Planning application

1 Montpelier Mews London SW7 1HB

Granted Westminster 06/09472/FULL Application for full Planning Permission

Works: Demolition Domestic

Read from the description, not a valuation. How we read the register

Permission granted. Work must normally begin within three years of the decision or the permission lapses.

Proposal

Demolition of Nos. 1 and 2 Montpelier Mews. Erection of two new mews buildings comprising lower ground, ground, first and second floors in connection with their use as single family dwelling houses.

As published by the council, reference 06/09472/FULL

Application record

Reference
06/09472/FULL
Type
Application for full Planning Permission
Status
Decided
Decision
Granted As published: Application Permitted
Received
27 Nov 2006
Validated
30 Jan 2007
Decided
19 Apr 2007
Ward
Knightsbridge And Belgravia
Decision by
Sub-Committee
Postcode
SW7 1HB

Site history

Applications at this address on the Westminster register

This site has had 3 applications since 2006: 3 approved, 0 refused.

  • 08/02214/ADFULL Granted

    1 Montpelier Mews London SW7 1HB

    Details of London Yellow Stock pursuant to Condition 7 of planning permission dated 27 April 2007 (RN: 06/09472).

    Decided 8 Apr 2008 Full applications
  • 07/00987/CAC Granted

    1 Montpelier Mews London SW7 1HB

    Demolition of Nos. 1 and 2 Montpelier Mews in connection with the construction of two new mews buildings with lower ground, ground, first and second floor.

    Decided 19 Apr 2007 Heritage and listed buildings

Timeline

Dates from the published record

  1. 27 Nov 2006

    Received by Westminster

  2. 30 Jan 2007

    Validated

    Checked as complete and ready for consideration.

  3. 19 Apr 2007

    Decision issued: Application Permitted

  4. 29 Jul 2026

    Added to PlanIndex

Documents

Plans, drawings, consultee responses and the officer's report

20 documents on file for this application

A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.

Watch members (£5 a month) open the document list from here.

Open the documents

What this grant of permission means

Westminster granted permission on 19 April 2007, subject to any conditions on the decision notice. Work must normally begin within three years or the permission lapses. More in our guide to what happens after a planning decision.

About full applications

A full application seeks permission for a complete, detailed proposal in one go, with siting, design, access and landscaping all fixed at this stage. More in our guide to planning application types.

Nearby applications

Within 0.3 miles

  • 12 Montpelier Mews London SW7 1HB

    13/03550/CAC Submitted 18 Apr 2013 50 yards away

    Conversion of garage into habitable room and installation of window.

    Decided Heritage and listed buildings Windows or glazing 9 docs
  • 2 Montpelier Mews London SW7 1HB

    05/06977/CAC Submitted 26 Aug 2005 50 yards away

    Demolition of No. 2 and partial demolition of 3 Montpelier Mews.

    Granted Heritage and listed buildings Demolition 2 docs
  • 1 Montpelier Mews London SW7 1HB

    07/00987/CAC Submitted 30 Jan 2007 50 yards away

    Demolition of Nos. 1 and 2 Montpelier Mews in connection with the construction of two new mews buildings with lower ground, ground, first and second floor.

    Granted Heritage and listed buildings Demolition 2 docs
  • 2 Montpelier Mews London SW7 1HB

    05/06110/FULL Submitted 29 Jul 2005 50 yards away

    Demolition of No. 2 Montpelier Mews and partial demolition of No. 3 Montpelier Mews and redevelopment to form two buildings comprising basement, ground, first, and a second floor mansard storey with rear extensions at first and second floor levels, and front basement lightwells in connection with use as two single family dwelling houses.

    Granted Full applications Extension Loft or dormer +1 15 docs
    Domestic
  • 1 Montpelier Mews London SW7 1HB

    08/02214/ADFULL Submitted 6 Mar 2008 50 yards away

    Details of London Yellow Stock pursuant to Condition 7 of planning permission dated 27 April 2007 (RN: 06/09472).

    Granted Full applications 2 docs
  • 20 Montpelier Mews London SW7 1HB

    22/03461/ADFULL Submitted 25 May 2022 50 yards away

    Details of Appendix A of the Code of Construction Practice for the earthwork and piling phase of the development pursuant to condition 3 (part b) of planning permission dated 26th September 2019 (RN: 19/00810/FULL).

    Granted Full applications 10 docs

In Westminster

  • 26/06295/FULL Awaiting decision

    15 Warwick Way London SW1V 1QT

    Installation of a new shopfront with Medication Dispensing Outlet.

    Received 15 Sep, published by the council 17 Sep 2026 Full applications
  • 26/06297/FULL Awaiting decision

    15 Warwick Way London SW1V 1QT

    Alterations to rear elevation at basement level comprising replacement window and installation of double opening door.

    Received 15 Sep, published by the council 17 Sep 2026 Full applications
  • 26/06294/FULL Awaiting decision

    15 Eaton Mews South London SW1W 9HP

    Installation of railings and sliding lantern light at main roof level in connection with the use of the roof as a terrace.

    Received 15 Sep, published by the council 22 Sep 2026 Full applications
  • 26/06273/FULL Awaiting decision

    9A Grosvenor Square London W1K 5AE

    Installation of new natural Portland Stone step surfaces to the two highway facing front entrance doors. (Linked to 26/05473/LBC)

    Received 14 Sep, published by the council 22 Sep 2026 Full applications
  • 26/06277/FULL Awaiting decision

    Hospital 60 Grove End Road London NW8 9NH

    Variation of conditions 1 and removal of condition 6 of planning permission dated 12th November 2019 (RN 19/07202/FULL) for the Variation of condition 12 of planning permission dated 21 June 2013 (RN: 13/01330/FULL) for the: Demolition of single storey block to north east elevation of main hospital building. Erection of three storey building (plus basement level) with link to existing hospital fronting onto Grove End Road and erection of two storey extension to the main entrance building, both to provide additional hospital accommodation (Class D1). Installation of mechanical plant and associated external alterations. NAMELY, to include amended phase 2 drawings and condition 6 to be removed as the as approved 11 car parking space are no longer proposed and the car lift is no longer shown on the amended plans.

    Received 14 Sep, published by the council 22 Sep 2026 Full applications