Planning application
Flat A 150 Elgin Avenue London W9 2NT
Works: Trees Small domestic
Read from the description, not a valuation. How we read the register
Permission granted. Work must normally begin within three years of the decision or the permission lapses.
Proposal
Variation of condition 10 and 12 of planning permission dated 1st July 2024 (RN:23/03660/FULL) for the Construction of a single storey outbuilding in the rear garden, for use as occasional office space, garden storage and air source heat pump enclosure. Namely, to re-word conditions 10 and 12 through provision of tree protection and piling details.
As published by the council, reference 25/07780/FULL
Application record
- Reference
- 25/07780/FULL
- Type
- Full Planning Permission Application
- Status
- Decided
- Decision
- Application Permitted
- Received
- 27 Oct 2025
- Validated
- 27 Oct 2025
- Decided
- 26 Aug 2026
- Ward
- Maida Vale
- Decision by
- Complex Delegated Decision
- Postcode
- W9 2NT
Timeline
Dates from the published record
-
27 Oct 2025
Received by Westminster
-
21 Jul 2026
Added to PlanIndex
-
26 Aug 2026
Decision issued: Application Permitted
Documents
Plans, drawings, consultee responses and the officer's report
14 documents on file for this application
A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.
Trade members open them from here.
Open the documentsWhat this grant of permission means
Westminster granted permission on 26 August 2026, subject to any conditions on the decision notice. Work must normally begin within three years or the permission lapses. More in our guide to what happens after a planning decision.
About full applications
A full application seeks permission for a complete, detailed proposal in one go, with siting, design, access and landscaping all fixed at this stage. More in our guide to planning application types.
Nearby applications
Within 500 metres
-
115 Elgin Avenue London W9 2NR
100% historically approved · decision due ~18 Jun
T1: Sycamore (Acer pseudoplatanus) - Carry out a cyclical crown management operation by removing approximately 7-8 years of regrowth back to the previous established pollard points (re-pollarding). The works will reinstate the original pollard framework and manage overall crown size. All pruning cuts will be made at appropriate positions to maintain structural integrity and promote healthy, sustainable regrowth. The works will be undertaken sympathetically to retain crown continuity and minimise physiological stress. All works to be undertaken by competent arborists, with appropriate safety measures in place. All arisings to be cleared and removed from site on completion. All works to be carried out in accordance with BS39982010 - Tree Work Recommendations. Reason for works: General tree maintenance - To allow more light into the property
Awaiting decision Trees 7 docs -
103 Elgin Avenue London W9 2NP
Detailed drawings of the front gate pursuant to condition 7 of planning permission dated 9th October 2024 (RN: 24/06427/FULL)
Granted Full applications 3 docs -
Westside Court 107 - 113 Elgin Avenue London W9 2NP
100% historically approved · decision due ~29 Sep
1. Reduce the height of the horse chestnut tree by 30%, reduce the sides by 30%, crown lift to crown break. 2. Reduce Laurel tree (no pear tree on site) by 30%, reduce the sides by 30% crown lift to crown break
Awaiting decision Trees -
Westside Court 107 - 113 Elgin Avenue London W9 2NP
100% historically approved · decision due ~29 Sep
1 x Cotoneaster: crown reduce all round by 1.5m and lift by 1m, pruning back to suitable growth points. 1 x Portuguese laurel: crown reduce all round by 1m and lift by 1m, pruning back to suitable growth points.
Decided Trees -
123 - 123A Shirland Road London W9 2EW
Details of revised piling statement pursuant to condition 27 of planning permission dated 19th March 2025. (RN: 24/06716/FULL).
Granted Full applications 16 docs -
British Broadcasting Corporation Delaware Road London W9 2LG
87% historically approved · decision due ~8 Oct
Variation of condition 1 of planning permission dated 12 February 2015 (RN:24/08378/FULL) for the Retention, partial demolition and alteration of the existing building for use as film and music studios (continued Class E use). Works include a partial basement excavation, replacement of the existing roof, installation of new plant and external amenity spaces to the rear, façade and access alterations, highway works and all other works associated with the development. Internal works to include the restoration and alteration of studios MV1-3, removal and alteration of roof trusses, construction of a new studio space and entrance lobby, and removal of studios MV4-7, in order to construct new studio, editing, staff welfare, plant, and office spaces. Namely, alterations to the layout and approach to Studio MV1 to retain more trusses and the original ceiling height, alterations to the approach to the original trusses along the second floor of the building, with all original trusses now retained or adapted, revised plant arrangements resulting in internal and external layout alterations, revised layout to the southern "visual" wing of the building to provide more compartmentalised office space and redistribution of floors to account for the loss of useable area above studio MV1, revised rooflight positioning to reflect the new internal layout, relocation of the external terrace area further to the south; and consequential internal and external design alterations to correspond to the revised approach including minor changes to back of house locations, circulation spaces and amenity areas.
Awaiting decision Full applications Loft or dormer Demolition
Other full applications
In Westminster
-
26/06295/FULL Awaiting decision
15 Warwick Way London SW1V 1QT
Installation of a new shopfront.
-
26/06297/FULL Awaiting decision
15 Warwick Way London SW1V 1QT
Alterations to rear elevation at basement level comprising repolacement window and installation of double opening door.
-
26/06234/FULL Awaiting decision
40 Grosvenor Place London SW1X 7HJ
Use of lower ground floor of Unit 3 and ground floor of Unit 2 as gym (Class E(d)) and/ or office (Class E(g))
-
26/06249/FULL Awaiting decision
53 Wimpole Street London W1G 8YH
Removal and Installation of external rear air condensers and associated pipe work to ground floor, including internal works to ground and first floor. (Linked with 26/06250/LBC)
-
26/03576/FULL Decided
15A Devonshire Terrace London W2 3DW
Erection of an infill extension to basement courtyard to form new bedroom and internal alterations. (Linked with 26/03577/LBC)