Skip to content
PlanIndex Get alerts
Menu

Planning application

05/00400/FULL

117 Warwick Way London SW1V 4HT

Granted Westminster Application for full Planning Permission

Proposal

Erection of mansard roof extension and rear extension at lower ground to new third floor level, to provide eight additional bedrooms to existing hotel (Class C1), alterations to fenestration and replacement of balustrading at first floor level (Cambridge Street and Warwick Way elevations).

As published by the council, reference 05/00400/FULL

Timeline

Dates from the published record

  1. 17 Jan 2005

    Received by Westminster

  2. 7 Feb 2005

    Validated

    Checked as complete and ready for consideration.

  3. 16 Jun 2005

    Decision issued: Application Permitted

  4. 29 Jul 2026

    Added to PlanIndex

What a grant of permission means

The process from here

Permission has been granted, usually subject to conditions listed on the decision notice, some of which must be discharged before work starts. The decision notice on the council portal sets out exactly what was approved.

Work must normally begin within three years of the decision or the permission lapses. Neighbours cannot appeal a grant; challenging one means judicial review of how the decision was made, within tight time limits.

About full applications applications

How this application type works

A full application seeks permission for a complete, detailed proposal in one go: siting, design, access and landscaping are all fixed at this stage. It is the standard route for new buildings, conversions and changes of use. The statutory target is eight weeks for smaller schemes and thirteen weeks for major development, though complex cases often take longer by agreement.

More on full applications applications in our guide

Nearby applications

Within 500 metres

  • 18/04849/ADFULL Refused

    117 Warwick Way London SW1V 4HT

    Details of dormers, windows and doors, and balustrade to first floor balcony pursuant to condition 10 of planning permission dated 07 July 2016 (RN: 13/02786/FULL).

    11 Jun 2018 0m away Full applications
  • 26/00124/LBC Awaiting decision

    119 Warwick Way London SW1V 4HS

    Internal alterations, in connection with the use of the ground floor as a self-contained flat (Retrospective)

    12 Jan 2026 40m away Heritage and listed buildings
  • 25/08337/CLEUD Awaiting decision

    119 Warwick Way London SW1V 4HS

    Use of the ground-floor as a self-contained flat.

    14 Nov 2025 42m away Lawful development
  • 25/09021/LBC Granted

    32 Eccleston Square London SW1V 1PB

    The removal of a mid-20th century flagpole, roof access ladder and balustrade fixed to the front façade and proposed reconstruction of the original cupboard typical of Cubitts staircase landings

    12 Dec 2025 53m away Heritage and listed buildings
  • 25/06332/FULL Awaiting decision

    40 Cambridge Street London SW1V 4QH

    Use of the building as an Embassy (sui generis).

    5 Sep 2025 54m away Full applications
  • 25/05228/LBC Granted

    31 Eccleston Square London SW1V 1NZ

    Internal alterations including conversion of three non en-suite rooms into en-suite rooms; conversion of existing kitchen area; conversion of one non en-suite room into en-suite room at lower ground, ground and fourth floor levels.

    28 Jul 2025 59m away Heritage and listed buildings

In Westminster

  • 26/04824/ADFULL Granted

    New Zealand House 80 Haymarket London SW1Y 4TE

    Detailed design and specification of new blinds to NZH based on mock-up trials on-site. pursuant to condition 32 (i) of planning permission dated 8th April 2024 (23/00571/FULL).

    20 Jul 2026 Full applications
  • 26/04829/ADFULL Granted

    New Zealand House 80 Haymarket London SW1Y 4TE

    Details of external and internal signage strategy pursuant to Condition 33(E) of planning permission dated 8th April 2024 (RN: 23/00571/FULL)

    20 Jul 2026 Full applications
  • 26/04841/ADFULL Granted

    29 Henstridge Place London NW8 6QD

    Details of the facing materials you will use, including glazing, and elevations and roof plans annotated to show where the materials are to be located pursuant to condition 5 of planning permission dated 18th November 2025 (RN:25/06159).

    20 Jul 2026 Full applications
  • 26/04989/FULL Awaiting decision

    1 Kildare Terrace London W2 5JT

    Erection of a mansard roof extending over the main house and side wing, replacement lower ground rear extension with roof terrace above, lowering of lower ground floor slab, installation of an air source heat pump in rear garden, new front boundary treatment, and new second floor window on the north elevation.

    24 Jul 2026 Full applications
  • 26/04986/FULL Awaiting decision

    Inver Court Inverness Terrace London W2 6JB

    Replacement of combustible materials in the render facades; timber decking and plastic soffits/ fascias to terraces with non-combustible materials on the 5th and 6th floors.

    24 Jul 2026 Full applications