Skip to content
PlanIndex Get alerts
Menu

Planning application

22/03461/ADFULL

20 Montpelier Mews London SW7 1HB

Granted Westminster Approval of Details (Full PP)

Proposal

Details of Appendix A of the Code of Construction Practice for the earthwork and piling phase of the development pursuant to condition 3 (part b) of planning permission dated 26th September 2019 (RN: 19/00810/FULL).

As published by the council, reference 22/03461/ADFULL

Timeline

Dates from the published record

  1. 25 May 2022

    Received by Westminster

  2. 9 Aug 2022

    Validated

    Checked as complete and ready for consideration.

  3. 18 Aug 2022

    Decision issued: Application Permitted

  4. 29 Jul 2026

    Added to PlanIndex

What a grant of permission means

The process from here

Permission has been granted, usually subject to conditions listed on the decision notice, some of which must be discharged before work starts. The decision notice on the council portal sets out exactly what was approved.

Work must normally begin within three years of the decision or the permission lapses. Neighbours cannot appeal a grant; challenging one means judicial review of how the decision was made, within tight time limits.

About full applications applications

How this application type works

A full application seeks permission for a complete, detailed proposal in one go: siting, design, access and landscaping are all fixed at this stage. It is the standard route for new buildings, conversions and changes of use. The statutory target is eight weeks for smaller schemes and thirteen weeks for major development, though complex cases often take longer by agreement.

More on full applications applications in our guide

Nearby applications

Within 500 metres

  • 06/09472/FULL Granted

    1 Montpelier Mews London SW7 1HB

    Demolition of Nos. 1 and 2 Montpelier Mews. Erection of two new mews buildings comprising lower ground, ground, first and second floors in connection with their use as single family dwelling houses.

    27 Nov 2006 0m away Full applications
  • 13/03550/CAC Decided

    12 Montpelier Mews London SW7 1HB

    Conversion of garage into habitable room and installation of window.

    18 Apr 2013 0m away Heritage and listed buildings
  • 05/06977/CAC Granted

    2 Montpelier Mews London SW7 1HB

    Demolition of No. 2 and partial demolition of 3 Montpelier Mews.

    26 Aug 2005 0m away Heritage and listed buildings
  • 07/00987/CAC Granted

    1 Montpelier Mews London SW7 1HB

    Demolition of Nos. 1 and 2 Montpelier Mews in connection with the construction of two new mews buildings with lower ground, ground, first and second floor.

    30 Jan 2007 0m away Heritage and listed buildings
  • 05/06110/FULL Granted

    2 Montpelier Mews London SW7 1HB

    Demolition of No. 2 Montpelier Mews and partial demolition of No. 3 Montpelier Mews and redevelopment to form two buildings comprising basement, ground, first, and a second floor mansard storey with rear extensions at first and second floor levels, and front basement lightwells in connection with use as two single family dwelling houses.

    29 Jul 2005 0m away Full applications
  • 08/02214/ADFULL Granted

    1 Montpelier Mews London SW7 1HB

    Details of London Yellow Stock pursuant to Condition 7 of planning permission dated 27 April 2007 (RN: 06/09472).

    6 Mar 2008 0m away Full applications

In Westminster

  • 26/04824/ADFULL Granted

    New Zealand House 80 Haymarket London SW1Y 4TE

    Detailed design and specification of new blinds to NZH based on mock-up trials on-site. pursuant to condition 32 (i) of planning permission dated 8th April 2024 (23/00571/FULL).

    20 Jul 2026 Full applications
  • 26/04829/ADFULL Granted

    New Zealand House 80 Haymarket London SW1Y 4TE

    Details of external and internal signage strategy pursuant to Condition 33(E) of planning permission dated 8th April 2024 (RN: 23/00571/FULL)

    20 Jul 2026 Full applications
  • 26/04841/ADFULL Granted

    29 Henstridge Place London NW8 6QD

    Details of the facing materials you will use, including glazing, and elevations and roof plans annotated to show where the materials are to be located pursuant to condition 5 of planning permission dated 18th November 2025 (RN:25/06159).

    20 Jul 2026 Full applications
  • 26/04989/FULL Awaiting decision

    1 Kildare Terrace London W2 5JT

    Erection of a mansard roof extending over the main house and side wing, replacement lower ground rear extension with roof terrace above, lowering of lower ground floor slab, installation of an air source heat pump in rear garden, new front boundary treatment, and new second floor window on the north elevation.

    24 Jul 2026 Full applications
  • 26/04986/FULL Awaiting decision

    Inver Court Inverness Terrace London W2 6JB

    Replacement of combustible materials in the render facades; timber decking and plastic soffits/ fascias to terraces with non-combustible materials on the 5th and 6th floors.

    24 Jul 2026 Full applications