Planning application
26/00237/ADFULL
16 Jay Mews London SW7 2EP
Proposal
Details of rear windows, doors and rooflights; (a) revised dimensions to rear first floor snug window; (b) revised detailed design for infill panels and doors below the retained toplights/transoms to front ground floor elevation; and (c) revised front and rear elevations showing these changes pursuant to Conditions 5 and 6 of planning permission dated 20 February 2025 (24/08969/FULL)
As published by the council, reference 26/00237/ADFULL
Timeline
Dates from the published record
-
15 Jan 2026
Received by Westminster
-
26 Jan 2026
Decision issued: Application Permitted
-
20 Jul 2026
Added to PlanIndex
What a grant of permission means
The process from here
Permission has been granted, usually subject to conditions listed on the decision notice, some of which must be discharged before work starts. The decision notice on the council portal sets out exactly what was approved.
Work must normally begin within three years of the decision or the permission lapses. Neighbours cannot appeal a grant; challenging one means judicial review of how the decision was made, within tight time limits.
About full applications applications
How this application type works
A full application seeks permission for a complete, detailed proposal in one go: siting, design, access and landscaping are all fixed at this stage. It is the standard route for new buildings, conversions and changes of use. The statutory target is eight weeks for smaller schemes and thirteen weeks for major development, though complex cases often take longer by agreement.
Nearby applications
Within 500 metres
-
26/04978/CLLB Awaiting decision
197 Queen's Gate London SW7 5EU
Internal layout alterations to rear first floor (Stevens Building).
-
26/03653/ADFULL Awaiting decision
41 - 43 Jay Mews London SW7 2ES
Details of new windows and doors / windows to first floor front elevation to be vertically sliding painted timber sash windows pursuant to conditions 3 and 10 of planning permission dated 30 October 2025 (RN: 25/05247/FULL)
-
26/02852/ADFULL Awaiting decision
41 - 43 Jay Mews London SW7 2ES
Details of New windows and doors detailed drawings showing the following revision(s) to the proposals: Windows to first floor front elevation to be vertically sliding painted timber sash windows, to a detailed design to closely replicate the existing pursuant to discharge of conditions 3 and 10 of planning permission dated 31st October 2025 (RN: 25/05247/FULL).
-
25/05247/FULL Awaiting decision
41 - 43 Jay Mews London SW7 2ES
Refurbishment and extensions to rear; installation of air conditioning unit to east elevation, roof extension and roof lights; access to waste and cycle storage; replacement doors to the front elevation and the creation of a new window on the northern elevation; and other associated works.
-
26/00674/CLLB Granted
Royal College Of Art Kensington Gore London SW7 2EU
Series of investigative works to the Henry Moore Gallery, and the demolition of a wall in the Darwin building.
-
25/07839/TCA Awaiting decision
Royal College Of Art Kensington Gore London SW7 2EU
T1 Ginkgo - To crown reduce back to previous points removing approximately 2 meters from the branch tips.
Other full applications applications
In Westminster
-
26/04824/ADFULL Granted
New Zealand House 80 Haymarket London SW1Y 4TE
Detailed design and specification of new blinds to NZH based on mock-up trials on-site. pursuant to condition 32 (i) of planning permission dated 8th April 2024 (23/00571/FULL).
-
26/04829/ADFULL Granted
New Zealand House 80 Haymarket London SW1Y 4TE
Details of external and internal signage strategy pursuant to Condition 33(E) of planning permission dated 8th April 2024 (RN: 23/00571/FULL)
-
26/04841/ADFULL Granted
29 Henstridge Place London NW8 6QD
Details of the facing materials you will use, including glazing, and elevations and roof plans annotated to show where the materials are to be located pursuant to condition 5 of planning permission dated 18th November 2025 (RN:25/06159).
-
26/04989/FULL Awaiting decision
1 Kildare Terrace London W2 5JT
Erection of a mansard roof extending over the main house and side wing, replacement lower ground rear extension with roof terrace above, lowering of lower ground floor slab, installation of an air source heat pump in rear garden, new front boundary treatment, and new second floor window on the north elevation.
-
26/04986/FULL Awaiting decision
Inver Court Inverness Terrace London W2 6JB
Replacement of combustible materials in the render facades; timber decking and plastic soffits/ fascias to terraces with non-combustible materials on the 5th and 6th floors.