Skip to content
PlanIndex Get alerts
Menu

Planning application

Flat A 150 Elgin Avenue London W9 2NT

Granted Westminster 25/07780/FULL Full Planning Permission Application

Works: Trees Small domestic

Read from the description, not a valuation. How we read the register

Permission granted. Work must normally begin within three years of the decision or the permission lapses.

Proposal

Variation of condition 10 and 12 of planning permission dated 1st July 2024 (RN:23/03660/FULL) for the Construction of a single storey outbuilding in the rear garden, for use as occasional office space, garden storage and air source heat pump enclosure. Namely, to re-word conditions 10 and 12 through provision of tree protection and piling details.

As published by the council, reference 25/07780/FULL

Application record

Reference
25/07780/FULL
Type
Full Planning Permission Application
Status
Decided
Decision
Granted As published: Application Permitted
Received
27 Oct 2025
Validated
27 Oct 2025
Decided
26 Aug 2026
Ward
Maida Vale
Decision by
Complex Delegated Decision
Postcode
W9 2NT

Timeline

Dates from the published record

  1. 27 Oct 2025

    Received by Westminster

  2. 21 Jul 2026

    Added to PlanIndex

  3. 26 Aug 2026

    Decision issued: Application Permitted

Documents

Plans, drawings, consultee responses and the officer's report

14 documents on file for this application

A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.

Watch members (£5 a month) open the document list from here.

Open the documents

What this grant of permission means

Westminster granted permission on 26 August 2026, subject to any conditions on the decision notice. Work must normally begin within three years or the permission lapses. More in our guide to what happens after a planning decision.

About full applications

A full application seeks permission for a complete, detailed proposal in one go, with siting, design, access and landscaping all fixed at this stage. More in our guide to planning application types.

Nearby applications

Within 0.3 miles

  • 115 Elgin Avenue London W9 2NR

    26/02697/TCA Submitted 23 Apr 2026 50 yards away

    100% historically approved · decision due ~18 Jun

    T1: Sycamore (Acer pseudoplatanus) - Carry out a cyclical crown management operation by removing approximately 7-8 years of regrowth back to the previous established pollard points (re-pollarding). The works will reinstate the original pollard framework and manage overall crown size. All pruning cuts will be made at appropriate positions to maintain structural integrity and promote healthy, sustainable regrowth. The works will be undertaken sympathetically to retain crown continuity and minimise physiological stress. All works to be undertaken by competent arborists, with appropriate safety measures in place. All arisings to be cleared and removed from site on completion. All works to be carried out in accordance with BS39982010 - Tree Work Recommendations. Reason for works: General tree maintenance - To allow more light into the property

    Awaiting decision Trees 7 docs
  • 103 Elgin Avenue London W9 2NP

    26/00110/ADFULL Submitted 9 Jan 2026 100 yards away

    Detailed drawings of the front gate pursuant to condition 7 of planning permission dated 9th October 2024 (RN: 24/06427/FULL)

    Granted Full applications 3 docs
  • 103 Elgin Avenue London W9 2NP

    26/07423/CLOPUD Submitted 2 Nov 2026 100 yards away

    84% historically approved · decision due ~28 Dec

    Painting of the decorative stonework, window frames and doors on the front elevation and front boundary wall

    Awaiting decision Lawful development Windows or glazing
    Small domestic
  • Westside Court 107 - 113 Elgin Avenue London W9 2NP

    26/05284/TPO Submitted 4 Aug 2026 100 yards away

    100% historically approved · decision due ~29 Sep

    1. Reduce the height of the horse chestnut tree by 30%, reduce the sides by 30%, crown lift to crown break. 2. Reduce Laurel tree (no pear tree on site) by 30%, reduce the sides by 30% crown lift to crown break

    Awaiting decision Trees
  • Westside Court 107 - 113 Elgin Avenue London W9 2NP

    26/05284/TCA Submitted 4 Aug 2026 100 yards away

    100% historically approved · decision due ~29 Sep

    1 x Cotoneaster: crown reduce all round by 1.5m and lift by 1m, pruning back to suitable growth points. 1 x Portuguese laurel: crown reduce all round by 1m and lift by 1m, pruning back to suitable growth points.

    Decided Trees
  • 123 - 123A Shirland Road London W9 2EW

    25/07061/ADFULL Submitted 1 Oct 2025 100 yards away

    Details of revised piling statement pursuant to condition 27 of planning permission dated 19th March 2025. (RN: 24/06716/FULL).

    Granted Full applications 16 docs

In Westminster

  • 26/05200/FULL Decided

    1 The Court House 165 Seymour Place London W1H 4PU

    Installation of waterproofing system to the existing lead flat roofs

    Received 3 Aug, published by the council 28 Aug 2026 Full applications
  • 26/07508/FULL Awaiting decision

    Buckingham Palace The Mall London SW1A 1AA

    Replacement of existing security lighting to the Buckingham Palace Forecourt with 80 compact LED spotlights installed within the lantern clusters across 10 principal piers, with associated concealed cabling and reversible fixings. (Linked with 26/07509/LBC)

    Received 4 Nov, published by the council 5 Nov 2026 Full applications
  • 26/07470/FULL Awaiting decision

    12 Queen Anne's Gate London SW1H 9AA

    Excavation of single-storey basement. (Linked with 26/07471/LBC).

    Received 3 Nov, published by the council 5 Nov 2026 Full applications
  • 26/07466/FULL Awaiting decision

    65 Albion Gate Albion Street W2 2LA

    Replacement of first-floor front elevation windows and balcony door with double-glazed steel-framed units.

    Received 3 Nov, published by the council 5 Nov 2026 Full applications
  • 26/07481/FULL Awaiting decision

    1 Loudoun Road London NW8 0LH

    Minor alterations to fenestration in connection with internal remodelling, including the upgrading of external windows to the north rear classroom block and localised alterations to window sill heights.

    Received 3 Nov, published by the council 6 Nov 2026 Full applications