Planning application
24/03999/COFUL
Lynton House Hallfield Estate London W2 6EW
Proposal
Removal of security gates and replacement of infill panels to under croft. (Linked with 24/04000/LBC)
As published by the council, reference 24/03999/COFUL
Timeline
Dates from the published record
-
14 Jun 2024
Received by Westminster
-
29 Jul 2026
Added to PlanIndex
-
Decision
Awaiting decision
The statutory target is eight weeks for most applications and thirteen for major development. Extensions of time are common.
What happens while it is decided
The process from here
This application is with Westminster for determination. The council publicises it, consults neighbours and technical bodies where required, and weighs the responses against local and national planning policy.
The statutory target is eight weeks for most applications and thirteen for major development, though extensions of time are common. Comments carry most weight while the case is undecided, so check the council portal for the deadline if you want to respond.
About full applications applications
How this application type works
A full application seeks permission for a complete, detailed proposal in one go: siting, design, access and landscaping are all fixed at this stage. It is the standard route for new buildings, conversions and changes of use. The statutory target is eight weeks for smaller schemes and thirteen weeks for major development, though complex cases often take longer by agreement.
Nearby applications
Within 500 metres
-
24/04000/COLBC Awaiting decision
Lynton House Hallfield Estate London W2 6EW
Removal of security gates and replacement of infill panels to under croft. (Linked with 24/03999/FULL)
-
22/06904/LBC Awaiting decision
Lynton House Hallfield Estate London W2 6EW
Replacement of plant room door, replacement of windows and doors and external decorations & other repairs including brickwork, concrete, asphalt repairs, doff cleaning (linked to 22/06903/FULL)
-
08/00953/FULL Granted
Lynton House Hallfield Estate London W2 6EW
Installation of satellite dish.
-
25/08624/FULL Granted
Exeter House Hallfield Estate London W2 6EL
Removal of existing roof coverings and handrails and to replace with new bitumen (bauder) system, pv panels and free standing handrail system. New undercroft security gates and infill panels. [Linked to 25/08625/LBC]
-
25/08625/LBC Granted
Exeter House Hallfield Estate London W2 6EL
Removal of existing roof coverings and handrails and to replace with new bauder system, pv panels and free standing handrail system. New undercroft security gates and infill panels. [Linked to 25/08624/FULL]
-
25/05284/TCA Granted
Bishops Court 72 - 82 Bishop's Bridge Road W2 6BE
5 x Hornbeam (T1 to T5): Crown lift to give 5m clearance above the carriageway, by pruning lowest branches to the kerb.
Other full applications applications
In Westminster
-
26/04824/ADFULL Granted
New Zealand House 80 Haymarket London SW1Y 4TE
Detailed design and specification of new blinds to NZH based on mock-up trials on-site. pursuant to condition 32 (i) of planning permission dated 8th April 2024 (23/00571/FULL).
-
26/04829/ADFULL Granted
New Zealand House 80 Haymarket London SW1Y 4TE
Details of external and internal signage strategy pursuant to Condition 33(E) of planning permission dated 8th April 2024 (RN: 23/00571/FULL)
-
26/04841/ADFULL Granted
29 Henstridge Place London NW8 6QD
Details of the facing materials you will use, including glazing, and elevations and roof plans annotated to show where the materials are to be located pursuant to condition 5 of planning permission dated 18th November 2025 (RN:25/06159).
-
26/04989/FULL Awaiting decision
1 Kildare Terrace London W2 5JT
Erection of a mansard roof extending over the main house and side wing, replacement lower ground rear extension with roof terrace above, lowering of lower ground floor slab, installation of an air source heat pump in rear garden, new front boundary treatment, and new second floor window on the north elevation.
-
26/04986/FULL Awaiting decision
Inver Court Inverness Terrace London W2 6JB
Replacement of combustible materials in the render facades; timber decking and plastic soffits/ fascias to terraces with non-combustible materials on the 5th and 6th floors.