Skip to content
PlanIndex Get alerts
Menu

Planning application

123 - 123A Shirland Road London W9 2EW

Granted Westminster 25/07061/ADFULL Approval of Details (Full PP)

Permission granted. Work must normally begin within three years of the decision or the permission lapses.

Proposal

Details of revised piling statement pursuant to condition 27 of planning permission dated 19th March 2025. (RN: 24/06716/FULL).

As published by the council, reference 25/07061/ADFULL

Application record

Reference
25/07061/ADFULL
Type
Approval of Details (Full PP)
Status
Decided
Decision
Granted As published: Application Permitted
Received
1 Oct 2025
Validated
19 Jan 2026
Decided
23 Feb 2026
Ward
Maida Vale
Decision by
Delegated Decision
Postcode
W9 2EW

Site history

Applications at this address on the Westminster register

This site has had 2 applications since 2023: 2 approved, 0 refused.

  • 23/04457/ADFULL Granted

    123-123A Shirland Road London W9 2EW

    Details of Piling Method Statement in consultation with Thames Water pursuant to condition 28 of planning permission dated 20th July 2021 (RN 20/07187/FULL)

    Decided 18 Jul 2023 Full applications

Timeline

Dates from the published record

  1. 1 Oct 2025

    Received by Westminster

  2. 19 Jan 2026

    Validated

    Checked as complete and ready for consideration.

  3. 23 Feb 2026

    Decision issued: Application Permitted

  4. 21 Jul 2026

    Added to PlanIndex

Who's behind it

Company information only, from the register and Companies House

DGA Architects LLP Agent, an architecture practice

10 applications on PlanIndex · across 4 councils

Trade members see everything this firm has filed, how it was decided, and get an email the day it files again.

See their track record

Documents

Plans, drawings, consultee responses and the officer's report

16 documents on file for this application

A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.

Watch members (£5 a month) open the document list from here.

Open the documents

What this grant of permission means

Westminster granted permission on 23 February 2026, subject to any conditions on the decision notice. Work must normally begin within three years or the permission lapses. More in our guide to what happens after a planning decision.

About full applications

A full application seeks permission for a complete, detailed proposal in one go, with siting, design, access and landscaping all fixed at this stage. More in our guide to planning application types.

Nearby applications

Within 0.3 miles

  • 123-123A Shirland Road London W9 2EW

    23/04457/ADFULL Submitted 30 Jun 2023 50 yards away

    Details of Piling Method Statement in consultation with Thames Water pursuant to condition 28 of planning permission dated 20th July 2021 (RN 20/07187/FULL)

    Granted Full applications 11 docs
  • Basement And Ground Floor 123 - 123A Shirland Road London W9 2EW

    25/08622/ADV Submitted 25 Nov 2025 50 yards away

    Display of hoarding.

    Granted Advertising 7 docs
  • 108 Shirland Road London W9 2EQ

    26/02795/ADFULL Submitted 27 Apr 2026 50 yards away

    88% historically approved · decision due ~22 Jun

    Details of a Secured by Design accreditation shall be obtained for the building; pursuant to condition 13 of planning permission dated 4 December 2024 (RN 24/02206/FULL)

    Awaiting decision Full applications 2 docs
  • 108 Shirland Road London W9 2EQ

    25/05861/FULL Submitted 19 Aug 2025 50 yards away

    Conversion of 108 Shirland Road from self contained flats to 14 room house of multiple occupation with Communal Facilities; extension of existing house of multiple occupation at 110 Shirland Road; and installation of air source heat pumps (ASHPs) to the rear of property.

    Withdrawn Full applications New dwelling Extension 27 docs
  • Flat 4 104 Shirland Road London W9 2EQ

    26/00799/CLOPUD Submitted 10 Feb 2026 50 yards away

    Confirmation of commencement of planning permission granted on 24th April 2023 (RN: 23/00883/FULL) for the Erection of rear dormer; Formation of door and installation of railings, associated with creation of rear terrace at second floor level: and associated external alterations prior to the expiry date of the permission.

    Granted Lawful development Loft or dormer 17 docs
  • Top Flat 102 Shirland Road London W9 2EQ

    26/01063/FULL Submitted 19 Feb 2026 50 yards away

    88% historically approved · decision due ~21 May

    Erection of a rear extension on the closet wing at half landing between first and second floors and a terrace leading off this.

    Awaiting decision Full applications Extension 17 docs

In Westminster

  • 26/07528/FULL Awaiting decision

    69 Eaton Place London SW1X 8DF

    Installation of new cast iron water pipe on rear courtyard elevation. (Linked with 26/07529/LBC)

    Received 5 Nov, published by the council 6 Nov 2026 Full applications
  • 26/05200/FULL Decided

    1 The Court House 165 Seymour Place London W1H 4PU

    Installation of waterproofing system to the existing lead flat roofs

    Received 3 Aug, published by the council 28 Aug 2026 Full applications
  • 26/07521/FULL Awaiting decision

    Flat 18 Harlequin Court 20 Tavistock Street London WC2E 7NZ

    Installation of one external condenser unit

    Received 4 Nov, published by the council 6 Nov 2026 Full applications
  • 26/07508/FULL Awaiting decision

    Buckingham Palace The Mall London SW1A 1AA

    Replacement of existing security lighting to the Buckingham Palace Forecourt with 80 compact LED spotlights installed within the lantern clusters across 10 principal piers, with associated concealed cabling and reversible fixings. (Linked with 26/07509/LBC)

    Received 4 Nov, published by the council 5 Nov 2026 Full applications
  • 26/07472/FULL Awaiting decision

    Flat 3 82 New Cavendish Street London W1G 9TA

    Replacement windows to second floor level with vacuum, double glazing windows. (Linked with 26/07473/LBC)

    Received 3 Nov, published by the council 6 Nov 2026 Full applications