Skip to content
PlanIndex Get alerts
Menu

Planning application

25/06352/ADFULL

26 Leinster Square London W2 4NQ

Awaiting decision Westminster Approval of Details (Full PP)

Proposal

Details of implementation of Energy Reduction Scheme pursuant top condition 6 of a appeal decision dated 5th August 2025 (APP/X5990/W/25/3361064).

As published by the council, reference 25/06352/ADFULL

Timeline

Dates from the published record

  1. 8 Sep 2025

    Received by Westminster

  2. 21 Jul 2026

    Added to PlanIndex

  3. Decision

    Awaiting decision

    The statutory target is eight weeks for most applications and thirteen for major development. Extensions of time are common.

What happens while it is decided

The process from here

This application is with Westminster for determination. The council publicises it, consults neighbours and technical bodies where required, and weighs the responses against local and national planning policy.

The statutory target is eight weeks for most applications and thirteen for major development, though extensions of time are common. Comments carry most weight while the case is undecided, so check the council portal for the deadline if you want to respond.

About full applications applications

How this application type works

A full application seeks permission for a complete, detailed proposal in one go: siting, design, access and landscaping are all fixed at this stage. It is the standard route for new buildings, conversions and changes of use. The statutory target is eight weeks for smaller schemes and thirteen weeks for major development, though complex cases often take longer by agreement.

More on full applications applications in our guide

Nearby applications

Within 500 metres

  • 22/04041/ADFULL Refused

    26 Leinster Square London W2 4NQ

    Details of Operational Management Plan (OMP), detailed drawings of a soft landscaping scheme for the rear communal garden, how waste is to be stored on site and how materials for recycling will be stored separately and written approval details of how the development will reduce on-site energy demand pursuant to condition 3, 7, 9 & 10 of planning permission dated 29th November 2021 (RN: 21/04569/FULL).

    21 Jun 2022 0m away Full applications
  • 26/00116/LBC Granted

    Normandy Court 32 - 33 Kensington Gardens Square London W2 4BG

    Retrospective application for elevational treatment, scored stucco render to upper floors of front facade [Linked to 26/00115/FULL]

    9 Jan 2026 57m away Heritage and listed buildings
  • 26/00115/FULL Granted

    Normandy Court 32 - 33 Kensington Gardens Square London W2 4BG

    Retrospective application for elevational treatment, scored stucco render to upper floors of front facade [Linked to 26/00116/LBC]

    9 Jan 2026 57m away Full applications
  • 26/03450/LBC Awaiting decision

    Flat 7 42 Leinster Square London W2 4PU

    Retrospective application for alterations to top floor flat including removal of ceiling in reception room and bedroom; installation of mezzanine to bedroom; creation of escape dormer in roof space; insertion of rooflights and associated works.

    26 May 2026 58m away Heritage and listed buildings
  • 26/04426/FULL Awaiting decision

    Fourth Floor Flat 44 Leinster Square London W2 4PU

    Installation of railings to terrace and removal of lighting on roof. [Linked to 26/04427/LBC]

    3 Jul 2026 69m away Full applications
  • 26/04427/LBC Awaiting decision

    Fourth Floor Flat 44 Leinster Square London W2 4PU

    Installation of railings to terrace and removal of lighting on roof. [Linked to 26/04426/FULL]

    3 Jul 2026 69m away Heritage and listed buildings

In Westminster

  • 26/04824/ADFULL Granted

    New Zealand House 80 Haymarket London SW1Y 4TE

    Detailed design and specification of new blinds to NZH based on mock-up trials on-site. pursuant to condition 32 (i) of planning permission dated 8th April 2024 (23/00571/FULL).

    20 Jul 2026 Full applications
  • 26/04829/ADFULL Granted

    New Zealand House 80 Haymarket London SW1Y 4TE

    Details of external and internal signage strategy pursuant to Condition 33(E) of planning permission dated 8th April 2024 (RN: 23/00571/FULL)

    20 Jul 2026 Full applications
  • 26/04841/ADFULL Granted

    29 Henstridge Place London NW8 6QD

    Details of the facing materials you will use, including glazing, and elevations and roof plans annotated to show where the materials are to be located pursuant to condition 5 of planning permission dated 18th November 2025 (RN:25/06159).

    20 Jul 2026 Full applications
  • 26/04989/FULL Awaiting decision

    1 Kildare Terrace London W2 5JT

    Erection of a mansard roof extending over the main house and side wing, replacement lower ground rear extension with roof terrace above, lowering of lower ground floor slab, installation of an air source heat pump in rear garden, new front boundary treatment, and new second floor window on the north elevation.

    24 Jul 2026 Full applications
  • 26/04986/FULL Awaiting decision

    Inver Court Inverness Terrace London W2 6JB

    Replacement of combustible materials in the render facades; timber decking and plastic soffits/ fascias to terraces with non-combustible materials on the 5th and 6th floors.

    24 Jul 2026 Full applications