Skip to content
PlanIndex Get alerts
Menu

Planning application

Ladbroke Apartments 3 Welbeck Street London W1G 0AR

Awaiting decision Westminster 25/07059/FULL Full Planning Permission Application

Relates to 25/07060/LBC

Still open. Anyone can comment while the consultation period runs, and comments go to the council rather than to us.

Proposal

Amalgamation of a 2-bedroom apartment (Apartment 10) and a 1-bedroom apartment (Apartment 11) to create 1no. 3-bedroom apartment; and other associated works. Linked with 25/07060/LBC

As published by the council, reference 25/07059/FULL

Application record

Reference
25/07059/FULL
Type
Full Planning Permission Application
Status
Pending
Received
1 Oct 2025
Validated
16 Oct 2025
Ward
West End
Postcode
W1G 0AR

Site history

Applications at this address on the Westminster register

This site has had 4 applications since 2025: 2 approved, 0 refused.

  • 25/07158/FULL Granted

    Ladbroke Apartments 3 Welbeck Street London W1G 0AR

    Installation of brass handrails to the front entrance.

    Decided 20 Nov 2025 Full applications
  • 25/07159/LBC Granted

    Ladbroke Apartments 3 Welbeck Street London W1G 0AR

    Installation of brass handrails to the front entrance.

    Decided 20 Nov 2025 Heritage and listed buildings
  • 25/07060/LBC Awaiting decision

    Ladbroke Apartments 3 Welbeck Street London W1G 0AR

    Amalgamation of a 2-bedroom apartment (Apartment 10) and a 1-bedroom apartment (Apartment 11) to create 1no. 3-bedroom apartment; and other associated works. Linked with 25/07059/FULL

    Submitted 1 Oct 2025 Heritage and listed buildings

Timeline

Dates from the published record

  1. 1 Oct 2025

    Received by Westminster

  2. 16 Oct 2025

    Validated

    Checked as complete and ready for consideration.

  3. 21 Jul 2026

    Added to PlanIndex

  4. Decision

    Awaiting decision

    Decision expected by 11 December 2025, 8 weeks from validation under the statutory target for most applications. Extensions of time are common and are agreed case by case.

    Westminster took a median of 66 days over the applications it decided in the last year.

Cases linked to this one on the register

  • 25/07060/LBC Awaiting decision

    Ladbroke Apartments 3 Welbeck Street London W1G 0AR

    Amalgamation of a 2-bedroom apartment (Apartment 10) and a 1-bedroom apartment (Apartment 11) to create 1no. 3-bedroom apartment; and other associated works. Linked with 25/07059/FULL

    Submitted 1 Oct 2025 Heritage and listed buildings

1 later application on the register refers to this one:

  • 25/07060/LBC Awaiting decision

    Ladbroke Apartments 3 Welbeck Street London W1G 0AR

    Amalgamation of a 2-bedroom apartment (Apartment 10) and a 1-bedroom apartment (Apartment 11) to create 1no. 3-bedroom apartment; and other associated works. Linked with 25/07059/FULL

    Submitted 1 Oct 2025 Heritage and listed buildings

Documents

Plans, drawings, consultee responses and the officer's report

40 documents on file for this application

A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.

Watch members (£5 a month) open the document list from here.

Open the documents

What happens while it is decided

This application is with Westminster for determination, against a statutory target of eight weeks. Over the last year Westminster decided full applications in a median of 91 days. More in our guide to how long planning decisions take.

About full applications

A full application seeks permission for a complete, detailed proposal in one go, with siting, design, access and landscaping all fixed at this stage. More in our guide to planning application types.

Nearby applications

Within 0.3 miles

  • Ladbroke Apartments 3 Welbeck Street London W1G 0AR

    25/07158/FULL Submitted 3 Oct 2025 50 yards away

    Installation of brass handrails to the front entrance.

    Granted Full applications 17 docs
  • Ladbroke Apartments 3 Welbeck Street London W1G 0AR

    25/07159/LBC Submitted 3 Oct 2025 50 yards away

    Installation of brass handrails to the front entrance.

    Granted Heritage and listed buildings 17 docs
  • Ladbroke Apartments 3 Welbeck Street London W1G 0AR

    25/07060/LBC Submitted 1 Oct 2025 50 yards away

    90% historically approved · decision due ~11 Dec

    Amalgamation of a 2-bedroom apartment (Apartment 10) and a 1-bedroom apartment (Apartment 11) to create 1no. 3-bedroom apartment; and other associated works. Linked with 25/07059/FULL

    Awaiting decision Heritage and listed buildings 38 docs
  • 33 Wigmore Street London W1U 1QX

    25/06280/LBC Submitted 4 Sep 2025 50 yards away

    Installation of a louvre on the external elevation and an external duct to the existing level 6 terrace.

    Granted Heritage and listed buildings 17 docs
  • 33 Wigmore Street London W1U 1QX

    25/06279/FULL Submitted 4 Sep 2025 50 yards away

    Installation of a louvre on the external elevation and an external duct to the existing level 6 terrace.

    Granted Full applications 19 docs
  • 33 Wigmore Street London W1U 1QX

    26/03828/LBC Submitted 11 Jun 2026 50 yards away

    90% historically approved · decision due ~6 Aug

    Installation of new air handling unit on the roof and extension of the existing acoustic plant screen; internal alterations.

    Decided Heritage and listed buildings Extension

In Westminster

  • 26/06295/FULL Awaiting decision

    15 Warwick Way London SW1V 1QT

    Installation of a new shopfront with Medication Dispensing Outlet.

    Received 15 Sep, published by the council 17 Sep 2026 Full applications
  • 26/06297/FULL Awaiting decision

    15 Warwick Way London SW1V 1QT

    Alterations to rear elevation at basement level comprising replacement window and installation of double opening door.

    Received 15 Sep, published by the council 17 Sep 2026 Full applications
  • 26/06294/FULL Awaiting decision

    15 Eaton Mews South London SW1W 9HP

    Installation of railings and sliding lantern light at main roof level in connection with the use of the roof as a terrace.

    Received 15 Sep, published by the council 22 Sep 2026 Full applications
  • 26/06317/FULL Awaiting decision

    124 Hamilton Terrace London NW8 9UT

    Replacement of existing first-floor sash windows to the front and rear elevations with traditionally detailed painted timber, slim-profile double-glazed sash windows. (Linked to 26/06318/LBC)

    Received 15 Sep, published by the council 22 Sep 2026 Full applications
  • 26/06273/FULL Awaiting decision

    9A Grosvenor Square London W1K 5AE

    Installation of natural Portland Stone paving to two front entrances. (Linked to 26/05473/LBC)

    Received 14 Sep, published by the council 22 Sep 2026 Full applications