Skip to content
PlanIndex Get alerts
Menu

Planning application

26 Connaught Street London W2 2AF

Awaiting decision Westminster 25/07640/LBC Listed Building Consent Application

Still open. Anyone can comment while the consultation period runs, and comments go to the council rather than to us.

Proposal

Replacement of pavement light with tiles to front forecourt.

As published by the council, reference 25/07640/LBC

Application record

Reference
25/07640/LBC
Type
Listed Building Consent Application
Status
Pending
Received
22 Oct 2025
Validated
27 Oct 2025
Ward
Hyde Park
Postcode
W2 2AF

Timeline

Dates from the published record

  1. 22 Oct 2025

    Received by Westminster

  2. 27 Oct 2025

    Validated

    Checked as complete and ready for consideration.

  3. 21 Jul 2026

    Added to PlanIndex

  4. Decision

    Awaiting decision

    Decision expected by 22 December 2025, 8 weeks from validation under the statutory target for most applications. Extensions of time are common and are agreed case by case.

    Westminster took a median of 91 days over the applications it decided in the last year.

Who's behind it

Company information only, from the register and Companies House

Colliers Agent, registered in Nottingham

Dissolved · incorporated 2008 · Nottingham

25 applications on PlanIndex · across 17 councils · 100% granted

Trade members see everything this firm has filed, how it was decided, and get an email the day it files again.

See their track record

Documents

Plans, drawings, consultee responses and the officer's report

11 documents on file for this application

A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.

Watch members (£5 a month) open the document list from here.

Open the documents

What happens while it is decided

This application is with Westminster for determination, against a statutory target of eight weeks. Over the last year Westminster decided heritage and listed building applications in a median of 119 days. More in our guide to how long planning decisions take.

About heritage and listed building applications

Listed building consent is needed for works that affect the special interest of a listed building, and carrying out such works without it is a criminal offence. More in our guide to planning application types.

Nearby applications

Within 0.3 miles

  • 28 Connaught Street London

    26/00170/LBC Submitted 13 Jan 2026 50 yards away

    90% historically approved · decision due ~10 Mar

    Refurbishment and alterations to ground floor and basement shop and maisonette above, including internal and external works, refurbishment and replacement of windows, structural works, installation of PV panels, mechanical plant, and associated works to enable environmental retrofit of building. (Linked with 26/00169/FULL)

    Awaiting decision Heritage and listed buildings Windows or glazing 34 docs
  • 28 Connaught Street London

    26/00169/FULL Submitted 13 Jan 2026 50 yards away

    88% historically approved · decision due ~10 Mar

    Refurbishment and alterations to ground floor and basement shop and maisonette above, including internal and external works, refurbishment and replacement of windows, structural works, installation of PV panels, mechanical plant, and associated works to enable environmental retrofit of building. (Linked with 26/00170/LBC)

    Awaiting decision Full applications Windows or glazing 37 docs
  • Basement And Ground Floor 12 Connaught Street London W2 2AF

    26/04045/ADV Submitted 18 Jun 2026 50 yards away

    82% historically approved · decision due ~13 Aug

    Display of a retractable fabric awning positioned above the ground floor shopfront with lettering (Retrospective). (Linked with 26/03668/LBC)

    Decided Advertising Windows or glazing
  • 42 Kendal Street London W2 2BU

    25/08338/LBC Submitted 14 Nov 2025 50 yards away

    Internal layout alterations and associated works.

    Refused Heritage and listed buildings 10 docs
  • Basement And Ground Floor 12 Connaught Street London W2 2AF

    26/03668/LBC Submitted 4 Jun 2026 50 yards away

    90% historically approved · decision due ~13 Aug

    Installation of retractable fabric awning positioned above the ground floor shopfront (Retrospective). (Linked with 26/04045/ADV)

    Awaiting decision Heritage and listed buildings Windows or glazing 11 docs
  • 22 Kendal Street London W2 2AW

    26/07260/FULL Submitted 22 Oct 2026 50 yards away

    88% historically approved · decision due ~17 Dec

    Installation of new glazed shopfront.

    Awaiting decision Full applications Windows or glazing

In Westminster

  • 26/07529/LBC Awaiting decision

    69 Eaton Place London SW1X 8DF

    Installation of new cast iron water supply pipe on rear courtyard elevation. (Linked with 26/07528/FULL)

    Received 5 Nov, published by the council 6 Nov 2026 Heritage and listed buildings
  • 26/07509/LBC Awaiting decision

    Buckingham Palace The Mall London SW1A 1AA

    Replacement of existing security lighting to the Buckingham Palace Forecourt with 80 compact LED spotlights installed within the lantern clusters across 10 principal piers, with associated concealed cabling and reversible fixings. (Linked with 26/07508/FULL)

    Received 4 Nov, published by the council 5 Nov 2026 Heritage and listed buildings
  • 26/07473/LBC Awaiting decision

    Flat 3 82 New Cavendish Street London W1G 9TA

    Replacement windows to second floor level with vacuum, double glazing windows. (Linked with 26/07472/FULL)

    Received 3 Nov, published by the council 6 Nov 2026 Heritage and listed buildings
  • 26/07471/LBC Awaiting decision

    12 Queen Anne's Gate London SW1H 9AA

    Excavation of single-storey basement, internal reconfiguration and installation of modern services. (Linked with 26/07470/FULL)

    Received 3 Nov, published by the council 5 Nov 2026 Heritage and listed buildings
  • 26/07461/LBC Awaiting decision

    1 Savile Row London W1S 3JR

    Minor internal works comprising redecoration and upgrades to lighting, flooring and bathroom and kitchen facilities, together with external works including new lighting and signage.

    Received 3 Nov, published by the council 5 Nov 2026 Heritage and listed buildings