Planning application
Basement And Ground Floor 37 South Molton Street London W1K 5RJ
Works: Windows or glazing
Permission granted. Work must normally begin within three years of the decision or the permission lapses.
Proposal
Redecoration of shopfront.
As published by the council, reference 25/06864/FULL
Application record
- Reference
- 25/06864/FULL
- Type
- Full Planning Permission Application
- Status
- Decided
- Decision
- Granted As published: Application Permitted
- Received
- 24 Sep 2025
- Validated
- 24 Sep 2025
- Decided
- 14 Nov 2025
- Ward
- West End
- Decision by
- Delegated Decision
- Postcode
- W1K 5RJ
Site history
Applications at this address on the Westminster register
This site has had 4 applications since 2025: 2 approved, 0 refused.
-
26/03669/ADV Awaiting decision
Basement And Ground Floor 37 South Molton Street London W1K 5RJ
Display of non illuminated individual letters each measuring 0.2m x 1.41m.
-
26/02460/ADV Awaiting decision
Basement And Ground Floor 37 South Molton Street London W1K 5RJ
Display of one internally illuminated (letters only) sign measuring 0.3m x 2.11m.
-
25/06865/ADV Granted
Basement And Ground Floor 37 South Molton Street London W1K 5RJ
Display of externally illuminated fascia sign measuring 4.225m x 0.4m
Timeline
Dates from the published record
-
24 Sep 2025
Received by Westminster
-
14 Nov 2025
Decision issued: Application Permitted
-
21 Jul 2026
Added to PlanIndex
Who's behind it
Company information only, from the register and Companies House
PNW Studios Ltd Agent, registered in Twickenham
Active · incorporated 2015 · Twickenham
34 applications on PlanIndex · across 15 councils · 97% granted
Trade members see everything this firm has filed, how it was decided, and get an email the day it files again.
See their track recordDocuments
Plans, drawings, consultee responses and the officer's report
15 documents on file for this application
A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.
Watch members (£5 a month) open the document list from here.
Open the documentsWhat this grant of permission means
Westminster granted permission on 14 November 2025, subject to any conditions on the decision notice. Work must normally begin within three years or the permission lapses. More in our guide to what happens after a planning decision.
About full applications
A full application seeks permission for a complete, detailed proposal in one go, with siting, design, access and landscaping all fixed at this stage. More in our guide to planning application types.
Nearby applications
Within 0.3 miles
-
Basement And Ground Floor 37 South Molton Street London W1K 5RJ
Display of externally illuminated fascia sign measuring 4.225m x 0.4m
Granted Advertising 11 docs -
Basement And Ground Floor 37 South Molton Street London W1K 5RJ
84% historically approved · decision due ~10 Jun
Display of one internally illuminated (letters only) sign measuring 0.3m x 2.11m.
Awaiting decision Advertising 7 docs -
Basement And Ground Floor 37 South Molton Street London W1K 5RJ
84% historically approved · decision due ~30 Jul
Display of non illuminated individual letters each measuring 0.2m x 1.41m.
Awaiting decision Advertising 7 docs -
34 - 36 South Molton Street London W1K 5RG
84% historically approved · decision due ~16 Sep
Display of internally illuminated fascia sign measuring 0.50m x 4.88m and an internally illuminated projecting sign measuring 0.50m x 0.57m.
Awaiting decision Advertising 7 docs -
Lampost Outside 369 Oxford Street London W1C 2JW
Erection of telecommunication equipment to lamp post.
Decided Telecoms 3 docs -
Ground Floor And First Floor Part 373 Oxford Street London W1C 2JR
Display of internally illuminated fascia and hanging signs measuring 0.76 x 0.9m and 0.42 x 0.5m.
Granted Advertising 11 docs
Other full applications
In Westminster
-
26/06295/FULL Awaiting decision
15 Warwick Way London SW1V 1QT
Installation of a new shopfront with Medication Dispensing Outlet.
-
26/06297/FULL Awaiting decision
15 Warwick Way London SW1V 1QT
Alterations to rear elevation at basement level comprising replacement window and installation of double opening door.
-
26/06294/FULL Awaiting decision
15 Eaton Mews South London SW1W 9HP
Installation of railings and sliding lantern light at main roof level in connection with the use of the roof as a terrace.
-
26/06273/FULL Awaiting decision
9A Grosvenor Square London W1K 5AE
Installation of new natural Portland Stone step surfaces to the two highway facing front entrance doors. (Linked to 26/05473/LBC)
-
26/06277/FULL Awaiting decision
Hospital 60 Grove End Road London NW8 9NH
Variation of conditions 1 and removal of condition 6 of planning permission dated 12th November 2019 (RN 19/07202/FULL) for the Variation of condition 12 of planning permission dated 21 June 2013 (RN: 13/01330/FULL) for the: Demolition of single storey block to north east elevation of main hospital building. Erection of three storey building (plus basement level) with link to existing hospital fronting onto Grove End Road and erection of two storey extension to the main entrance building, both to provide additional hospital accommodation (Class D1). Installation of mechanical plant and associated external alterations. NAMELY, to include amended phase 2 drawings and condition 6 to be removed as the as approved 11 car parking space are no longer proposed and the car lift is no longer shown on the amended plans.