Skip to content
PlanIndex Get alerts
Menu

Planning application

Dean Mill Dean Chipping Norton Oxfordshire OX7 3JX

Awaiting decision West Oxfordshire 26/02106/FUL Full applications

Works: Demolition

Still open. Anyone can comment while the consultation period runs, and comments go to the council rather than to us.

Proposal

Demolition of existing garage and store and erection of a two storey detached lodge, ancillary to Dean Mill.

As published by the council, reference 26/02106/FUL

Application record

Reference
26/02106/FUL
Category
Full applications
Status
Under consideration
Received
28 Aug 2026
Validated
16 Sep 2026
Ward
Chadlington and Churchill
Parish
Spelsbury
Postcode
OX7 3JX

Site history

Applications at this address on the West Oxfordshire register

This site has had 6 applications since 2022: 4 approved, 1 refused.

  • 24/01373/CND Granted

    Dean Mill Dean Chipping Norton Oxfordshire OX7 3JX

    Discharge of conditions 3 (schedule of materials) and 4 (roof sample) of Planning Permission 24/00709/S73

    Decided 27 Jun 2024 Conditions
  • 24/01227/CND Granted

    Dean Mill Dean Chipping Norton Oxfordshire OX7 3JX

    Discharge of condition 6 (full surface water drainage system) of planning permission 24/00709/S73.

    Decided 23 May 2024 Conditions
  • 24/00709/S73 Granted

    Dean Mill Dean Chipping Norton Oxfordshire OX7 3JX

    Variation of condition 2 of Planning Permission 23/00643/FUL to reduce the size of building

    Decided 26 Apr 2024 Amendments
  • 23/00643/FUL Granted

    Dean Mill Dean Chipping Norton Oxfordshire OX7 3JX

    Construction of detached building comprising workshop, covered parking and storage.

    Decided 22 Jun 2023 Full applications
  • 22/01497/FUL Refused

    Dean Mill Dean Chipping Norton Oxfordshire OX7 3JX

    Construction of detached building comprising workshop, covered parking and storage.

    Decided 19 Aug 2022 Full applications

Timeline

Dates from the published record

  1. 28 Aug 2026

    Received by West Oxfordshire

  2. 16 Sep 2026

    Validated

    Checked as complete and ready for consideration.

  3. 16 Sep 2026

    Added to PlanIndex

  4. Decision

    Awaiting decision

    Decision expected by 11 November 2026, 8 weeks from validation under the statutory target for most applications. Extensions of time are common and are agreed case by case.

    West Oxfordshire took a median of 50 days over the applications it decided in the last year.

Documents

Plans, drawings, consultee responses and the officer's report

25 documents on file for this application

  • BAT SURVEY REPORT Supporting Documents · 16 Sep 2026
  • SITE LOCATION PLAN Drawing · 11 Sep 2026
  • FORM 1 CIL Form · 28 Aug 2026
  • PRELIMINARY ECOLOGICAL APPRAISAL Report · 28 Aug 2026
  • FLOOD RISK ASSESSMENT 09.02.2021 Report · 28 Aug 2026
  • FLOOR RISK ASSESSMENT 21.05.2021 Report · 28 Aug 2026
  • FLOOD RISK ASSESSMENT 02.08.2021 Report · 28 Aug 2026
  • HERITAGE STATEMENT Report · 28 Aug 2026
  • EXISTING SOUTH SIDE ELEVATION Drawing · 28 Aug 2026
  • EXISTING NORTH SIDE ELEVATION Drawing · 28 Aug 2026
  • EXISTING FRONT ELEVATION Drawing · 28 Aug 2026
  • EXISTING SECTION AA Drawing · 28 Aug 2026
  • EXISTING GROUND FLOOR PLAN Drawing · 28 Aug 2026
  • EXISTING ROOF PLAN Drawing · 28 Aug 2026
  • EXISTING FIRST FLOOR PLAN Drawing · 28 Aug 2026
  • PROPOSED LODGE GROUND FLOOR PLAN Drawing · 28 Aug 2026
  • PROPOSED LODGE FIRST FLOOR PLAN Drawing · 28 Aug 2026
  • PROPOSED LODGE FRONT ELEVATION Drawing · 28 Aug 2026
  • PROPOSED LODGE ROOF PLAN Drawing · 28 Aug 2026
  • PROPOSED SITE PLAN Drawing · 28 Aug 2026
  • PROPOSED LODGE SECTION AA Drawing · 28 Aug 2026
  • PROPOSED LODGE LEFT ELEVATION Drawing · 28 Aug 2026
  • PROPOSED LODGE REAR ELEVATION Drawing · 28 Aug 2026
  • PROPOSED LODGE RIGHT ELEVATION Drawing · 28 Aug 2026
  • EXISTING SITE PLAN Drawing · 28 Aug 2026

Watch members (£5 a month) open the document list from here.

Open the documents

What happens while it is decided

This application is with West Oxfordshire for determination, against a statutory target of eight weeks. Over the last year West Oxfordshire decided full applications in a median of 76 days. More in our guide to how long planning decisions take.

About full applications

A full application seeks permission for a complete, detailed proposal in one go, with siting, design, access and landscaping all fixed at this stage. More in our guide to planning application types.

Nearby applications

Within 0.3 miles

In West Oxfordshire

  • 25/02635/FUL Granted

    53 Swinbrook Road Carterton Oxfordshire OX18 1DY

    Extension and conversion of the existing bungalow to create two dwellings, the sub-division of the residential garden, and the erection of two semi detached dwellings with access and associated landscaping.

    Received 27 Oct, published by the council 30 Jul 2026 Full applications
  • 26/01840/FUL Granted

    The Bell Inn Langford Lechlade Oxfordshire GL7 3LF

    Construction of freestanding oak pergola to outdoor terrace.

    Received 30 Jul, published by the council 7 Aug 2026 Full applications
  • 26/01706/FUL Granted

    Freeland Methodist Church Wroslyn Road Freeland Witney Oxfordshire OX29 8AQ

    Conversion of Freeland Methodist church to a community hub, incorporating a café, events space and village shop. Works to include installation of air source heat pump, erection of a timber storage shed and alterations to boundary treatment along with associated landscaping, cycle parking and accessibility improvements

    Received 14 Jul, published by the council 7 Aug 2026 Full applications
  • 26/01895/FUL Granted

    Beggars Lodge Great Tew Chipping Norton Oxfordshire OX7 4JP

    Installation of a 20,000 litre water storage tank for irrigation of approved tree planting within the wider grounds of Beggars Lodge

    Received 6 Aug, published by the council 14 Aug 2026 Full applications
  • 26/01559/FUL Refused

    Barn At Churchill Road Kingham Chipping Norton Oxfordshire OX7 6TA

    Conversion of barn to a single one bedroom self-build dwelling, and associated landscaping works

    Received 25 Jun, published by the council 7 Aug 2026 Full applications