Skip to content
PlanIndex Get alerts
Menu

Planning application

25/04585/FULL

41 Reeves Mews London W1K 2EH

Granted Westminster Full Planning Permission Application

Proposal

Reconfiguration and amalgamation of existing residential accommodation (comprising 2 x 2bed and 1 x 1 bed) to provide 3 homes (1 x 2 bed and 2 x 3 bed); external alterations including rooftop and rear extension and rear terrace, loft conversion, new dormers, enlargement of basement and associated landscaping across the site; and change of use of existing commercial use (Use Class E) to residential (Use Class C3) at lower ground of 41 Reeves Mews [amended description].

As published by the council, reference 25/04585/FULL

Timeline

Dates from the published record

  1. 3 Jul 2025

    Received by Westminster

  2. 29 Oct 2025

    Decision issued: Application Permitted

  3. 29 Jul 2026

    Added to PlanIndex

What a grant of permission means

The process from here

Permission has been granted, usually subject to conditions listed on the decision notice, some of which must be discharged before work starts. The decision notice on the council portal sets out exactly what was approved.

Work must normally begin within three years of the decision or the permission lapses. Neighbours cannot appeal a grant; challenging one means judicial review of how the decision was made, within tight time limits.

About full applications applications

How this application type works

A full application seeks permission for a complete, detailed proposal in one go: siting, design, access and landscaping are all fixed at this stage. It is the standard route for new buildings, conversions and changes of use. The statutory target is eight weeks for smaller schemes and thirteen weeks for major development, though complex cases often take longer by agreement.

More on full applications applications in our guide

Nearby applications

Within 500 metres

  • 25/08615/ADFULL Awaiting decision

    41 Reeves Mews London W1K 2EH

    Details of appropriate arrangements to secure measures to mitigate the potential increased demand for on-street residents car parking in the vicinity of the site pursuant to condition 7 of planning permission dated 29 October 2025 (RN: 25/04585/FULL)

    25 Nov 2025 31m away Full applications
  • 25/07262/FULL Awaiting decision

    41 Upper Grosvenor Street London W1K 2NH

    External alterations including rooftop and rear extension; and reconfiguration and amalgamation of existing residential accommodation (comprising 2 x 2bed and 1 x 1 bed) to provide 3 homes (1 x 2 bed and 2 x 3 bed) (Class C3) at 41 Reeves Mews; external alterations including rooftop and rear extension and terrace, loft conversion and new dormers and enlargement of basement at 41 Reeves Mews; and change of use of existing commercial use (Use Class E) to residential (Use Class C3) at lower ground of 41 Reeves Mews to facilitate shared cycle storage, refuse and plant facilities to serve both 41 Upper Grosvenor Street and 41 Reeves Mews; and associated landscaping across the site. [SITE INCLUDES 41 REEVES MEWS]

    8 Oct 2025 35m away Full applications
  • 26/04722/FULL Awaiting decision

    Flat 11 46 Upper Grosvenor Street London W1K 2NW

    Variation of condition 2 of planning permission dated 06 November 2025 (RN: 25/05340/FULL) for the: Replacement of existing windows. (Flat 11, 46 Upper Grosvenor Street). NAMELY, to allow replacement windows constructed in aluminium rather than the original mild steel of the Crittall casements.

    15 Jul 2026 50m away Full applications
  • 25/05340/FULL Granted

    Flat 11 46 Upper Grosvenor Street London W1K 2NW

    Replacement of existing windows. (Flat 11, 46 Upper Grosvenor Street)

    30 Jul 2025 51m away Full applications
  • 26/01200/LBC Granted

    Flat 1 51 Mount Street London W1K 2SB

    Installation of fibre cable from an existing fibre box located in the basement to the second floor communications room

    25 Feb 2026 53m away Heritage and listed buildings
  • 26/04870/NMA Awaiting decision

    34 Park Street London W1K 2JD

    Amendments to planning permission dated 8 May 2026 (25/07808/FULL) for general refurbishment and M&E upgrade of the office building namely; roof walkable skylight, GF meeting room wall mounted TV, garden bench and planters, fire lobbies, L4 glass partition, reception to hall door swing change, front lightwell electric cupboard change, wall panelling on LGF and L5, LGF modular screen, LGF courtyard window door infill, and LGF cove lighting.

    21 Jul 2026 55m away Amendments

In Westminster

  • 26/04824/ADFULL Granted

    New Zealand House 80 Haymarket London SW1Y 4TE

    Detailed design and specification of new blinds to NZH based on mock-up trials on-site. pursuant to condition 32 (i) of planning permission dated 8th April 2024 (23/00571/FULL).

    20 Jul 2026 Full applications
  • 26/04829/ADFULL Granted

    New Zealand House 80 Haymarket London SW1Y 4TE

    Details of external and internal signage strategy pursuant to Condition 33(E) of planning permission dated 8th April 2024 (RN: 23/00571/FULL)

    20 Jul 2026 Full applications
  • 26/04841/ADFULL Granted

    29 Henstridge Place London NW8 6QD

    Details of the facing materials you will use, including glazing, and elevations and roof plans annotated to show where the materials are to be located pursuant to condition 5 of planning permission dated 18th November 2025 (RN:25/06159).

    20 Jul 2026 Full applications
  • 26/04989/FULL Awaiting decision

    1 Kildare Terrace London W2 5JT

    Erection of a mansard roof extending over the main house and side wing, replacement lower ground rear extension with roof terrace above, lowering of lower ground floor slab, installation of an air source heat pump in rear garden, new front boundary treatment, and new second floor window on the north elevation.

    24 Jul 2026 Full applications
  • 26/04986/FULL Awaiting decision

    Inver Court Inverness Terrace London W2 6JB

    Replacement of combustible materials in the render facades; timber decking and plastic soffits/ fascias to terraces with non-combustible materials on the 5th and 6th floors.

    24 Jul 2026 Full applications