Planning application
Flat 3 69 Berwick Street London W1F 8SY
Works: Extension Windows or glazing
Still open. Anyone can comment while the consultation period runs, and comments go to the council rather than to us.
Proposal
Replacement of existing orangery at fifth floor level (like-for-like) with timber and double glazed roof panels; replacement timber deck on terrace including railings; replacement windows at fourth floor level; new rain water pipe to connect existing drainage; and other associated works.
As published by the council, reference 25/05246/FULL
Application record
- Reference
- 25/05246/FULL
- Type
- Full Planning Permission Application
- Status
- Pending
- Received
- 28 Jul 2025
- Validated
- 28 Jul 2025
- Ward
- West End
- Postcode
- W1F 8SY
Timeline
Dates from the published record
-
28 Jul 2025
Received by Westminster
-
21 Jul 2026
Added to PlanIndex
-
Decision
Awaiting decision
Decision expected by 22 September 2025, 8 weeks from validation under the statutory target for most applications. Extensions of time are common and are agreed case by case.
Westminster took a median of 91 days over the applications it decided in the last year.
Who's behind it
Company information only, from the register and Companies House
Bishop and Associates Agent, registered in Birmingham
Active · incorporated 2015 · Birmingham
5 applications on PlanIndex · across 2 councils
Trade members see everything this firm has filed, how it was decided, and get an email the day it files again.
See their track recordDocuments
Plans, drawings, consultee responses and the officer's report
10 documents on file for this application
A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.
Watch members (£5 a month) open the document list from here.
Open the documentsWhat happens while it is decided
This application is with Westminster for determination, against a statutory target of eight weeks. Over the last year Westminster decided full applications in a median of 119 days. More in our guide to how long planning decisions take.
About full applications
A full application seeks permission for a complete, detailed proposal in one go, with siting, design, access and landscaping all fixed at this stage. More in our guide to planning application types.
Nearby applications
Within 0.3 miles
-
Basement And Ground Floor 68 Berwick Street London W1F 8SY
82% historically approved · decision due ~19 Aug
Display of one non-illuminated fascia (lettering) sign and one projecting sign measuring 0.65m x 0.2m.
Decided Advertising 11 docs -
First Floor 9 D'Arblay Street London W1F 8DR
Use of first floor for residential purposes.
Granted Full applications 6 docs -
8 D'Arblay Street London W1F 8DP
Removal of HVAC vent from modified window on Berwick St elevation and reinstatement of original window.
Granted Full applications Windows or glazing 7 docs -
12 D'Arblay Street London W1F 8DU
Use of the building as Commercial, Business and Service (Class E) use.
Granted Lawful development 10 docs -
Noel Street London
82% historically approved · decision due ~5 Feb
Display of double sided digital LED display 'BT 'Street Hub' unit measuring 2.98m x 1.23m. [Linked with 25/09007/FULL]
Awaiting decision Advertising 15 docs -
Noel Street London
88% historically approved · decision due ~5 Feb
Installation of 'BT Street Hub 3' unit. [Linked with 25/09008/ADV]
Awaiting decision Full applications 21 docsSeveral homes
Other full applications
In Westminster
-
26/07528/FULL Awaiting decision
69 Eaton Place London SW1X 8DF
Installation of new cast iron water pipe on rear courtyard elevation. (Linked with 26/07529/LBC)
-
26/05200/FULL Decided
1 The Court House 165 Seymour Place London W1H 4PU
Installation of waterproofing system to the existing lead flat roofs
-
26/07521/FULL Awaiting decision
Flat 18 Harlequin Court 20 Tavistock Street London WC2E 7NZ
Installation of one external condenser unit
-
26/07508/FULL Awaiting decision
Buckingham Palace The Mall London SW1A 1AA
Replacement of existing security lighting to the Buckingham Palace Forecourt with 80 compact LED spotlights installed within the lantern clusters across 10 principal piers, with associated concealed cabling and reversible fixings. (Linked with 26/07509/LBC)
-
26/07472/FULL Awaiting decision
Flat 3 82 New Cavendish Street London W1G 9TA
Replacement windows to second floor level with vacuum, double glazing windows. (Linked with 26/07473/LBC)