Planning application
Land At Tar Farm Tar Road Stanton Harcourt Oxfordshire
Still open. Anyone can comment while the consultation period runs, and comments go to the council rather than to us.
Proposal
Variation of condition 20 of permission 21/03711/FUL to amend the commencement of the 40 year operation period trigger
As published by the council, reference 26/02224/S73
Application record
- Reference
- 26/02224/S73
- Status
- Under consideration
- Received
- 14 Sep 2026
- Validated
- 15 Sep 2026
- Ward
- Eynsham and Cassington
- Parish
- South Leigh And High Cogges
Site history
Applications at this address on the West Oxfordshire register
This site has had 6 applications since 2021: 5 approved, 0 refused.
-
26/00931/CND Granted
Land At Tar Farm Tar Road Stanton Harcourt Oxfordshire
Discharge of conditions 4 (Construction Traffic Management Plan), 5 (fencing), and 18 (30-year Biodiversity Management and Monitoring Plan) of planning permission 21/03711/FUL
-
26/00699/CND Granted
Land At Tar Farm Tar Road Stanton Harcourt Oxfordshire
Discharge of conditions 6 (comprehensive landscape scheme), 10 (surface water drainage scheme), 17 (Construction Environmental Management Plan - Biodiversity), and 21 (Archaeological Written Scheme of Investigation) of planning permission 21/03711/FUL
-
25/03115/NMA Granted
Land At Tar Farm Tar Road Stanton Harcourt Oxfordshire
Installation of renewable energy scheme comprising ground mounted photovoltaic arrays with associated substation, invertors, internal access track, landscaping and biodiversity measures, fencing, access gate and ancillary infrastructure (non-material amendment to planning permission 21/03711/FUL to allow removal of some consented solar panels and amendments to onsite infrastructure to address considerations relating to archaeology and Great Crested Newts).
-
21/03711/FUL Granted
Land At Tar Farm Tar Road Stanton Harcourt Oxfordshire
Installation of renewable energy scheme comprising ground mounted photovoltaic arrays with associated substation, invertors, internal access track, landscaping and biodiversity measures, fencing, access gate and ancillary infrastructure (Amended).
-
21/02680/SCREEN Granted
Land At Tar Farm Tar Road Stanton Harcourt Oxfordshire
Screening opinion request for a proposed solar farm and associated infrastructure.
Timeline
Dates from the published record
-
14 Sep 2026
Received by West Oxfordshire
-
15 Sep 2026
Validated
Checked as complete and ready for consideration.
-
28 Sep 2026
Added to PlanIndex
-
Decision
Awaiting decision
Decision expected by 10 November 2026, 8 weeks from validation under the statutory target for most applications. Extensions of time are common and are agreed case by case.
West Oxfordshire took a median of 50 days over the applications it decided in the last year.
Who's behind it
Company information only, from the register and Companies House
Enzygo Ltd Agent, registered in Leeds
Active · incorporated 2008 · Leeds
82 applications on PlanIndex · across 48 councils · 79% granted
Trade members see everything this firm has filed, how it was decided, and get an email the day it files again.
See their track recordDocuments
Plans, drawings, consultee responses and the officer's report
37 documents on file for this application
- PLANNING LAYOUT
- PLANNING ELEVATIONS WELFARE OFFICE
- PLANNING ELEVATIONS PV ARRAY - FRONT
- PLANNING ELEVATION SPARE PARTS CONTAINER
- PLANNING ELEVATIONS PV ARRAY - SIDE
- PLANNING ELEVATIONS O&M BUILDINGS
- SURFACE WATER DRAINAGE STRATEGY
- LANDSCAPE AND ECOLOGICAL MANAGEMENT AND MAINTENANCE PLAN
- BIODIVERSITY MANAGEMENT AND MONITORING PLAN
- CONSTRUCTION TRAFFIC MANAGEMENT PLAN
- GENERAL ARRANGEMENT (SHEET 4 OF 5)
- GENERAL ARRANGEMENT (SHEET 5 OF 5)
- GENERAL ARRANGEMENT (SHEET 3 OF 5)
- GENERAL ARRANGEMENT (SHEET 2 OF 5)
- DETAILED SOFT LANDSCAPE PLAN (SHEET 5 OF 5)
- DETAILED SOFT LANDSCAPE PLAN (SHEET 2 OF 5)
- DETAILED SOFT LANDSCAPE PLAN (SHEET 4 OF 5)
- GENERAL ARRANGEMENT (SHEET 1 OF 5)
- DETAILED SOFT LANDSCAPE PLAN (SHEET 1 OF 5)
- DETAILED HARD LANDSCAPE PLAN (SHEET 3 OF 5)
- DETAILED SOFT LANDSCAPE PLAN (SHEET 3 OF 5)
- CONSTRUCTION ENVIRONMENTAL MANAGEMENT PLAN
- DETAILED HARD LANDSCAPE PLAN (SHEET 5 OF 5)
- DETAILED HARD LANDSCAPE PLAN (SHEET 4 OF 5)
- DETAILED HARD LANDSCAPE PLAN (SHEET 2 OF 5)
- DETAILED HARD LANDSCAPE PLAN (SHEET 1 OF 5)
- BOUNDARY TREATMENT PLAN (SHEET 5 OF 5)
- BOUNDARY TREATMENT PLAN (SHEET 4 OF 5)
- BOUNDARY TREATMENT PLAN (SHEET 3 OF 5)
- BOUNDARY TREATMENT PLAN (SHEET 2 OF 5)
- TREE PROTECTION PLAN (1 OF 3)
- BOUNDARY TREATMENT PLAN (SHEET 1 OF 5)
- ARCHAEOLOGICAL WRITTEN SCHEME OF INVESTIGATION: MITIGATION PLAN
- TREE PROTECTION PLAN (3 OF 3)
- TREE PROTECTION PLAN (2 OF 3)
- MATERIALS AND COLOURS FINSHES
- PLANNING STATEMENT
Watch members (£5 a month) open the document list from here.
Open the documentsWhat happens while it is decided
This application is with West Oxfordshire for determination, against a statutory target of eight weeks. Over the last year West Oxfordshire's median decision took 50 days. More in our guide to how long planning decisions take.
About this record
The published feed does not state which type of application this is; the register entry on West Oxfordshire's portal will say. Our guide explains the common types.