Skip to content
PlanIndex Get alerts
Menu

Planning application

17 Carlton Hill London NW8 0JX

Granted Westminster 20/06152/FULL Full Planning Permission Application

Works: Loft or dormer Windows or glazing

Permission granted. Work must normally begin within three years of the decision or the permission lapses.

Proposal

Replacement of roof and addition of a rear dormer window.

As published by the council, reference 20/06152/FULL

Application record

Reference
20/06152/FULL
Type
Full Planning Permission Application
Status
Decided
Decision
Application Permitted
Received
1 Oct 2020
Validated
5 Nov 2020
Decided
22 Dec 2020
Ward
Abbey Road
Decision by
Delegated Decision
Postcode
NW8 0JX

Timeline

Dates from the published record

  1. 1 Oct 2020

    Received by Westminster

  2. 5 Nov 2020

    Validated

    Checked as complete and ready for consideration.

  3. 22 Dec 2020

    Decision issued: Application Permitted

  4. 20 Aug 2026

    Added to PlanIndex

Who's behind it

Company information only, from the register and Companies House

Agent on file, an architecture practice registered in Chesham

1 application on PlanIndex

Trade members see who it is, their full track record, and every application they have filed.

See who's behind it

Documents

Plans, drawings, consultee responses and the officer's report

21 documents on file for this application

A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.

Trade members open them from here.

Open the documents

What a grant of permission means

The process from here

Permission has been granted, usually subject to conditions listed on the decision notice, some of which must be discharged before work starts. The decision notice on the council portal sets out exactly what was approved.

Work must normally begin within three years of the decision or the permission lapses. Neighbours cannot appeal a grant; challenging one means judicial review of how the decision was made, within tight time limits.

About full applications applications

How this application type works

A full application seeks permission for a complete, detailed proposal in one go: siting, design, access and landscaping are all fixed at this stage. It is the standard route for new buildings, conversions and changes of use. The statutory target is eight weeks for smaller schemes and thirteen weeks for major development, though complex cases often take longer by agreement.

More on full applications applications in our guide

Nearby applications

Within 500 metres

  • 17 Carlton Hill London NW8 0JX

    25/08719/FULL Submitted 28 Nov 2025 5m away

    Erection of single story outbuilding in rear garden and installation of plant equipment.

    Granted Full applications 45 docs
  • 19 Carlton Hill London NW8 0JX

    25/06714/FULL Submitted 18 Sep 2025 14m away

    Loft conversion for new bedroom and ensuite with rear dormer and side (conservation style) skylight; erection of a single storey rear extension at lower ground floor level; new basement level under front garden for plant room and bicycle storage; and landscaping to front, side and rear gardens to improve ecology and environmental greening.

    Granted Full applications Extension Loft or dormer 44 docs
    Small domestic
  • 27A Carlton Hill London NW8 0JX

    26/01171/ADFULL Submitted 24 Feb 2026 23m away

    87% historically approved · decision due ~21 Apr

    Details of green roof including biodiversity plan pursuant to condition 6 of planning permission dated 24 June 2025 (RN: 25/01314/FULL)

    Awaiting decision Full applications 10 docs
  • 29 Carlton Hill London NW8 0JX

    26/01532/FULL Submitted 10 Mar 2026 23m away

    87% historically approved · decision due ~5 May

    Erection of infill extension to front at ground floor level and associated lowering of internal floor, rear extensions at ground, first and second floor levels with terrace at first floor level, side extension at ground floor level and associated alterations.

    Awaiting decision Full applications Extension 13 docs
  • 25 Carlton Hill London NW8 0JX

    26/04546/TPO Submitted 8 Jul 2026 23m away

    100% historically approved · decision due ~2 Sep

    T1 - Mature Horse Chestnut- Reduce crown back to the previous established reduction points in order to maintain the historic management regime. Works will maintain the natural form and balance of the tree while retaining sufficient healthy furnishing growth for continued vitality and crown continuity. In addition, remove all epicormic and secondary growth arising from the main stem and scaffold limbs below the crown break to maintain a clear stem framework and overall tree form As an Arboricultural Approved contractor (#AC2626), all works will be undertaken in accordance with BS 39982010 - Tree Work - Recommendations. Reason for work: General tree maintenance

    Awaiting decision Trees
  • 37 Carlton Hill London NW8 0JX

    26/01814/TPO Submitted 19 Mar 2026 23m away

    100% historically approved · decision due ~19 May

    T1,T2,T3,T4,T5,T6,T7,T8- 8x Lime trees re pollard to most recent points by removing appropriate 1-2 metre re growth. The reason for tree works are to allow more light into the garden/house and to contain the size of the trees from outgrowing there space.

    Awaiting decision Trees 7 docs

In Westminster

  • 26/06024/FULL Awaiting decision

    House Of Commons Palace Of Westminster Parliament Square London SW1A 0AA

    Installation of new and replacement electronic equipment within Speaker. (Linked with 26/06025/LBC)

    3 Sep 2026 Full applications
  • 26/06017/FULL Awaiting decision

    38 Lauderdale Mansions Lauderdale Road London W9 1NE

    Installation of an external AC Unit / Heat Pump at roof level.

    2 Sep 2026 Full applications
  • 26/05938/FULL Awaiting decision

    24 Vincent Square London SW1P 2NJ

    Subdivision of existing residential property to create two self-contained 3-bedroom family homes, along with cycle parking and associated external alterations.

    1 Sep 2026 Full applications
  • 26/05935/FULL Awaiting decision

    47 Hereford Road London W2 5AH

    Installation of one number new external condenser unit to the southerly elevation service alley.

    1 Sep 2026 Full applications
  • 26/05959/FULL Awaiting decision

    Basement And Ground Floor 50 New Bond Street London W1S 1BJ

    Installation of three new condensers on the roof, within an existing designated plant area.

    1 Sep 2026 Full applications