Planning application
25/05122/FULL
Flat 7 36 Queensway London W2 3RX
Proposal
Installation of window to roof slope; Installation of door and railings around the rear outrigger to create terrace at top floor level.
As published by the council, reference 25/05122/FULL
Timeline
Dates from the published record
-
23 Jul 2025
Received by Westminster
-
17 Sep 2025
Validated
Checked as complete and ready for consideration.
-
12 Nov 2025
Decision issued: Application Refused
-
21 Jul 2026
Added to PlanIndex
What refusal means
The process from here
The council refused this application for the reasons set out on the decision notice, which the council portal holds in full. Only the applicant can appeal a refusal; the time limit runs from the decision date and is shorter for householder schemes.
Refusal does not prevent a fresh attempt. Applicants often address the reasons for refusal and resubmit, so a refused scheme is not necessarily the end of proposals for the site.
About full applications applications
How this application type works
A full application seeks permission for a complete, detailed proposal in one go: siting, design, access and landscaping are all fixed at this stage. It is the standard route for new buildings, conversions and changes of use. The statutory target is eight weeks for smaller schemes and thirteen weeks for major development, though complex cases often take longer by agreement.
Nearby applications
Within 500 metres
-
26/04097/FULL Awaiting decision
Development Site At Olympia Mews And 28 To 34 Queensway London
Variation of condition 4, 16, 23, 31, 39, 40, 41, 42, 43 of planning permission dated 23rd July 2024 (RN:23/07119/FULL) for the Variation of Condition 1 (approved plans) of planning permission dated 11 May 2022 (RN:18-09727-FULL) as amended by two non-material amendments (23/04588/NMA & 23/06258/NMA) for Demolition of existing buildings at Nos 28-34 Queensway and Olympia Mews and redevelopment of site by erection of a six storey, plus basement level, building comprising Class E retail floor space and residential flats (Class C3) and erection of a replacement two storey building for use as Class E office floorspace, together with associated landscaping. Namely, Introduction of greater flexibility of use of the Olympia Mews building, variation of condition 16 to become a compliance condition in relation to noise assessment, variation of condition 23 (parts B and C) to become a compliance condition in relation to conservation method statement, variation of conditions 31, 41, 42, 43, with submission of relevant information to amend this to become a compliance condition, in relation to all planting and soft landscaping across the scheme, cariation of condition 39 and 40, with submission of relevant information to amend this to become a compliance condition, in relation to tree protection and arboricultural monitoring, minor design changes to three apartments in the scheme and minor design changes to the communal garden area, and landscaping strategy.
-
26/04682/EEN Awaiting decision
Our Lady Queen Of Heaven Church 46 Queensway London W2 3RS
Upgrade and install additional external lighting to the front façade to enhance the front elevation.
-
25/07030/NMA Awaiting decision
Development Site At Olympia Mews And 28 To 34 Queensway London
Amendment to planning permission dated 23rd July 2024 (RN 23/07119/FULL) for the Variation of Condition 1 (approved plans) of planning permission dated 11 May 2022 (RN:18-09727-FULL) as amended by two non-material amendments (23/04588/NMA & 23/06258/NMA) for Demolition of existing buildings at Nos 28-34 Queensway and Olympia Mews and redevelopment of site by erection of a six storey, plus basement level, building comprising Class E retail floor space and residential flats (Class C3) and erection of a replacement two storey building for use as Class E office floorspace, together with associated landscaping; NAMELY, to amend the approved ground floor plan to allow for changes to the substation access point so this can keep in line with UKPN requirements the replacement of the currently approved two sets of double doors with a single larger set of double doors for the substation.
-
26/02769/LBC Awaiting decision
Basement 15 Inverness Terrace London W2 3JL
Internal works associated with the creation of lower ground flats A & B (retrospective works completed 2011)
-
26/04680/EEN Awaiting decision
Our Lady Queen Of Heaven Church 46 Queensway London W2 3RS
Refurbishment of the basement hall including remedial works to damp plaster, reconfiguration of toilet facilities, refurbishment of kitchen and decorations. Investigations into basement floor joists.
-
26/03511/FULL Awaiting decision
Our Lady Queen Of Heaven Church 46 Queensway London W2 3RS
Installation of additional external lighting to the front facade; and other associated works. Linked with 26/03512/LBC
Other full applications applications
In Westminster
-
26/04824/ADFULL Granted
New Zealand House 80 Haymarket London SW1Y 4TE
Detailed design and specification of new blinds to NZH based on mock-up trials on-site. pursuant to condition 32 (i) of planning permission dated 8th April 2024 (23/00571/FULL).
-
26/04829/ADFULL Granted
New Zealand House 80 Haymarket London SW1Y 4TE
Details of external and internal signage strategy pursuant to Condition 33(E) of planning permission dated 8th April 2024 (RN: 23/00571/FULL)
-
26/04841/ADFULL Granted
29 Henstridge Place London NW8 6QD
Details of the facing materials you will use, including glazing, and elevations and roof plans annotated to show where the materials are to be located pursuant to condition 5 of planning permission dated 18th November 2025 (RN:25/06159).
-
26/04989/FULL Awaiting decision
1 Kildare Terrace London W2 5JT
Erection of a mansard roof extending over the main house and side wing, replacement lower ground rear extension with roof terrace above, lowering of lower ground floor slab, installation of an air source heat pump in rear garden, new front boundary treatment, and new second floor window on the north elevation.
-
26/04986/FULL Awaiting decision
Inver Court Inverness Terrace London W2 6JB
Replacement of combustible materials in the render facades; timber decking and plastic soffits/ fascias to terraces with non-combustible materials on the 5th and 6th floors.