Planning application
38 Park Street London W1K 2JF
Permission granted. Work must normally begin within three years of the decision or the permission lapses.
Proposal
Internal refurbishment of the ground and first floor levels and installation of replacement doors within front and rear lightwells.
As published by the council, reference 22/04003/LBC
Application record
- Reference
- 22/04003/LBC
- Type
- Listed Building Consent Application
- Status
- Decided
- Decision
- Application Permitted
- Received
- 20 Jun 2022
- Validated
- 20 Jun 2022
- Decided
- 15 Aug 2022
- Ward
- West End
- Decision by
- Delegated Decision
- Postcode
- W1K 2JF
Timeline
Dates from the published record
-
20 Jun 2022
Received by Westminster
-
15 Aug 2022
Decision issued: Application Permitted
-
20 Aug 2026
Added to PlanIndex
Who's behind it
Company information only, from the register and Companies House
Agent on file, registered in Stafford
1 application on PlanIndex
Trade members see who it is, their full track record, and every application they have filed.
See who's behind itDocuments
Plans, drawings, consultee responses and the officer's report
13 documents on file for this application
A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.
Trade members open them from here.
Open the documentsWhat a grant of permission means
The process from here
Permission has been granted, usually subject to conditions listed on the decision notice, some of which must be discharged before work starts. The decision notice on the council portal sets out exactly what was approved.
Work must normally begin within three years of the decision or the permission lapses. Neighbours cannot appeal a grant; challenging one means judicial review of how the decision was made, within tight time limits.
About heritage and listed buildings applications
How this application type works
Heritage applications concern listed buildings and conservation areas. Listed building consent is needed for works, inside or out, that affect the special interest of a listed building, and carrying out such works without consent is a criminal offence. The council weighs harm to the heritage asset against any public benefit of the proposal.
More on heritage and listed buildings applications in our guide
Nearby applications
Within 500 metres
-
34 Park Street London W1K 2JD
92% historically approved · decision due ~15 Sep
Amendments to planning permission dated 8 May 2026 (25/07808/FULL) for general refurbishment and M&E upgrade of the office building namely; roof walkable skylight, GF meeting room wall mounted TV, garden bench and planters, fire lobbies, L4 glass partition, reception to hall door swing change, front lightwell electric cupboard change, wall panelling on LGF and L5, LGF modular screen, LGF courtyard window door infill, and LGF cove lighting.
Awaiting decision Amendments Extension Windows or glazing -
34 Park Street London W1K 2JD
89% historically approved · decision due ~30 Sep
Detailed drawings of Intercom and CCTV pursuant to discharge of condition 4 (a) of planning application dated 7th May 2026 (RN: 25/07808/FULL). Linked to 26/05261/ADLBC
Awaiting decision -
34 Park Street London W1K 2JD
89% historically approved · decision due ~25 Sep
Details of conservation based paint strip methodology for stone staircase, new double doors at second floor, all other new doors and new lighting pursuant to condition 5 of listed building consent dated 18 May 2026 (RN: 25/07809/LBC)
Awaiting decision -
34 Park Street London W1K 2JD
89% historically approved · decision due ~30 Sep
Detailed drawings of Intercom and CCTV pursuant to discharge of condition 4 (a) of listed building consent dated 8th May 2026 (RN: 25/07809/LBC). Linked to 26/05221/ADFULL
Awaiting decision -
34 Park Street London W1K 2JD
87% historically approved · decision due ~23 Dec
General refurbishment and M&E upgrade of the office building. (Linked to 25/07809/LBC)
Awaiting decision Full applications 8 docs -
34 Park Street London W1K 2JD
90% historically approved · decision due ~23 Dec
General refurbishment and M&E upgrade of the office building. (Linked to 25/07808/FULL)
Awaiting decision Heritage and listed buildings 8 docs
Other heritage and listed buildings applications
In Westminster
-
26/06025/LBC Awaiting decision
House Of Commons Palace Of Westminster Parliament Square London SW1A 0AA
Installation of new and replacement electronic equipment within Speaker. (Linked with 26/06024/FULL)
-
26/05971/LBC Awaiting decision
House Of Commons Palace Of Westminster Parliament Square London SW1A 0AA
Automation of door at principal floor level.
-
26/05962/LBC Awaiting decision
Royal Albert Hall Kensington Gore London SW7 2AP
Variation of condition 2 of listed building consent dated 26 March 2024 (RN: 24/00820/LBC) for the: Erect temporary access scaffolding platform at high level in the auditorium to inspect the condition of the plaster ceilings and main cornices. NAMELY, to allow the gantry to remain in place until December 2028.
-
26/05970/LBC Awaiting decision
Norman Shaw Building South Victoria Embankment London SW1A 2HZ
Replacement and installation of 16 electronic access control systems to Norman Shaw South
-
26/05943/LBC Awaiting decision
1 Barton Street London SW1P 3NG
Use of the building as F1(a) Education, along with associated internal and external alterations. (Linked with 26/05942/FULL)