Skip to content
PlanIndex Get alerts
Menu

Planning application

25/05657/FULL

Brettenham House Lancaster Place London WC2E 7EN

Granted Westminster Full Planning Permission Application

Proposal

Re-positioning of the fire escape door on Savoy Street.

As published by the council, reference 25/05657/FULL

Timeline

Dates from the published record

  1. 12 Aug 2025

    Received by Westminster

  2. 19 Aug 2025

    Validated

    Checked as complete and ready for consideration.

  3. 6 Oct 2025

    Decision issued: Application Permitted

  4. 21 Jul 2026

    Added to PlanIndex

What a grant of permission means

The process from here

Permission has been granted, usually subject to conditions listed on the decision notice, some of which must be discharged before work starts. The decision notice on the council portal sets out exactly what was approved.

Work must normally begin within three years of the decision or the permission lapses. Neighbours cannot appeal a grant; challenging one means judicial review of how the decision was made, within tight time limits.

About full applications applications

How this application type works

A full application seeks permission for a complete, detailed proposal in one go: siting, design, access and landscaping are all fixed at this stage. It is the standard route for new buildings, conversions and changes of use. The statutory target is eight weeks for smaller schemes and thirteen weeks for major development, though complex cases often take longer by agreement.

More on full applications applications in our guide

Nearby applications

Within 500 metres

  • 25/08421/ADFULL Awaiting decision

    Brettenham House Lancaster Place London WC2E 7EN

    Details of a biodiversity management plan, pursuant to condition 5 of planning permission dated 26 June 2025 (RN 25/00968/FULL)

    18 Nov 2025 0m away Full applications
  • 25/08318/ADFULL Awaiting decision

    Brettenham House Lancaster Place London WC2E 7EN

    Detailed drawings of all new doors, windows, spandrels and samples of the facing materials you will use, including glazing, and elevations and roof plans annotated to show where the materials are to be located pursuant to conditions 4(iii) and 5 of planning permission dated 30th July 2024 (RN:24/01116).

    13 Nov 2025 0m away Full applications
  • 26/02258/TCA Awaiting decision

    The Queens Chapel Of The Savoy Savoy Hill London WC2R 0DA

    T1, London Plane Trees (Platanus ? hispanica), Garden Proposed works: Reduce crown by approximately 2?3 metres on all lateral aspects in order to provide clearance from buildings Justification: T1 (on the grounds of its proximity to the rear of 111 the Strand) Routine maintenance to contain size within garden space To improve access and light levels Promote healthy regrowth and fruit production Prevent encroachment onto neighbouring boundaries or structures

    2 Apr 2026 53m away Trees
  • 26/01251/CLLB Awaiting decision

    North Wing Courtauld Institute Of Art Somerset House Strand London WC2E 7EA

    Series of investigative works to the North Block.

    12 Feb 2026 53m away
  • 25/05035/TCA Awaiting decision

    The Queens Chapel Of The Savoy Savoy Hill London WC2R 0DA

    T1, T2 & T3 London Plane Trees (Platanus ? hispanica), Garden Proposed works: Reduce crown by approximately 2?3 metres in all aspects Returning to previous pollard points (re-pollard) Resulting dimensions: Final height approximately 11?12 metres, maintaining previous pollard framework Justification: Routine cyclical maintenance of previously pollarded trees To prevent excessive crown weight and risk of structural failure To contain size within appropriate bounds for the garden setting To manage light levels and leaf litter affecting surrounding area Compliance: All works to be carried out in accordance with BS 3998:2010 ? Recommendations for Tree Work T4 Mulberry (Morus spp.), Garden Proposed works: Formative crown reduction of up to 1 metre to maintain overall balance and shape Height to remain unchanged Current height: Approx. 4 metres Justification: Light formative pruning to encourage strong branch structure Maintain ornamental form and prevent asymmetry Improve long-term health and reduce likelihood of weak limb attachments T5 Fig Tree (Ficus carica), Garden Proposed works: Reduce height by approximately 2.5 metres Reduce lateral spread by 1?2 metres Current height: Approx. 6?7 metres Resulting dimensions: Final height approx. 4?4.5 metres, width reduced accordingly Justification: Routine maintenance to contain size within garden space To improve access and light levels Promote healthy regrowth and fruit production Prevent encroachment onto neighbouring boundaries or structures

    21 Jul 2025 54m away Trees
  • 25/08285/LBC Awaiting decision

    8 Victoria Embankment London WC2R 2AB

    Use of the site as High Quality West End Theatre / Cabaret & Music Venue / Event Space (to include Quality Dining and Bar use (Sui Generis); internal refurbishment and fit out of public seating areas, bar areas, WCs, dressing rooms, and back of house areas; and associated works. (Linked with 25/08284/FULL)

    12 Nov 2025 56m away Heritage and listed buildings

In Westminster

  • 26/04824/ADFULL Granted

    New Zealand House 80 Haymarket London SW1Y 4TE

    Detailed design and specification of new blinds to NZH based on mock-up trials on-site. pursuant to condition 32 (i) of planning permission dated 8th April 2024 (23/00571/FULL).

    20 Jul 2026 Full applications
  • 26/04829/ADFULL Granted

    New Zealand House 80 Haymarket London SW1Y 4TE

    Details of external and internal signage strategy pursuant to Condition 33(E) of planning permission dated 8th April 2024 (RN: 23/00571/FULL)

    20 Jul 2026 Full applications
  • 26/04841/ADFULL Granted

    29 Henstridge Place London NW8 6QD

    Details of the facing materials you will use, including glazing, and elevations and roof plans annotated to show where the materials are to be located pursuant to condition 5 of planning permission dated 18th November 2025 (RN:25/06159).

    20 Jul 2026 Full applications
  • 26/04989/FULL Awaiting decision

    1 Kildare Terrace London W2 5JT

    Erection of a mansard roof extending over the main house and side wing, replacement lower ground rear extension with roof terrace above, lowering of lower ground floor slab, installation of an air source heat pump in rear garden, new front boundary treatment, and new second floor window on the north elevation.

    24 Jul 2026 Full applications
  • 26/04986/FULL Awaiting decision

    Inver Court Inverness Terrace London W2 6JB

    Replacement of combustible materials in the render facades; timber decking and plastic soffits/ fascias to terraces with non-combustible materials on the 5th and 6th floors.

    24 Jul 2026 Full applications