Skip to content
PlanIndex Get alerts
Menu

Planning application

High Holborn London Borough Of Camden London

Awaiting decision Westminster 25/05951/OBS Application for obs to adj boroughs

Still open. Anyone can comment while the consultation period runs, and comments go to the council rather than to us.

Proposal

[Multiple Addresses] Redevelopment of Selkirk House, 166 High Holborn, 1 Museum Street, 10-12 Museum Street, 35-41 New Oxford Street and 16A-18 West Central Street. Variation of conditions 2, 3, 4, 5, 6, 18, of planning permission 2024/4662/P dated 6 August 2025, namely to reflect design refinements across the One Museum Street, West Central Street, Vine Lane and High Holborn buildings, including minor changes to internal layouts, façade design adjustments to improve ventilation and daylighting, updated balustrades to meet fire requirements, revised entrances and active frontages, reconfigured and separated basements, relocated refuse stores and amenity areas.

As published by the council, reference 25/05951/OBS

Application record

Reference
25/05951/OBS
Type
Application for obs to adj boroughs
Status
Pending
Received
20 Aug 2025
Validated
20 Aug 2025
Ward
Obs For Adj Boroughs

Timeline

Dates from the published record

  1. 20 Aug 2025

    Received by Westminster

  2. 21 Jul 2026

    Added to PlanIndex

  3. Decision

    Awaiting decision

    Decision expected by 15 October 2025, 8 weeks from validation under the statutory target for most applications. Extensions of time are common and are agreed case by case.

    Westminster took a median of 61 days over the applications it decided in the last year.

Documents

Plans, drawings, consultee responses and the officer's report

1 document on file for this application

A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.

Trade members open them from here.

Open the documents

What happens while it is decided

This application is with Westminster for determination, against a statutory target of eight weeks. Over the last year Westminster's median decision took 61 days. More in our guide to how long planning decisions take.

About this record

The published feed does not state which type of application this is; the register entry on Westminster's portal will say. Our guide explains the common types.

Nearby applications

Within 500 metres

  • 1 Museum Street London WC1A 1JR

    2024/5746/P 30m away

    Details to discharge Condition 40 (Waste Water Heat) of planning reference 2023/2510/P dated 07/03/24 for redevelopment of Selkirk House, 166 High Holborn and 1 Museum Street following the substantial demolition of the existing NCP car park and former Travelodge Hotel to provide a mixed-use scheme, providing office, residential, and town centre uses at ground floor level. Works of part-demolition and refurbishment to 10-12 Museum Street, 35-41 New Oxford Street, and 16A-18 West Central Street to provide further town centre ground floor uses and residential floorspace, including affordable housing provision. Provision of new public realm including a new pedestrian route through the site to link West Central Street with High Holborn. Relocation of cycle hire docking stations on High Holborn.

    Granted Full applications Demolition
  • 1 Museum Street London WC1A 1JR

    2024/5282/P 30m away

    Details to part discharge Condition 23 (Arboricultural Method Statement) - pre-demolition, of planning reference 2023/2510/P dated 07/03/24 for redevelopment of Selkirk House, 166 High Holborn and 1 Museum Street following the substantial demolition of the existing NCP car park and former Travelodge Hotel to provide a mixed-use scheme, providing office, residential, and town centre uses at ground floor level. Works of part-demolition and refurbishment to 10-12 Museum Street, 35-41 New Oxford Street, and 16A-18 West Central Street to provide further town centre ground floor uses and residential floorspace, including affordable housing provision. Provision of new public realm including a new pedestrian route through the site to link West Central Street with High Holborn. Relocation of cycle hire docking stations on High Holborn.

    Granted Full applications Demolition
  • Selkirk House 166 High Holborn 1 Museum Street 10-12 Museum Street 35-41 New Oxford Street and 16A-18 West Central Street London WC1A 1JR

    2024/4662/P 30m away

    Variation of Condition 2 (Approved Plans) of planning permission reference 2023/2510/P dated 07/03/24, namely: to reflect proposed changes to the ground floor and basement (levels 1 and 2) layout, including a revised servicing strategy and associated alterations to entrances; alterations to core layout at upper floors; and changes to the elevations across the upper floors of 1 Museum Street including changes to the floor levels, additional glazing to the facade, introduction of inset terraces at levels 7, 10 and 15 and openable vent panels and revised BMU layout at roof level.

    Granted Full applications Windows or glazing
  • Selkirk House 166 High Holborn 1 Museum Street 10-12 Museum Street 35-41 New Oxford Street and 16A-18 West Central Street London WC1A 1JR

    2025/4874/P Submitted 29 Oct 2025 30m away

    Details to discharge Condition 24 (Bird & Bat Box Locations) of planning reference 2024/4662/P dated 06/08/25 for variation of Condition 2 (Approved Plans) of planning permission reference 2023/2510/P dated 07/03/24, namely: to reflect proposed changes to the ground floor and basement (levels 1 and 2) layout, including a revised servicing strategy and associated alterations to entrances; alterations to core layout at upper floors; and changes to the elevations across the upper floors of 1 Museum Street including changes to the floor levels, additional glazing to the facade, introduction of inset terraces at levels 7, 10 and 15 and openable vent panels and revised BMU layout at roof level.

    Granted Full applications Windows or glazing 7 docs
  • 1 Museum Street London WC1A 1JR

    2024/5745/P 30m away

    Details to discharge Condition 28 (Piling) of planning reference 2023/2510/P dated 07/03/24 for redevelopment of Selkirk House, 166 High Holborn and 1 Museum Street following the substantial demolition of the existing NCP car park and former Travelodge Hotel to provide a mixed-use scheme, providing office, residential, and town centre uses at ground floor level. Works of part-demolition and refurbishment to 10-12 Museum Street, 35-41 New Oxford Street, and 16A-18 West Central Street to provide further town centre ground floor uses and residential floorspace, including affordable housing provision. Provision of new public realm including a new pedestrian route through the site to link West Central Street with High Holborn. Relocation of cycle hire docking stations on High Holborn.

    Granted Full applications Demolition
  • 1 Museum Street London WC1A 1JR

    2024/5747/P 30m away

    Details to discharge Condition 43 (Rainwater Greywater) of planning reference 2023/2510/P dated 07/03/24 for redevelopment of Selkirk House, 166 High Holborn and 1 Museum Street following the substantial demolition of the existing NCP car park and former Travelodge Hotel to provide a mixed-use scheme, providing office, residential, and town centre uses at ground floor level. Works of part-demolition and refurbishment to 10-12 Museum Street, 35-41 New Oxford Street, and 16A-18 West Central Street to provide further town centre ground floor uses and residential floorspace, including affordable housing provision. Provision of new public realm including a new pedestrian route through the site to link West Central Street with High Holborn. Relocation of cycle hire docking stations on High Holborn.

    Granted Full applications Demolition