Skip to content
PlanIndex Get alerts
Menu

Planning application

50A Cambridge Street London

Granted Westminster 22/03923/FULL Full Planning Permission Application

Works: Extension Loft or dormer Windows or glazing

Permission granted. Work must normally begin within three years of the decision or the permission lapses.

Proposal

Variation of condtion 1 of planning permision dated 28 October 2021 (RN: 21/06105/FULL) for the: Use of ground and lower ground floor in connection with residential flat above; construction of a mansard with roof terrace; lower ground rear extension; a front lightwell extension and new railings; replacement of the non-original first floor external balustrade and fenestration alterations. NAMELY, to allow replacement of the existing piers and modern metal railing at first floor level with new traditional black painted metal railing; and raising the cill heights of the approved painted timber sash windows at the lower ground floor street facing facades by 150mm.

As published by the council, reference 22/03923/FULL

Application record

Reference
22/03923/FULL
Type
Full Planning Permission Application
Status
Decided
Decision
Application Permitted
Received
16 Jun 2022
Validated
16 Jun 2022
Decided
10 Aug 2022
Ward
Pimlico North
Decision by
Delegated Decision

Timeline

Dates from the published record

  1. 16 Jun 2022

    Received by Westminster

  2. 10 Aug 2022

    Decision issued: Application Permitted

  3. 4 Aug 2026

    Added to PlanIndex

Who's behind it

Company information only, from the register and Companies House

Agent on file, registered in London

1,780 applications on PlanIndex · across 174 councils · 92% granted

Trade members see who it is, their full track record, and every application they have filed.

See who's behind it

Documents

Plans, drawings, consultee responses and the officer's report

12 documents on file for this application

A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.

Trade members open them from here.

Open the documents

What this grant of permission means

Westminster granted permission on 10 August 2022, subject to any conditions on the decision notice. Work must normally begin within three years or the permission lapses. More in our guide to what happens after a planning decision.

About full applications

A full application seeks permission for a complete, detailed proposal in one go, with siting, design, access and landscaping all fixed at this stage. More in our guide to planning application types.

Nearby applications

Within 500 metres

  • 119 Warwick Way London SW1V 4HS

    26/00124/LBC Submitted 12 Jan 2026 27m away

    90% historically approved · decision due ~9 Mar

    Internal alterations, in connection with the use of the ground floor as a self-contained flat (Retrospective)

    Awaiting decision Heritage and listed buildings 13 docs
  • 119 Warwick Way London SW1V 4HS

    25/08337/CLEUD Submitted 14 Nov 2025 33m away

    88% historically approved · decision due ~9 Jan

    Use of the ground-floor as a self-contained flat.

    Awaiting decision Lawful development 12 docs
  • 117 Warwick Way London SW1V 4HT

    05/00400/FULL Submitted 17 Jan 2005 35m away

    Erection of mansard roof extension and rear extension at lower ground to new third floor level, to provide eight additional bedrooms to existing hotel (Class C1), alterations to fenestration and replacement of balustrading at first floor level (Cambridge Street and Warwick Way elevations).

    Granted Full applications Extension Loft or dormer +1 12 docs
  • 117 Warwick Way London SW1V 4HT

    18/04849/ADFULL Submitted 11 Jun 2018 35m away

    Details of dormers, windows and doors, and balustrade to first floor balcony pursuant to condition 10 of planning permission dated 07 July 2016 (RN: 13/02786/FULL).

    Refused Full applications Loft or dormer Windows or glazing 10 docs
  • 64 Cambridge Street London SW1V 4QQ

    25/06210/CLEUD Submitted 2 Sep 2025 48m away

    88% historically approved · decision due ~5 Nov

    Lawful Development Certificate (LDC) for the continued use of the upper floors as a ground floor flat and a first and second floor maisonette.

    Awaiting decision Lawful development 11 docs
  • 40 Cambridge Street London SW1V 4QH

    25/06332/FULL Submitted 5 Sep 2025 52m away

    Use of the building as an Embassy (sui generis).

    Granted Full applications 54 docs

In Westminster

  • 26/06024/FULL Awaiting decision

    House Of Commons Palace Of Westminster Parliament Square London SW1A 0AA

    Installation of new and replacement electronic equipment within Speaker. (Linked with 26/06025/LBC)

    3 Sep 2026 Full applications
  • 26/06017/FULL Awaiting decision

    38 Lauderdale Mansions Lauderdale Road London W9 1NE

    Installation of an external AC Unit / Heat Pump at roof level.

    2 Sep 2026 Full applications
  • 26/05938/FULL Awaiting decision

    24 Vincent Square London SW1P 2NJ

    Subdivision of existing residential property to create two self-contained 3-bedroom family homes, along with cycle parking and associated external alterations.

    1 Sep 2026 Full applications
  • 26/05935/FULL Awaiting decision

    47 Hereford Road London W2 5AH

    Installation of one number new external condenser unit to the southerly elevation service alley.

    1 Sep 2026 Full applications
  • 26/05959/FULL Awaiting decision

    Basement And Ground Floor 50 New Bond Street London W1S 1BJ

    Installation of three new condensers on the roof, within an existing designated plant area.

    1 Sep 2026 Full applications