Planning application
West Suffolk Operational Hub Bury Road Fornham St Martin Bury St Edmunds Suffolk IP31 1FE
Permission granted. Work must normally begin within three years of the decision or the permission lapses.
Proposal
Hybrid planning application - a. Full planning application - Car park and hardstanding, including access, landscaping and associated infrastructure and works; change of use of existing parking area to provide storage and parking area; and reconfiguration of existing vehicle parking area; b. Outline planning permission with all matters reserved- Construction of one or more buildings to expand the existing municipal operational hub and associated storage areas, yards, landscaping, infrastructure and works.
As published by the council, reference DC/26/0891/HYB
Application record
- Reference
- DC/26/0891/HYB
- Status
- Decided
- Decision
- Approve application
- Received
- 10 Jun 2026
- Validated
- 10 Jun 2026
- Ward
- The Fornhams And Great Barton
- Parish
- Fornham St. Martin Cum St.Genevieve
- Postcode
- IP31 1FE
Timeline
Dates from the published record
-
10 Jun 2026
Received by West Suffolk
-
24 Jul 2026
Added to PlanIndex
-
31 Jul 2026
Status changed to Pending Decision
Previously Pending Consideration.
-
10 Sep 2026
Status changed to Decided
Previously Pending Decision.
Related applications
Cases linked to this one on the register
- Buildingcontrol: BC/17/1300/NDMFP (Building Work Complete)
Documents
Plans, drawings, consultee responses and the officer's report
135 documents on file for this application
- COMMITTEE REPORT
- COMMITTEE LATE PAPER
- EIA SCREENING OPINION MATRIX
- EIA SCREENING OPINION COVERING LETTER
- SCC HIGHWAYS
- BNG BASELINE PLAN FULL APPLICATION AREA
- BNG BASELINE PLAN OUTLINE APPLICATION AREA
- ECOLOGY OFFICER
- SCC HIGHWAYS
- ENVIRONMENT AGENCY
- SCC MINERALS AND WASTE
- NATIONAL HIGHWAYS
- LEAD LOCAL FLOOD AUTHORITY
- NATURAL ENGLAND
- LANDSCAPE OFFICER
- ENERGY AND SUSTAINABILITY TEAM
- ANGLIAN WATER
- AMENDED TRANSPORT ASSESSMENT 1
- AMENDED TRANSPORT ASSESSMENT 2
- AMENDED TRANSPORT ASSESSMENT 3
- AMENDED TRANSPORT ASSESSMENT 4
- TA PLAN- PHASE 1 AND PHASE 2 AREAS PRO RATA TRIP CALCULATIONS
- AMENDED DRAWING REGISTER
- AMENDED BNG METRIC OUTLINE APPLICATION AREA
- AMENDED BNG METRIC FULL APPLICATION AREA
- AMENDED BIODIVERSITY NET GAIN STRATEGY
- BNG PRE AND POST DEVELOPMENT PLANS
- SCC PUBLIC RIGHTS OF WAY
- ENVIRONMENT TEAM
- SCC ARCHAEOLOGICAL SERVICE
- SCC HIGHWAYS
- CADENT GAS
- SUPERSEDED DRAWING REGISTER
- SUB STATION DETAILS
- AMENDED EXISTING SITE PLAN - 'OUTLINE' AREA AND PART OF 'FULL' AREA
- AMENDED PROPOSED SITE PLAN - PART OF 'FULL' AREA
- AMENDED PROPOSED SITE PLAN - 'OUTLINE' AREA AND PART OF 'FULL' AREA
- AMENDED PROPOSED SITE PLAN - CAR PARK AND YARD AREA
- AMENDED PROPOSED SITE SECTIONS CAR PARK
- AMENDED 'FULL' AND 'OUTLINE' PLANNING APPLICATION AREA
- AMENDED PHASING PLAN- PHASE 1 FULL APP
- AMENDED LAND OWNERSHIP PLAN
- AMENDED DEVELOPABLE AREAS PLAN
- AMENDED EXISTING SITE PLAN - EXISTING WSOH AREA
- AMENDED PROPOSED SITE PLAN - EXISTING WSOH AREA
- PEDESTRIAN AND CYCLE ROUTE- 'FULL' AREA
- PROPOSED SWTICH PANEL ROOM- ELEVATIONS AND FLOOR PLANS
- PEDESTRIAN AND CYCLE ROUTES- 'OUTLINE' APPLICATION
- BUILDING HEIGHTS PARAMETER PLAN
- AMENDED LANDSCAPE MASTERPLAN
- AMENDED LANDSCAPE PLAN 'FULL' AREA
- APPLICANT RESPONSE TO NATIONAL HIGHWAYS QUERY
- DETAILED DRAINAGE DESIGN FOR 'FULL' APPLICATION 1
- DETAILED DRAINAGE DESIGN FOR 'FULL' APPLICATION 2
- AMENDED FLOOD RISK ASSESSMENT AND DRAINAGE STRATEGY 1
- AMENDED FLOOD RISK ASSESSMENT AND DRAINAGE STRATEGY 2
- AMENDED FLOOD RISK ASSESSMENT AND DRAINAGE STRATEGY 3
- AMENDED FLOOD RISK ASSESSMENT AND DRAINAGE STRATEGY 4
- AMENDED DEVELOPABLE AREAS PLAN- EXISTING WSOH
- SCC ARCHAEOLOGICAL SERVICE
- ANGLIAN WATER
- AMENDED LANDSCAPE - LANDSCAPE AND VISUAL IMPACT ASSESSMENT
- CONSTRUCTION SURFACE WATER MANAGEMENT PLAN
- ARCHAEOLOGY- WRITTEN SCHEME OF INVESTIGATION FULL AREA
- SUPERSEDED TRANSPORT ASSESSMENT 1
- SUPERSEDED TRANSPORT ASSESSMENT 2
- SUPERSEDED TRANSPORT ASSESSMENT 3
- SUPERSEDED TRANSPORT ASSESSMENT 4
- SCC PUBLIC RIGHTS OF WAY
- PRIVATE SECTOR HOUSING AND ENVIRONMENTAL HEALTH
- ECOLOGY OFFICER
- LANDSCAPE OFFICER
- NATIONAL HIGHWAYS
- SCC MINERALS AND WASTE
- NATURAL ENGLAND 1
- NATURAL ENGLAND 2
- LEAD LOCAL FLOOD AUTHORITY
- ENERGY AND SUSTAINABILITY TEAM
- ENVIRONMENT AGENCY
- CADENT GAS PLANS
- CADENT GAS BOOKLET
- CADENT GAS
- SSC ARCHAEOLOGICAL SERVICE
- CADENT GAS
- ENVIRONMENT TEAM
- HEALTH AND SAFETY EXECUTIVE
- SUPERSEDED LANDSCAPE - LANDSCAPE AND VISUAL IMPACT ASSESSMENT
- SUPERSEDED DRAWING REGISTER
- ARBORICULTURE - EXISTING AND PROPOSED RETAINED TREES
- ARBORICULTURE - TREE REPORT
- ARCHAEOLOGY - GEOPHYSICAL SURVEY
- ARCHAEOLOGY - DESK BASED ASSESSMENT
- DESIGN AND ACCESS STATEMENT
- ECOLOGY - PRELIMINARY ECOLOGICAL REPORT
- SUPERSEDED BIODIVERSITY NET GAIN STRATEGY
- SUPERSEDED FLOOD RISK ASSESSMENT - PROPOSED CONSTRUCTION DETAILS
- SUPERSEDED FLOOD RISK ASSESSMENT - PROPOSED BASIN CROSS SECTIONS
- SUPERSEDED FLOOD RISK ASSESSMENT - PROPOSED SITE LAYOUT
- SUPERSEDED FLOOD RISK ASSESSMENT - PROPOSED CONSTRUCTIONS DETAILS AND BASIN SECTIONS
- SUPERSEDED FLOOD RISK ASSESSMENT - PROPOSED SITE LAYOUT
- SUPERSEDED FLOOD RISK ASSESSMENT AND DRAINAGE STRATEGY 1
- SUPERSEDED FLOOD RISK ASSESSMENT - BASIN CROSS SECTIONS
- SUPERSEDED FLOOD RISK ASSESSMENT AND DRAINAGE STRATEGY 2
- SUPERSEDED FLOOD RISK ASSESSMENT - DRAINAGE LAYOUT
- SUPERSEDED FLOOD RISK ASSESSMENT - CONSTRUCTION DETAILS AND BASIN CROSS SECTIONS
- SUPERSEDED LANDSCAPE - LANDSCAPE 'FULL' AREA
- SUPERSEDED LANDSCAPE - LANDSCAPE MASTER PLAN
- GROUND INVESTIGATION REPORT - MAPS
- GROUND INVESTIGATION REPORT - TESTING RESULTS
- GROUND INVESTIGATION REPORT/ MINERALS SAFEGUARDING ASSESSMENT
- LIGHTING - HORIZONTAL ILLUMINANACE
- LIGHTING - OUTDOOR LIGHTING REPORT
- PLANNING STATEMENT
- SUPERSEDED PROPOSED SITE PLAN - PART OF 'FULL' AREA
- SUPERSEDED PROPOSED SITE PLAN - 'OUTLINE' AREA AND PART OF 'FULL' AREA
- LOCATION PLAN
- SUPERSEDED EXISTING SITE PLAN - 'OUTLINE' AREA AND PART OF 'FULL' AREA
- SUPERSEDED 'FULL' AND 'OUTLINE' PLANNING APPLICATION AREAS
- SUPERSEDED PROPOSED SITE SECTIONS CAR PARK
- PROPOSED PV CANOPY ELEVATIONS
- SUPERSEDED PROPOSED SITE PLAN - CAR PARK AND YARD AREA
- EXISTING AND PROPOSED SITE SECTIONS CAR PARK
- SUPERSEDED PROPOSED SITE PLAN - EXISTING WSOH AREA
- SUPERSEDED LAND OWNERSHIP PLAN
- SUPERSEDED PHASING PLAN- PHASE 1 FULL APP
- SUPERSEDED EXISTING SITE PLAN - EXISTING WSOH AREA
- SUPERSEDED DEVELOPABLE AREAS PLAN
- SUPERSEDED TRANSPORT ASSESSMENT 1
- SUPERSEDED TRANSPORT ASSESSMENT 2
- TRAVEL PLAN- WSOH TRAVEL PLAN ADDENDUM
- TRAVEL PLAN - FRAMEWORK TRAVEL PLAN
- BNG DEFRA METRIC CONDITION ASSESSMENT FINAL
- SUPERSEDED BNG METRIC FULL APPLICATION AREA
- SUPERSEDED BNG METRIC OUTLINE APPLICATION AREA
- HYBRID APPLICATION FORM
Trade members open them from here.
Open the documentsWhat this grant of permission means
West Suffolk granted permission, subject to any conditions on the decision notice. Work must normally begin within three years or the permission lapses. More in our guide to what happens after a planning decision.
About this record
The published feed does not state which type of application this is; the register entry on West Suffolk's portal will say. Our guide explains the common types.
Nearby applications
Within 500 metres
-
Steve Lumley Planing Ltd Hollow Road Farm Hollow Road Fornham St Martin IP31 1SJ
Application to Discharge Conditions 3 (provision of parking areas), 4 (contamination remediation strategy), 6 (surface water) and 9 (Soft landscaping) of application DC/16/2721/FUL
Granted Conditions 10 docs -
Land North Of Hollow Road Farm Bury Road Fornham St Martin Suffolk
Planning application - variation of condition 2 of DC/17/0521/FUL to allow for use of amended plans for municipal operational hub comprising waste transfer station, household waste recycling centre (including reuse building), fleet depot (including offices), public realm maintenance depot and associated infrastructure including accesses, paths, internal roads and paths, parking, weighbridges, and landscaping
Granted Amendments 21 docs -
West Suffolk Operational Hub Bury Road Fornham St Martin Suffolk IP31 1FE
Planning application - variation of condition 1 of DC/24/1072/VAR to allow use of amended plans for waste transfer area of site for municipal operational hub comprising waste transfer station, household waste recycling centre (including reuse building), fleet depot (including offices), public realm maintenance depot and associated infrastructure including accesses, paths, internal roads and paths, parking, weighbridges, and landscaping
Granted Amendments 30 docs -
Land Off Compiegne Way Bury St Edmunds Suffolk
Discharge of conditions application for DC/22/1294/FUL - conditions 3 - construction management plan, 11 - construction logistics plan, 17 - construction environmental management plan, 21 - arboricultural management plan, 27 - construction surface water management plan, 28 - contamination
Granted Conditions 34 docs -
Land Off Compiegne Way Bury St Edmunds Suffolk
Application for lawful development certificate for existing use or development - commencement of planning permission DC/22/1294/FUL
Granted Lawful development 5 docs -
17 Ord Road Fornham St Martin Suffolk IP31 1TB
Householder prior approval - single storey rear extension which extends beyond the rear wall of the original house by four metres with a maximum height of 3.54 metres and a height of 2.10 metres to the eaves
Withdrawn Extension 2 docsSmall domestic