications at this address on the Westminster register

This site has had 16 applications since 2025: 4 approved, 0 refused.

  • 26/05795/ADFULL Awaiting decision

    Dorchester Hotel 53 Park Lane London W1K 1QA

    Details of new doors and windows pursuant to Condition 4 (A and B) of planning permission dated 29th September 2023 (RN22/08705/FULL)

    Submitted 24 Aug 2026
  • 26/05759/ADLBC Awaiting decision

    Dorchester Hotel 53 Park Lane London W1K 1QA

    Detailed drawings of the new doors and new windows pursuant to condition 4 (A), (B) of listed building dated 29th September 2023 (RN:22/08706/LBC)

    Submitted 21 Aug 2026
  • 26/05712/LBC Awaiting decision

    Dorchester Hotel 53 Park Lane London W1K 1QA

    Removal and replacement of external facing materials and windows to the Harlequin Suite at ninth floor level on the west elevation.(Linked with 26/05711/FULL)

    Submitted 20 Aug 2026 Heritage and listed buildings
  • 26/05711/FULL Awaiting decision

    Dorchester Hotel 53 Park Lane London W1K 1QA

    Removal and replacement of external facing materials and windows to the Harlequin Suite at ninth floor level on the west elevation (Linked with 26/05712/LBC)

    Submitted 20 Aug 2026 Full applications
  • 26/05713/ADFULL Awaiting decision

    Dorchester Hotel 53 Park Lane London W1K 1QA

    Details of photographs and/or manufacturers' specifications of the facing materials pursuant to condition 4 of planning permission dated 20 March 2026 (RN: 24/06594/FULL)

    Submitted 20 Aug 2026
  • 26/05634/ADLBC Awaiting decision

    Dorchester Hotel 53 Park Lane London W1K 1QA

    Details of approval of photographs and/or manufacturers' specifications of the facing materials you will use, including paving, and elevations and roof plans annotated to show where the materials are to be located and detailed drawings of new internal doors pursuant to conditions 3 and 4 of listed building consent dated 20th March 2026 (RN 24/06595/LBC)

    Submitted 18 Aug 2026
  • 26/04237/ADV Decided

    Dorchester Hotel 53 Park Lane London W1K 1QA

    Display of 3 illuminated flags at ninth floor to the south elevation measuring 2.7m x 1.4m. (Linked to 26/04220/LBC)

    Submitted 26 Jun 2026 Advertising
  • 26/04220/LBC Decided

    Dorchester Hotel 53 Park Lane London W1K 1QA

    Erection of 3 externally illuminated flagpoles at ninth floor to the south elevation. (Linked to 26/04237/ADV)

    Submitted 25 Jun 2026 Heritage and listed buildings
  • 25/09221/FULL Granted

    Dorchester Hotel 53 Park Lane London W1K 1QA

    Variation of condition 5 of planning permission dated 15 November 2024 (RN:24/05001/FULL) for the: Installation of flue to mezzanine roof on the Northwest facade for an emergency generator. Namely, to allow extension to the timeframe to prepare the final material.

    Decided 9 Apr 2026 Full applications
  • 25/09170/LBC Granted

    Dorchester Hotel 53 Park Lane London W1K 1QA

    Variation of Condition 3 of listed building consent dated 15 November 2024 (RN: 24/05002/LBC) for, 'Installation of flue to mezzanine roof on the Northwest facade for an emergency generator'; Namely, to allow extension to the timeframe to prepare the final material. (Linked to 25/09221/FULL)

    Decided 18 May 2026 Heritage and listed buildings

Timeline

Dates from the published record

  1. 11 Nov 2025

    Received by Westminster

  2. 23 Jan 2026

    Validated

    Checked as complete and ready for consideration.

  3. 19 Mar 2026

    Decision issued: Application Permitted

  4. 30 Aug 2026

    Added to PlanIndex

Cases linked to this one on the register

  • 25/07961/ADFULL Granted

    Dorchester Hotel 53 Park Lane London W1K 1QA

    Details of photographs, drawings and written description providing details of the condition of the building fabric beneath the plastic green cladding pursuant to condition 6 of planning permission dated 2nd May 2025 (RN:25/00131/FULL). [Linked with 25/08202/ADLBC].

    Decided 19 Mar 2026 Full applications

1 later application on the register refers to this one:

  • 25/07961/ADFULL Granted

    Dorchester Hotel 53 Park Lane London W1K 1QA

    Details of photographs, drawings and written description providing details of the condition of the building fabric beneath the plastic green cladding pursuant to condition 6 of planning permission dated 2nd May 2025 (RN:25/00131/FULL). [Linked with 25/08202/ADLBC].

    Decided 19 Mar 2026 Full applications

Documents

Plans, drawings, consultee responses and the officer's report

8 documents on file for this application

A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.

Trade members open them from here.

Open the documents

What this grant of permission means

Westminster granted permission on 19 March 2026, subject to any conditions on the decision notice. Work must normally begin within three years or the permission lapses. More in our guide to what happens after a planning decision.

About condition discharge and variation applications

This application deals with conditions on an existing permission, supplying the details a condition requires or asking to vary or remove one, without reopening the permission itself. More in our guide to planning application types.

Nearby applications

Within 500 metres

  • Dorchester Hotel 53 Park Lane London W1K 1QA

    25/08204/ADLBC Submitted 11 Nov 2025 0m away

    90% historically approved · decision due ~6 Jan

    Detailed sections (at 1:20 scale) through the reconstructed ninth floor wall, including showing the build up of the wall, the position of the windows within the depth of the wall, and the profile of the coping and any other mouldings pursuant to condition 5 of listed building dated 15th August 2025 (RN:25/03866/LBC)

    Awaiting decision Conditions Windows or glazing 8 docs
  • Dorchester Hotel 53 Park Lane London W1K 1QA

    25/08203/ADLBC Submitted 11 Nov 2025 0m away

    90% historically approved · decision due ~6 Jan

    Details of new windows and balustrade pursuant to condition 4 of listed building consent dated 15th August 2025 (RN: 25/03866/LBC).

    Awaiting decision Conditions Windows or glazing 1 doc
  • Dorchester Hotel 53 Park Lane London W1K 1QA

    25/07961/ADFULL Submitted 3 Nov 2025 0m away

    Details of photographs, drawings and written description providing details of the condition of the building fabric beneath the plastic green cladding pursuant to condition 6 of planning permission dated 2nd May 2025 (RN:25/00131/FULL). [Linked with 25/08202/ADLBC].

    Granted Full applications 10 docs
  • Dorchester Hotel 53 Park Lane London W1K 1QA

    26/05712/LBC Submitted 20 Aug 2026 0m away

    90% historically approved · decision due ~21 Oct

    Removal and replacement of external facing materials and windows to the Harlequin Suite at ninth floor level on the west elevation.(Linked with 26/05711/FULL)

    Awaiting decision Heritage and listed buildings Windows or glazing
  • Dorchester Hotel 53 Park Lane London W1K 1QA

    26/05711/FULL Submitted 20 Aug 2026 0m away

    87% historically approved · decision due ~21 Oct

    Removal and replacement of external facing materials and windows to the Harlequin Suite at ninth floor level on the west elevation (Linked with 26/05712/LBC)

    Awaiting decision Full applications Windows or glazing
  • Dorchester Hotel 53 Park Lane London W1K 1QA

    26/05759/ADLBC Submitted 21 Aug 2026 0m away

    89% historically approved · decision due ~16 Oct

    Detailed drawings of the new doors and new windows pursuant to condition 4 (A), (B) of listed building dated 29th September 2023 (RN:22/08706/LBC)

    Awaiting decision Windows or glazing

In Westminster

  • 26/04860/ADLBC Granted

    New Zealand House 80 Haymarket London SW1Y 4TE

    Details of external and internal signage strategy pursuant to Condition 7(E) of listed building consent dated 12th February 2021 (RN: 19/07816/LBC)

    20 Jul 2026 Conditions
  • 26/04843/ADLBC Granted

    New Zealand House 80 Haymarket London SW1Y 4TE

    Detailed design and specification of new blinds to NZH based on mock-up trials on-site pursuant to Condition 6(m) of listed building consent dated 12th February 2021 (19/07816/LBC).

    20 Jul 2026 Conditions
  • 26/05026/ADLBC Awaiting decision

    St James's Park The Mall London SW1A 1AA

    Details of method statement for re-carving works pursuant to condition 3(i) of listed building consent dated 16 July 2026 (RN: 26/03399/LBC)

    27 Jul 2026 Conditions
  • 26/05007/ADLBC Awaiting decision

    25 Old Bond Street London W1S 4QB

    Details of revised boundary treatment / method statement for removal and reinstallation of historic oval stair and moulding pursuant to conditions 3 and 5 of listed building consent dated 01 May 2026 (RN: 25/07666/LBC) [Linked to 26/04976/ADFULL]

    24 Jul 2026 Conditions
  • 26/04850/ADLBC Awaiting decision

    17 Belgrave Square London SW1X 8PG

    Detailed drawings of garage doors, roof lantern and any new lighting and flooring in the principal rooms pursuant to condition 6 (iii) (iv) (v) of listed building 18th August 2025 (RN:25/03417/LBC)

    20 Jul 2026 Conditions