Skip to content
PlanIndex Get alerts
Menu

Planning application

04/04819/FULL

5 Green Street London W1K 6RW

Granted Westminster Application for full Planning Permission

Proposal

Erection of single storey rear extension in courtyard to provide additional residential floor space.

As published by the council, reference 04/04819/FULL

Timeline

Dates from the published record

  1. 23 Jun 2004

    Received by Westminster

  2. 29 Jul 2004

    Validated

    Checked as complete and ready for consideration.

  3. 14 Sep 2004

    Decision issued: Application Permitted

  4. 29 Jul 2026

    Added to PlanIndex

What a grant of permission means

The process from here

Permission has been granted, usually subject to conditions listed on the decision notice, some of which must be discharged before work starts. The decision notice on the council portal sets out exactly what was approved.

Work must normally begin within three years of the decision or the permission lapses. Neighbours cannot appeal a grant; challenging one means judicial review of how the decision was made, within tight time limits.

About full applications applications

How this application type works

A full application seeks permission for a complete, detailed proposal in one go: siting, design, access and landscaping are all fixed at this stage. It is the standard route for new buildings, conversions and changes of use. The statutory target is eight weeks for smaller schemes and thirteen weeks for major development, though complex cases often take longer by agreement.

More on full applications applications in our guide

Nearby applications

Within 500 metres

  • 06/02603/FULL Granted

    5 Green Street London W1K 6RW

    Retention of use of property as 6 self contained flats/maisonettes 2x3 bed and 4x2 bed. Retention of lift over-run.

    4 Apr 2006 0m away Full applications
  • 06/02604/CAC Decided

    5 Green Street London W1K 6RW

    Demolition of internal partitions and internal refurbishment.

    4 Apr 2006 0m away Heritage and listed buildings
  • 06/02190/FULL Granted

    6A Green Street London W1K 6RW

    Alterations during the course of construction to a scheme granted planning permission dated 14 June 2005 (RN: 05/02725) namely, part infill of rear basement lightwell to provide additional residential accommodation, new windows and doors to front and rear at basement and ground floor level.

    20 Mar 2006 0m away Full applications
  • 05/09801/FULL Refused

    5 Green Street London W1K 6RW

    Retention of use of property as six self-contained flats.

    2 Dec 2005 0m away Full applications
  • 04/06177/CAC Decided

    4 Green Street London W1K 6RW

    Demolition of staircase in basement lightwell at front and replacement with new metal staircase.

    5 Aug 2004 0m away Heritage and listed buildings
  • 04/06176/FULL Granted

    4 Green Street London W1K 6RW

    Demolition of staircase in basement lightwell at front and replacement with new metal staircase.

    5 Aug 2004 0m away Full applications

In Westminster

  • 26/04824/ADFULL Granted

    New Zealand House 80 Haymarket London SW1Y 4TE

    Detailed design and specification of new blinds to NZH based on mock-up trials on-site. pursuant to condition 32 (i) of planning permission dated 8th April 2024 (23/00571/FULL).

    20 Jul 2026 Full applications
  • 26/04829/ADFULL Granted

    New Zealand House 80 Haymarket London SW1Y 4TE

    Details of external and internal signage strategy pursuant to Condition 33(E) of planning permission dated 8th April 2024 (RN: 23/00571/FULL)

    20 Jul 2026 Full applications
  • 26/04841/ADFULL Granted

    29 Henstridge Place London NW8 6QD

    Details of the facing materials you will use, including glazing, and elevations and roof plans annotated to show where the materials are to be located pursuant to condition 5 of planning permission dated 18th November 2025 (RN:25/06159).

    20 Jul 2026 Full applications
  • 26/04989/FULL Awaiting decision

    1 Kildare Terrace London W2 5JT

    Erection of a mansard roof extending over the main house and side wing, replacement lower ground rear extension with roof terrace above, lowering of lower ground floor slab, installation of an air source heat pump in rear garden, new front boundary treatment, and new second floor window on the north elevation.

    24 Jul 2026 Full applications
  • 26/04986/FULL Awaiting decision

    Inver Court Inverness Terrace London W2 6JB

    Replacement of combustible materials in the render facades; timber decking and plastic soffits/ fascias to terraces with non-combustible materials on the 5th and 6th floors.

    24 Jul 2026 Full applications