Skip to content
PlanIndex Get alerts
Menu

Planning application

25/06933/FULL

40 - 42 Chiltern Street London W1U 7QN

Awaiting decision Westminster Full Planning Permission Application

Proposal

Installation of two wall mounted electric heaters, four wall lamps and two awnings. (Linked with 25/06934/ADV)

As published by the council, reference 25/06933/FULL

Timeline

Dates from the published record

  1. 26 Sep 2025

    Received by Westminster

  2. 6 Oct 2025

    Validated

    Checked as complete and ready for consideration.

  3. 21 Jul 2026

    Added to PlanIndex

  4. Decision

    Awaiting decision

    The statutory target is eight weeks for most applications and thirteen for major development. Extensions of time are common.

What happens while it is decided

The process from here

This application is with Westminster for determination. The council publicises it, consults neighbours and technical bodies where required, and weighs the responses against local and national planning policy.

The statutory target is eight weeks for most applications and thirteen for major development, though extensions of time are common. Comments carry most weight while the case is undecided, so check the council portal for the deadline if you want to respond.

About full applications applications

How this application type works

A full application seeks permission for a complete, detailed proposal in one go: siting, design, access and landscaping are all fixed at this stage. It is the standard route for new buildings, conversions and changes of use. The statutory target is eight weeks for smaller schemes and thirteen weeks for major development, though complex cases often take longer by agreement.

More on full applications applications in our guide

Nearby applications

Within 500 metres

  • 25/06934/ADV Awaiting decision

    40 - 42 Chiltern Street London W1U 7QN

    Display of two non-illuminated fascia signs each measuring 0.50m x 0.12m and a non-illuminated hanging sign measuring 0.38m x 0.38m. (Linked with 25/06933/FULL)

    26 Sep 2025 0m away Advertising
  • 26/02432/FULL Awaiting decision

    44 Chiltern Street London W1U 7QP

    Installation of two external air conditioning condenser units positioned at ground floor level, on top of the existing light well roof.

    14 Apr 2026 8m away Full applications
  • 25/06012/ADV Granted

    44 Chiltern Street London W1U 7QP

    Display of three vinyls on the external ground floor windows for a temporary period of one year from 01 September 2025 until 31 August 2026.

    22 Aug 2025 10m away Advertising
  • 25/06900/ADFULL Awaiting decision

    52 Dorset Street London W1U 7NQ

    Detailed drawings (1:10 and 1:5) of the new windows including sectional drawings showing the glazing bars pursuant to Condition 3 of planning permission dated 11 September 2025 (RN25/03519/FULL)

    25 Sep 2025 20m away Full applications
  • 26/04420/FULL Awaiting decision

    33 Manchester Street London W1U 7LQ

    Replacement of windows and door at all revelations with new double glazed units and installation of secondary glazing to existing single glazed historic windows. (Linked with 26/04421/LBC)

    3 Jul 2026 23m away Full applications
  • 26/04421/LBC Awaiting decision

    33 Manchester Street London W1U 7LQ

    Replacement of windows and door at all revelations with new double glazed units and installation of secondary glazing to existing single glazed historic windows. (Linked with 26/04420/FULL)

    3 Jul 2026 23m away Heritage and listed buildings

In Westminster

  • 26/04824/ADFULL Granted

    New Zealand House 80 Haymarket London SW1Y 4TE

    Detailed design and specification of new blinds to NZH based on mock-up trials on-site. pursuant to condition 32 (i) of planning permission dated 8th April 2024 (23/00571/FULL).

    20 Jul 2026 Full applications
  • 26/04829/ADFULL Granted

    New Zealand House 80 Haymarket London SW1Y 4TE

    Details of external and internal signage strategy pursuant to Condition 33(E) of planning permission dated 8th April 2024 (RN: 23/00571/FULL)

    20 Jul 2026 Full applications
  • 26/04841/ADFULL Granted

    29 Henstridge Place London NW8 6QD

    Details of the facing materials you will use, including glazing, and elevations and roof plans annotated to show where the materials are to be located pursuant to condition 5 of planning permission dated 18th November 2025 (RN:25/06159).

    20 Jul 2026 Full applications
  • 26/04989/FULL Awaiting decision

    1 Kildare Terrace London W2 5JT

    Erection of a mansard roof extending over the main house and side wing, replacement lower ground rear extension with roof terrace above, lowering of lower ground floor slab, installation of an air source heat pump in rear garden, new front boundary treatment, and new second floor window on the north elevation.

    24 Jul 2026 Full applications
  • 26/04986/FULL Awaiting decision

    Inver Court Inverness Terrace London W2 6JB

    Replacement of combustible materials in the render facades; timber decking and plastic soffits/ fascias to terraces with non-combustible materials on the 5th and 6th floors.

    24 Jul 2026 Full applications