Planning application
Taxi House 11 Woodfield Road London W9 2BA
Permission granted. Work must normally begin within three years of the decision or the permission lapses.
Proposal
Details of Construction Logistic Plan pursuant to condition 38b of planning permission 29th June 2022 (RN: 21/02892/FULL).
As published by the council, reference 22/04686/ADFULL
Application record
- Reference
- 22/04686/ADFULL
- Type
- Approval of Details (Full PP)
- Status
- Decided
- Decision
- Application Permitted
- Received
- 13 Jul 2022
- Validated
- 13 Jul 2022
- Decided
- 4 Aug 2022
- Ward
- Westbourne
- Decision by
- Complex Delegated Decision
- Postcode
- W9 2BA
Timeline
Dates from the published record
-
13 Jul 2022
Received by Westminster
-
4 Aug 2022
Decision issued: Application Permitted
-
4 Aug 2026
Added to PlanIndex
Who's behind it
Company information only, from the register and Companies House
Agent on file, registered in London
651 applications on PlanIndex · across 99 councils · 93% granted
Trade members see who it is, their full track record, and every application they have filed.
See who's behind itDocuments
Plans, drawings, consultee responses and the officer's report
7 documents on file for this application
A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.
Trade members open them from here.
Open the documentsWhat a grant of permission means
The process from here
Permission has been granted, usually subject to conditions listed on the decision notice, some of which must be discharged before work starts. The decision notice on the council portal sets out exactly what was approved.
Work must normally begin within three years of the decision or the permission lapses. Neighbours cannot appeal a grant; challenging one means judicial review of how the decision was made, within tight time limits.
About full applications applications
How this application type works
A full application seeks permission for a complete, detailed proposal in one go: siting, design, access and landscaping are all fixed at this stage. It is the standard route for new buildings, conversions and changes of use. The statutory target is eight weeks for smaller schemes and thirteen weeks for major development, though complex cases often take longer by agreement.
Nearby applications
Within 500 metres
-
32 - 34 Woodfield Road London W9 2BE
87% historically approved · decision due ~20 Oct
Installation of air-source heat pump and condenser units within an acoustic enclosure and associated works at roof level.
Awaiting decision Full applications -
32 - 34 Woodfield Road London W9 2BE
Variation of condition 1 of planning permission dated 8th September 2023 (RN:23/01171/FULL) for the Alterations and extensions, including the infilling of the front yard with a three storey extension with ground floor servicing bay, single storey extension over existing building, and lift and stair core to provide access to new roof terrace at third floor level; installation of PV panels on roof; installation of green roof; installation of mechanical plant equipment at rear first floor level; all in association with the extension to the existing community use and provision of a new co-working office space at second floor level (Use Class E). Namely, changes to staircore and lift overrun, change to cladding, alterations to the roof edge profile, changes to the cladding to the stair and lift core access, removal of canopy, enlarged sign, alterations to the windows and entrance door and amendments to loading bay door.
Granted Full applications Extension Roofing +1 35 docsSmall domestic -
32 - 34 Woodfield Road London W9 2BE
Details of facing materials and glazing and obscure glazing pursuant to Conditions 8 and 10 of planning permission dated 4 November 2025 (25/06395/FULL)
Granted Full applications Windows or glazing 9 docs -
Taxi House 11 Woodfield Road London W9 2BA
Amendments to planning permission dated 29th June 2022 (RN: 21/02892/FULL) for Variation of Condition 1 (approved plans and documents) of planning permission dated 3 July 2020 (RN: 19/04487/FULL) for: Demolition of existing buildings and structures and construction of a new mixed-use development comprising hotel and associated facilities (Class C1), flexible workspace (Class B1a / B1c), retail and food and beverage (Class A1 / A3), events space (Sui Generis) and a replacement street cleaning depot (Sui Generis) with associated new public realm and highways improvements. (site includes Taxi House, Waterside House and Westminster Street Sweepers Depot), namely, internal design changes to the lower amenity levels and the addition of a new floor level positioned between the previous level 03 and level 04, variation of the building heights, increase in hotel rooms from 286 to 332 with the maximum number of storeys increasing from 11 to 12, within the maximum building height of +69.350 AOD. Namely, to amend the description of development and the wording of condition 24.
Granted Amendments Demolition 8 docs -
329 Harrow Road London W9 3RB
Alterations to existing forecourt to include installation of railings, electric vehicle gates a new pedestrian gates and sliding door and installation of Granite Cobble to the forecourt.
Refused Full applications 23 docs -
Taxi House 11 Woodfield Road London W9 2BA
Details of tables and chairs and public realm strategy pursuant to conditions 39 and 40 dated 10 April 2026 (RN: 24/08830/FULL).
Granted Full applications 21 docs
Other full applications applications
In Westminster
-
26/06024/FULL Awaiting decision
House Of Commons Palace Of Westminster Parliament Square London SW1A 0AA
Installation of new and replacement electronic equipment within Speaker. (Linked with 26/06025/LBC)
-
26/06017/FULL Awaiting decision
38 Lauderdale Mansions Lauderdale Road London W9 1NE
Installation of an external AC Unit / Heat Pump at roof level.
-
26/05938/FULL Awaiting decision
24 Vincent Square London SW1P 2NJ
Subdivision of existing residential property to create two self-contained 3-bedroom family homes, along with cycle parking and associated external alterations.
-
26/05935/FULL Awaiting decision
47 Hereford Road London W2 5AH
Installation of one number new external condenser unit to the southerly elevation service alley.
-
26/05959/FULL Awaiting decision
Basement And Ground Floor 50 New Bond Street London W1S 1BJ
Installation of three new condensers on the roof, within an existing designated plant area.