Planning application
06/02190/FULL
6A Green Street London W1K 6RW
Proposal
Alterations during the course of construction to a scheme granted planning permission dated 14 June 2005 (RN: 05/02725) namely, part infill of rear basement lightwell to provide additional residential accommodation, new windows and doors to front and rear at basement and ground floor level.
As published by the council, reference 06/02190/FULL
Timeline
Dates from the published record
-
20 Mar 2006
Received by Westminster
-
12 May 2006
Decision issued: Application Permitted
-
29 Jul 2026
Added to PlanIndex
What a grant of permission means
The process from here
Permission has been granted, usually subject to conditions listed on the decision notice, some of which must be discharged before work starts. The decision notice on the council portal sets out exactly what was approved.
Work must normally begin within three years of the decision or the permission lapses. Neighbours cannot appeal a grant; challenging one means judicial review of how the decision was made, within tight time limits.
About full applications applications
How this application type works
A full application seeks permission for a complete, detailed proposal in one go: siting, design, access and landscaping are all fixed at this stage. It is the standard route for new buildings, conversions and changes of use. The statutory target is eight weeks for smaller schemes and thirteen weeks for major development, though complex cases often take longer by agreement.
Nearby applications
Within 500 metres
-
06/02603/FULL Granted
5 Green Street London W1K 6RW
Retention of use of property as 6 self contained flats/maisonettes 2x3 bed and 4x2 bed. Retention of lift over-run.
-
06/02604/CAC Decided
5 Green Street London W1K 6RW
Demolition of internal partitions and internal refurbishment.
-
05/09801/FULL Refused
5 Green Street London W1K 6RW
Retention of use of property as six self-contained flats.
-
04/06177/CAC Decided
4 Green Street London W1K 6RW
Demolition of staircase in basement lightwell at front and replacement with new metal staircase.
-
04/06176/FULL Granted
4 Green Street London W1K 6RW
Demolition of staircase in basement lightwell at front and replacement with new metal staircase.
-
04/04819/FULL Granted
5 Green Street London W1K 6RW
Erection of single storey rear extension in courtyard to provide additional residential floor space.
Other full applications applications
In Westminster
-
26/04824/ADFULL Granted
New Zealand House 80 Haymarket London SW1Y 4TE
Detailed design and specification of new blinds to NZH based on mock-up trials on-site. pursuant to condition 32 (i) of planning permission dated 8th April 2024 (23/00571/FULL).
-
26/04829/ADFULL Granted
New Zealand House 80 Haymarket London SW1Y 4TE
Details of external and internal signage strategy pursuant to Condition 33(E) of planning permission dated 8th April 2024 (RN: 23/00571/FULL)
-
26/04841/ADFULL Granted
29 Henstridge Place London NW8 6QD
Details of the facing materials you will use, including glazing, and elevations and roof plans annotated to show where the materials are to be located pursuant to condition 5 of planning permission dated 18th November 2025 (RN:25/06159).
-
26/04989/FULL Awaiting decision
1 Kildare Terrace London W2 5JT
Erection of a mansard roof extending over the main house and side wing, replacement lower ground rear extension with roof terrace above, lowering of lower ground floor slab, installation of an air source heat pump in rear garden, new front boundary treatment, and new second floor window on the north elevation.
-
26/04986/FULL Awaiting decision
Inver Court Inverness Terrace London W2 6JB
Replacement of combustible materials in the render facades; timber decking and plastic soffits/ fascias to terraces with non-combustible materials on the 5th and 6th floors.