Planning application
26 Jay Mews London SW7 2ER
Permission granted. Work must normally begin within three years of the decision or the permission lapses.
Proposal
Creation of new entrance and alterations to Bremner Road elevation and replacement mews boundary gate in connection with use of the building as a church.
As published by the council, reference 23/04277/FULL
Application record
- Reference
- 23/04277/FULL
- Type
- Full Planning Permission Application
- Status
- Decided
- Decision
- Granted As published: Application Permitted
- Received
- 26 Jun 2023
- Validated
- 7 Jul 2023
- Decided
- 28 Sep 2023
- Ward
- Knightsbridge & Belgravia
- Decision by
- Delegated Decision
- Postcode
- SW7 2ER
Site history
Applications at this address on the Westminster register
This site has had 2 applications since 2023: 2 approved, 0 refused.
-
23/04278/LBC Granted
26 Jay Mews London SW7 2ER
Remodelling of the interior of the existing building, creation of new entrance and alterations to the Bremner Road elevation and replacement mews boundary gate in connection with use of the building as a church.
Timeline
Dates from the published record
-
26 Jun 2023
Received by Westminster
-
7 Jul 2023
Validated
Checked as complete and ready for consideration.
-
28 Sep 2023
Decision issued: Application Permitted
-
14 Sep 2026
Added to PlanIndex
Who's behind it
Company information only, from the register and Companies House
Archetypes Design Agent, a design practice registered in London
Active · incorporated 2021 · London
11 applications on PlanIndex · across 4 councils
Trade members see everything this firm has filed, how it was decided, and get an email the day it files again.
See their track recordDocuments
Plans, drawings, consultee responses and the officer's report
33 documents on file for this application
A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.
Watch members (£5 a month) open the document list from here.
Open the documentsWhat this grant of permission means
Westminster granted permission on 28 September 2023, subject to any conditions on the decision notice. Work must normally begin within three years or the permission lapses. More in our guide to what happens after a planning decision.
About full applications
A full application seeks permission for a complete, detailed proposal in one go, with siting, design, access and landscaping all fixed at this stage. More in our guide to planning application types.
Nearby applications
Within 0.3 miles
-
26 Jay Mews London SW7 2ER
Remodelling of the interior of the existing building, creation of new entrance and alterations to the Bremner Road elevation and replacement mews boundary gate in connection with use of the building as a church.
Granted Heritage and listed buildings 30 docs -
16 Jay Mews London SW7 2EP
Installation of one air conditioning unit at main roof level behind parapet.
Granted Full applications 15 docs -
16 Jay Mews London SW7 2EP
Details of rear windows, doors and rooflights; (a) revised dimensions to rear first floor snug window; (b) revised detailed design for infill panels and doors below the retained toplights/transoms to front ground floor elevation; and (c) revised front and rear elevations showing these changes pursuant to Conditions 5 and 6 of planning permission dated 20 February 2025 (24/08969/FULL)
Granted Full applications Extension Loft or dormer +1 2 docs -
16 Jay Mews London SW7 2EP
88% historically approved · decision due ~11 Nov
Installation of one air conditioning unit at main roof level behind parapet.
Decided Full applications -
Flat 7 195 Queen's Gate London SW7 5EU
88% historically approved · decision due ~3 Dec
Creation of an additional sixth-floor level, extension of the rear roof structure, installation of an air source heat pump and formation of a roof terrace at fifth-floor level on the rear addition.
Awaiting decision Full applications Extension -
197 Queen's Gate London SW7 5EU
89% historically approved · decision due ~17 Sep
Internal layout alterations to rear first floor (Stevens Building).
Decided
Other full applications
In Westminster
-
26/07528/FULL Awaiting decision
69 Eaton Place London SW1X 8DF
Installation of new water supply works at the rear courtyard. (Linked with 26/07529/LBC)
-
26/05200/FULL Decided
1 The Court House 165 Seymour Place London W1H 4PU
Installation of waterproofing system to the existing lead flat roofs
-
26/07521/FULL Awaiting decision
Flat 18 Harlequin Court 20 Tavistock Street London WC2E 7NZ
Installation of one External Condenser Unit associated with Three Internal AC Units.
-
26/07508/FULL Awaiting decision
Buckingham Palace The Mall London SW1A 1AA
Replacement of existing security lighting to the Buckingham Palace Forecourt with 80 compact LED spotlights installed within the lantern clusters across 10 principal piers, with associated concealed cabling and reversible fixings. (Linked with 26/07509/LBC)
-
26/07472/FULL Awaiting decision
Flat 3 82 New Cavendish Street London W1G 9TA
Replacement windows to second floor level with vacuum, double glazing windows. (Linked with 26/07473/LBC)