Skip to content
PlanIndex Get alerts
Menu

Planning application

19 Carlton Hill London NW8 0JX

Granted Westminster 25/06714/FULL Full Planning Permission Application

Works: Extension Loft or dormer Small domestic

Read from the description, not a valuation. How we read the register

Permission granted. Work must normally begin within three years of the decision or the permission lapses.

Proposal

Loft conversion for new bedroom and ensuite with rear dormer and side (conservation style) skylight; erection of a single storey rear extension at lower ground floor level; new basement level under front garden for plant room and bicycle storage; and landscaping to front, side and rear gardens to improve ecology and environmental greening.

As published by the council, reference 25/06714/FULL

Application record

Reference
25/06714/FULL
Type
Full Planning Permission Application
Status
Decided
Decision
Application Permitted
Received
18 Sep 2025
Validated
18 Sep 2025
Decided
27 Feb 2026
Ward
Abbey Road
Decision by
Delegated Decision
Postcode
NW8 0JX

Timeline

Dates from the published record

  1. 18 Sep 2025

    Received by Westminster

  2. 27 Feb 2026

    Decision issued: Application Permitted

  3. 21 Jul 2026

    Added to PlanIndex

Documents

Plans, drawings, consultee responses and the officer's report

44 documents on file for this application

A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.

Trade members open them from here.

Open the documents

What this grant of permission means

Westminster granted permission on 27 February 2026, subject to any conditions on the decision notice. Work must normally begin within three years or the permission lapses. More in our guide to what happens after a planning decision.

About full applications

A full application seeks permission for a complete, detailed proposal in one go, with siting, design, access and landscaping all fixed at this stage. More in our guide to planning application types.

Nearby applications

Within 500 metres

  • 17 Carlton Hill London NW8 0JX

    25/08719/FULL Submitted 28 Nov 2025 13m away

    Erection of single story outbuilding in rear garden and installation of plant equipment.

    Granted Full applications 45 docs
  • 17 Carlton Hill London NW8 0JX

    20/06152/FULL Submitted 1 Oct 2020 14m away

    Replacement of roof and addition of a rear dormer window.

    Granted Full applications Loft or dormer Windows or glazing 21 docs
  • 27A Carlton Hill London NW8 0JX

    26/01171/ADFULL Submitted 24 Feb 2026 21m away

    87% historically approved · decision due ~21 Apr

    Details of green roof including biodiversity plan pursuant to condition 6 of planning permission dated 24 June 2025 (RN: 25/01314/FULL)

    Awaiting decision Full applications 10 docs
  • 29 Carlton Hill London NW8 0JX

    26/01532/FULL Submitted 10 Mar 2026 21m away

    87% historically approved · decision due ~5 May

    Erection of infill extension to front at ground floor level and associated lowering of internal floor, rear extensions at ground, first and second floor levels with terrace at first floor level, side extension at ground floor level and associated alterations.

    Awaiting decision Full applications Extension 13 docs
  • 25 Carlton Hill London NW8 0JX

    26/04546/TPO Submitted 8 Jul 2026 21m away

    100% historically approved · decision due ~2 Sep

    T1 - Mature Horse Chestnut- Reduce crown back to the previous established reduction points in order to maintain the historic management regime. Works will maintain the natural form and balance of the tree while retaining sufficient healthy furnishing growth for continued vitality and crown continuity. In addition, remove all epicormic and secondary growth arising from the main stem and scaffold limbs below the crown break to maintain a clear stem framework and overall tree form As an Arboricultural Approved contractor (#AC2626), all works will be undertaken in accordance with BS 39982010 - Tree Work - Recommendations. Reason for work: General tree maintenance

    Awaiting decision Trees
  • 37 Carlton Hill London NW8 0JX

    26/01814/TPO Submitted 19 Mar 2026 21m away

    100% historically approved · decision due ~19 May

    T1,T2,T3,T4,T5,T6,T7,T8- 8x Lime trees re pollard to most recent points by removing appropriate 1-2 metre re growth. The reason for tree works are to allow more light into the garden/house and to contain the size of the trees from outgrowing there space.

    Awaiting decision Trees 7 docs

In Westminster

  • 26/06295/FULL Awaiting decision

    15 Warwick Way London SW1V 1QT

    Installation of a new shopfront.

    15 Sep 2026 Full applications
  • 26/06297/FULL Awaiting decision

    15 Warwick Way London SW1V 1QT

    Alterations to rear elevation at basement level comprising repolacement window and installation of double opening door.

    15 Sep 2026 Full applications
  • 26/06234/FULL Awaiting decision

    40 Grosvenor Place London SW1X 7HJ

    Use of lower ground floor of Unit 3 and ground floor of Unit 2 as gym (Class E(d)) and/ or office (Class E(g))

    11 Sep 2026 Full applications
  • 26/06249/FULL Awaiting decision

    53 Wimpole Street London W1G 8YH

    Removal and Installation of external rear air condensers and associated pipe work to ground floor, including internal works to ground and first floor. (Linked with 26/06250/LBC)

    11 Sep 2026 Full applications
  • 26/03576/FULL Decided

    15A Devonshire Terrace London W2 3DW

    Erection of an infill extension to basement courtyard to form new bedroom and internal alterations. (Linked with 26/03577/LBC)

    1 Jun 2026 Full applications