Skip to content
PlanIndex Get alerts
Menu

Planning application

249 - 251 Regent Street London W1B 2EP

Granted Westminster 25/05037/LBC Listed Building Consent Application

Permission granted. Work must normally begin within three years of the decision or the permission lapses.

Proposal

Replacement of 3 solid panels for new acoustic louvres on the Swallow Place elevation.

As published by the council, reference 25/05037/LBC

Application record

Reference
25/05037/LBC
Type
Listed Building Consent Application
Status
Decided
Decision
Granted As published: Application Permitted
Received
21 Jul 2025
Validated
4 Aug 2025
Decided
23 Sep 2025
Ward
West End
Decision by
Delegated Decision
Postcode
W1B 2EP

Site history

Applications at this address on the Westminster register

This site has had 2 applications since 2025: 2 approved, 0 refused.

  • 25/05036/FULL Granted

    249 - 251 Regent Street London W1B 2EP

    Replacement of 3 solid panels for new acoustic louvres on the Swallow Place elevation.

    Decided 23 Sep 2025 Full applications

Timeline

Dates from the published record

  1. 21 Jul 2025

    Received by Westminster

  2. 4 Aug 2025

    Validated

    Checked as complete and ready for consideration.

  3. 23 Sep 2025

    Decision issued: Application Permitted

  4. 21 Jul 2026

    Added to PlanIndex

Who's behind it

Company information only, from the register and Companies House

Planning & Development Associates Ltd Agent, a planning consultancy registered in Harrow On The Hill

Active · incorporated 2011 · Harrow On The Hill

74 applications on PlanIndex · across 28 councils · 71% granted

Trade members see everything this firm has filed, how it was decided, and get an email the day it files again.

See their track record

Documents

Plans, drawings, consultee responses and the officer's report

24 documents on file for this application

A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.

Watch members (£5 a month) open the document list from here.

Open the documents

What this grant of permission means

Westminster granted permission on 23 September 2025, subject to any conditions on the decision notice. Work must normally begin within three years or the permission lapses. More in our guide to what happens after a planning decision.

About heritage and listed building applications

Listed building consent is needed for works that affect the special interest of a listed building, and carrying out such works without it is a criminal offence. More in our guide to planning application types.

Nearby applications

Within 0.3 miles

  • 249 - 251 Regent Street London W1B 2EP

    25/05036/FULL Submitted 21 Jul 2025 50 yards away

    Replacement of 3 solid panels for new acoustic louvres on the Swallow Place elevation.

    Granted Full applications 27 docs
  • 1 Princes Street London W1B 2LA

    26/04424/FULL Submitted 3 Jul 2026 50 yards away

    88% historically approved · decision due ~28 Aug

    Installation of new louvre

    Awaiting decision Full applications 4 docs
  • 1 Princes Street London W1B 2LA

    26/03703/ADV Submitted 5 Jun 2026 50 yards away

    82% historically approved · decision due ~27 Aug

    Display of non-illuminated fascia sign measuring 2.94m x 0.6m; two externally illuminated projecting signs measuring 0.6m x 0.6m; and two non-illuminated awnings measuring 2.8m x 2.82m.

    Awaiting decision Advertising 4 docs
  • Basement And Ground Floor 3 Princes Street London W1B 2LD

    26/03568/ADV Submitted 1 Jun 2026 50 yards away

    82% historically approved · decision due ~27 Jul

    Display of non-illuminated fascia sign measuring 0.18m x 1.15m, non-illuminated hanging sign measuring 0.73m x 0.70m, lettering on green fabric awning measuring 0.11m x 4.00m, and vinyl lettering applied to clear glazing.

    Awaiting decision Advertising Windows or glazing 5 docs
  • Basement And Ground Floor 3 Princes Street London W1B 2LD

    26/03407/FULL Submitted 22 May 2026 50 yards away

    88% historically approved · decision due ~27 Jul

    Alterations to the front of the building including removal of existing metal railings to the lightwell area, levelling of the raised platform and resurfacing with paving slabs to match the existing footpath. (Linked with 26/03568/ADV)

    Awaiting decision Full applications 8 docs
  • Basement And Ground Floor 4 Princes Street London W1B 2LE

    26/02463/ADV Submitted 15 Apr 2026 50 yards away

    82% historically approved · decision due ~10 Jun

    Display of one externally illuminated fascia sign measuring 0.14m x 2.11m.

    Awaiting decision Advertising 8 docs

In Westminster

  • 26/07529/LBC Awaiting decision

    69 Eaton Place London SW1X 8DF

    Installation of new cast iron water supply pipe on rear courtyard elevation. (Linked with 26/07528/FULL)

    Received 5 Nov, published by the council 6 Nov 2026 Heritage and listed buildings
  • 26/07509/LBC Awaiting decision

    Buckingham Palace The Mall London SW1A 1AA

    Replacement of existing security lighting to the Buckingham Palace Forecourt with 80 compact LED spotlights installed within the lantern clusters across 10 principal piers, with associated concealed cabling and reversible fixings. (Linked with 26/07508/FULL)

    Received 4 Nov, published by the council 5 Nov 2026 Heritage and listed buildings
  • 26/07473/LBC Awaiting decision

    Flat 3 82 New Cavendish Street London W1G 9TA

    Replacement windows to second floor level with vacuum, double glazing windows. (Linked with 26/07472/FULL)

    Received 3 Nov, published by the council 6 Nov 2026 Heritage and listed buildings
  • 26/07471/LBC Awaiting decision

    12 Queen Anne's Gate London SW1H 9AA

    Excavation of single-storey basement, internal reconfiguration and installation of modern services. (Linked with 26/07470/FULL)

    Received 3 Nov, published by the council 5 Nov 2026 Heritage and listed buildings
  • 26/07461/LBC Awaiting decision

    1 Savile Row London W1S 3JR

    Minor internal works comprising redecoration and upgrades to lighting, flooring and bathroom and kitchen facilities, together with external works including new lighting and signage.

    Received 3 Nov, published by the council 5 Nov 2026 Heritage and listed buildings