Planning application
Christ Church Cosway Street London NW1 5BT
Relates to 25/05737/FULL
Still open. Anyone can comment while the consultation period runs, and comments go to the council rather than to us.
Proposal
Removal of the existing air handling unit and ductwork inside The Bell Tower, removal of the plasterboard ceiling to the underside of the floor supporting the existing air handling unit; instal new air handling unit and ductwork inside The Bell Tower, structural repairs to the floor supporting the new air handling unit and new fire rated plasterboard ceiling/access hatch to the underside of the floor supporting the new air handling unit. (Linked to 25/05737/FULL)
As published by the council, reference 25/05258/LBC
Application record
- Reference
- 25/05258/LBC
- Type
- Listed Building Consent Application
- Status
- Pending
- Received
- 28 Jul 2025
- Validated
- 14 Aug 2025
- Ward
- Church Street
- Postcode
- NW1 5BT
Site history
Applications at this address on the Westminster register
This site has had 4 applications since 2025.
-
26/01736/COLBC Awaiting decision
Christ Church Cosway Street London NW1 5BT
Internal works associated with creation of new tea point and table tennis store to ground floor. To note the tea point/store/DDA WC has received LBC/PP consent 23-05080-LBC/23-05079-FULL.
-
25/05737/FULL Awaiting decision
Christ Church Cosway Street London NW1 5BT
Removal of the existing air handling unit and ductwork inside The Bell Tower, removal of the plasterboard ceiling to the underside of the floor supporting the existing air handling unit; instal new air handling unit and ductwork inside The Bell Tower, structural repairs to the floor supporting the new air handling unit and new fire rated plasterboard ceiling/access hatch to the underside of the floor supporting the new air handling unit. (Linked to 25/05258/LBC)
-
25/02982/LBC Awaiting decision
Christ Church Cosway Street London NW1 5BT
Installation of a new steel structure to support the existing reinforced concrete slab on the north, south and west side of the main hall including new pad stones to support the existing/proposed steel beams.
Timeline
Dates from the published record
-
28 Jul 2025
Received by Westminster
-
14 Aug 2025
Validated
Checked as complete and ready for consideration.
-
21 Jul 2026
Added to PlanIndex
-
Decision
Awaiting decision
Decision expected by 9 October 2025, 8 weeks from validation under the statutory target for most applications. Extensions of time are common and are agreed case by case.
Westminster took a median of 66 days over the applications it decided in the last year.
Related applications
Cases linked to this one on the register
-
25/05737/FULL Awaiting decision
Christ Church Cosway Street London NW1 5BT
Removal of the existing air handling unit and ductwork inside The Bell Tower, removal of the plasterboard ceiling to the underside of the floor supporting the existing air handling unit; instal new air handling unit and ductwork inside The Bell Tower, structural repairs to the floor supporting the new air handling unit and new fire rated plasterboard ceiling/access hatch to the underside of the floor supporting the new air handling unit. (Linked to 25/05258/LBC)
1 later application on the register refers to this one:
-
25/05737/FULL Awaiting decision
Christ Church Cosway Street London NW1 5BT
Removal of the existing air handling unit and ductwork inside The Bell Tower, removal of the plasterboard ceiling to the underside of the floor supporting the existing air handling unit; instal new air handling unit and ductwork inside The Bell Tower, structural repairs to the floor supporting the new air handling unit and new fire rated plasterboard ceiling/access hatch to the underside of the floor supporting the new air handling unit. (Linked to 25/05258/LBC)
Who's behind it
Company information only, from the register and Companies House
Feilden+Mawson LLP Agent, registered in Norfolk
Active · incorporated 2001 · Norfolk
54 applications on PlanIndex · across 7 councils · 100% granted
Trade members see everything this firm has filed, how it was decided, and get an email the day it files again.
See their track recordDocuments
Plans, drawings, consultee responses and the officer's report
23 documents on file for this application
A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.
Watch members (£5 a month) open the document list from here.
Open the documentsWhat happens while it is decided
This application is with Westminster for determination, against a statutory target of eight weeks. Over the last year Westminster decided heritage and listed building applications in a median of 94 days. More in our guide to how long planning decisions take.
About heritage and listed building applications
Listed building consent is needed for works that affect the special interest of a listed building, and carrying out such works without it is a criminal offence. More in our guide to planning application types.
Nearby applications
Within 0.3 miles
-
Christ Church Cosway Street London NW1 5BT
87% historically approved · decision due ~9 Oct
Removal of the existing air handling unit and ductwork inside The Bell Tower, removal of the plasterboard ceiling to the underside of the floor supporting the existing air handling unit; instal new air handling unit and ductwork inside The Bell Tower, structural repairs to the floor supporting the new air handling unit and new fire rated plasterboard ceiling/access hatch to the underside of the floor supporting the new air handling unit. (Linked to 25/05258/LBC)
Awaiting decision Full applications 21 docs -
Christ Church Cosway Street London NW1 5BT
90% historically approved · decision due ~25 Jun
Installation of a new steel structure to support the existing reinforced concrete slab on the north, south and west side of the main hall including new pad stones to support the existing/proposed steel beams.
Awaiting decision Heritage and listed buildings 16 docs -
Christ Church Cosway Street London NW1 5BT
90% historically approved · decision due ~6 May
Internal works associated with creation of new tea point and table tennis store to ground floor. To note the tea point/store/DDA WC has received LBC/PP consent 23-05080-LBC/23-05079-FULL.
Awaiting decision Heritage and listed buildings 14 docs -
Portman House 10 Daventry Street London NW1 5NX
86% historically approved · decision due ~31 Aug
Use of the building as a hostel (sui generis use) comprising communal residential accommodation in single rooms on a non-self-contained basis, with shared kitchens, bathrooms / WCs and communal facilities.
Awaiting decision Lawful development 22 docs -
Adjacent To 2 Bendall Mews London NW1 6SN
Details of Thames yellow brick pursuant to Condition 4a of planning permission granted on appeal dated 14 August 2003 (RN: 02/08190).
Granted Full applications 1 doc -
5 Bendall Mews London NW1 6SN
Details of obscured glazed window pursuant to Condition 7 of planning permission dated 20 March 2007 (RN: 07/01131).
Granted Full applications Windows or glazing 2 docs
Other heritage and listed building applications
In Westminster
-
26/04878/LBC Decided
34 Grosvenor Street London W1K 4QU
Internal works to facilitate the subdivision of 34 Grosvenor Street and 3 Three Kings Yard
-
26/06299/LBC Awaiting decision
Apartment 33 24 Park Crescent London W1B 1AA
Alterations to internal partitions, door openings, doors and floor finishes.
-
26/06305/LBC Awaiting decision
33A Dean Street London W1D 4PP
Installation of new concrete slab with drainage channels at basement level and new fire surround in B.01.
-
26/06318/LBC Awaiting decision
124 Hamilton Terrace London NW8 9UT
Replacement of existing first-floor sash windows to the front and rear elevations with traditionally detailed painted timber, slim-profile double-glazed sash windows. (Linked to 26/06317/FULL)
-
26/04141/LBC Decided
80E Randolph Avenue London W9 1BG
Replacement of sashes in two front windows at 2nd floor level and one rear window with slimline double glazed timber sashes. (Linked with 26/04142/FULL)