Planning application
25/06106/ADFULL
63 - 65 Goldney Road London W9 2AR
Proposal
Details of how waste is to be stored on site and how materials for recycling will be stored separately and details of a sample of the glass (at least 300mm square) pursuant to condition 6, 10 & 11 of planning permission dated 30th July 2021 (RN:21/03917/FULL)
As published by the council, reference 25/06106/ADFULL
Timeline
Dates from the published record
-
27 Aug 2025
Received by Westminster
-
13 Nov 2025
Validated
Checked as complete and ready for consideration.
-
21 Jul 2026
Added to PlanIndex
-
Decision
Awaiting decision
The statutory target is eight weeks for most applications and thirteen for major development. Extensions of time are common.
What happens while it is decided
The process from here
This application is with Westminster for determination. The council publicises it, consults neighbours and technical bodies where required, and weighs the responses against local and national planning policy.
The statutory target is eight weeks for most applications and thirteen for major development, though extensions of time are common. Comments carry most weight while the case is undecided, so check the council portal for the deadline if you want to respond.
About full applications applications
How this application type works
A full application seeks permission for a complete, detailed proposal in one go: siting, design, access and landscaping are all fixed at this stage. It is the standard route for new buildings, conversions and changes of use. The statutory target is eight weeks for smaller schemes and thirteen weeks for major development, though complex cases often take longer by agreement.
Nearby applications
Within 500 metres
-
25/05517/FULL Granted
63 Goldney Road London W9 2AR
Replacement shopfront.
-
25/05518/FULL Granted
65 Goldney Road London W9 2AR
Replacement shopfront.
-
25/05129/FULL Granted
47 Chippenham Road London W9 2AH
Alterations to shopfront to include the installation of brick bond roller shutter (Retrospective)
-
25/07920/CLEUD Awaiting decision
47 Chippenham Road London W9 2AH
Use of the basement as an independent flat for in excess of 4 years, prior to the date of this application and prior to the 2024 change in legislation, with 5 year tenancy agreements date 2010, 2015 and 2020, until the present day.
-
25/08297/TPO Awaiting decision
Kincardine Gardens London
Kincardine Gardens by bus stop T1 Lime x 1 (Tilia spp) This 12m previously reduced lime tree has missed several pruning cycles due to its proximity to the bus stop and TfL's unwillingness to suspend the bus stop. Suggested work: - crown reduction - reduce back to previous reduction points,equating to a reduction of 4m, leaving furnishing growth - retain 50% of internal fine branch structure Kincardine Gardens by green gate T2 Lime x 1 (Tilia spp) This 11m previously reduced lime tree is due its cyclical prune. Suggested work:- crown reduction - reduce back to previous reduction points, equating to a reduction of 2.5m, leaving furnishing growth - retain 50% of internal fine branch structure Kincardine Gardens on Harrow Road T3 Lime x 1 (Tilia spp) This 11m previously reduced lime tree is due its cyclical prune. Suggested work: - crown reduction - reduce back to previous reduction points equating to a reduction of 2.5m, leaving furnishing growth - retain 50% of internal fine branch structure Kincardine Gardens on Harrow Road T4 Lime x 1 (Tilia spp) This 11m previously reduced lime tree is due its cyclical prune. Suggested work: - crown reduction- reduce back to previous reduction points, equating to a reduction of 2.5m, leaving furnishing growth - retain 50% of internal fine branch structure
-
25/09246/NMA Refused
5 Grittleton Road London W9 2DD
Amendments to planning permission granted by Appeal Decision dated 26 August 2025 (WCC RN: 25/01993/FULL; Appeal Ref: APP/X5990/W/25/3367634) for the erection of a single-storey side and rear extension to lower ground floor flat. NAMELY, minor repositioning of the approved lightwell within the footprint of the consented rear extension. The lightwell remains of the same size, depth, and design as previously approved and continues to provide natural light and ventilation to the internal accommodation; and revised design and material to rear elevation doors from approved sets of timber French doors with Crittall-style bifolding doors.
Other full applications applications
In Westminster
-
26/04824/ADFULL Granted
New Zealand House 80 Haymarket London SW1Y 4TE
Detailed design and specification of new blinds to NZH based on mock-up trials on-site. pursuant to condition 32 (i) of planning permission dated 8th April 2024 (23/00571/FULL).
-
26/04829/ADFULL Granted
New Zealand House 80 Haymarket London SW1Y 4TE
Details of external and internal signage strategy pursuant to Condition 33(E) of planning permission dated 8th April 2024 (RN: 23/00571/FULL)
-
26/04841/ADFULL Granted
29 Henstridge Place London NW8 6QD
Details of the facing materials you will use, including glazing, and elevations and roof plans annotated to show where the materials are to be located pursuant to condition 5 of planning permission dated 18th November 2025 (RN:25/06159).
-
26/04989/FULL Awaiting decision
1 Kildare Terrace London W2 5JT
Erection of a mansard roof extending over the main house and side wing, replacement lower ground rear extension with roof terrace above, lowering of lower ground floor slab, installation of an air source heat pump in rear garden, new front boundary treatment, and new second floor window on the north elevation.
-
26/04986/FULL Awaiting decision
Inver Court Inverness Terrace London W2 6JB
Replacement of combustible materials in the render facades; timber decking and plastic soffits/ fascias to terraces with non-combustible materials on the 5th and 6th floors.