Planning application
7 Signal Park Daventry Northamptonshire NN11 4RU
Permission granted. Work must normally begin within three years of the decision or the permission lapses.
Proposal
Change of use from Class B2 (general industrial) and/or Class B8 (storage and distribution) to Class B2 B8 and Class E (c) (iii) - building to be used as a training facility
As published by the council, reference WND/2022/1086
Application record
- Reference
- WND/2022/1086
- Type
- Full Planning Permission
- Status
- 10 - Approved
- Decision
- Approval
- Received
- 2 Dec 2022
- Validated
- 9 Dec 2022
- Decided
- 2 Mar 2023
- Ward
- Daventry East Ward
- Parish
- Daventry East2
- Decision by
- Delegated
- Postcode
- NN11 4RU
Timeline
Dates from the published record
-
2 Dec 2022
Received by West Northamptonshire
-
9 Dec 2022
Validated
Checked as complete and ready for consideration.
-
2 Mar 2023
Decision issued: Approval
-
4 Sep 2026
Added to PlanIndex
Documents
Plans, drawings, consultee responses and the officer's report
6 documents on file for this application
A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.
Trade members open them from here.
Open the documentsWhat a grant of permission means
The process from here
Permission has been granted, usually subject to conditions listed on the decision notice, some of which must be discharged before work starts. The decision notice on the council portal sets out exactly what was approved.
Work must normally begin within three years of the decision or the permission lapses. Neighbours cannot appeal a grant; challenging one means judicial review of how the decision was made, within tight time limits.
About full applications applications
How this application type works
A full application seeks permission for a complete, detailed proposal in one go: siting, design, access and landscaping are all fixed at this stage. It is the standard route for new buildings, conversions and changes of use. The statutory target is eight weeks for smaller schemes and thirteen weeks for major development, though complex cases often take longer by agreement.
Nearby applications
Within 500 metres
-
Unit 16 Signal Park Daventry Northamptonshire NN11 4RU
4 no. non illuminated and 3 no. internally illuminated fascia signs
Granted Advertising 3 docs -
7 Signal Park Daventry Northamptonshire NN11 4RU
Installation of 15m high galvanised steel training tower in south east corner of car park and relocation of 2 no. car parking spaces
Granted Full applications 6 docs -
66 Christchurch Drive Daventry Northamptonshire NN11 4RW
First floor extension above existing garage. Extension of canopy porch and new front window and door.
Refused Full applications Extension Windows or glazing 9 docsSmall domestic -
21 Christchurch Drive Daventry NN11 4RD
92% historically approved · decision due ~12 Oct
Proposed single storey extension to front & side of detached house.
Awaiting decision Householder New dwelling Extension 5 docsSmall domestic -
22 Balliol Road Daventry NN11 4RE
Discharge of conditions 3 [Materials] and 5 [Boundary Treatment] for application 2024/1948/FULL - Erection of 3 Bedroom attached Dwelling and Parking Spaces with dropped kerbs
Granted Conditions 5 docsDomestic -
3 Bodleian Close, Daventry, NN11 4RY
Garage Conversion to habitable space, new front Porch and single storey rear/side extension for new bathroom/storage rooms.
Withdrawn Lawful development Extension 13 docsSmall domestic
Other full applications applications
In West Northamptonshire
-
2026/1962/FULL Refused
19 Deanshanger Road Wicken MK19 6BS
Extension to existing dormer windows, alterations to fenestration, replacement of windows and doors, installation of solar roof panels on garage roof, replacement garage
-
2026/2265/FULL Granted
Eltisley Cottage 5 Chapel Street Kilsby CV23 8XE
Construction of detached concrete garage
-
2026/2062/FULL Granted
4 Paget Close Northampton NN4 7EF
Replacement of existing timber windows with lead diamond pattern inserts to UPVC windows dark brown to front and anthracite grey to rear
-
2026/2234/HH Granted
2 Manor Close Deanshanger MK19 6GX
Loft conversion
-
2026/1933/FULL Refused
12 Winchester Road Northampton NN4 8AY
Increase of 6 occupant House in multpiple occupation [use class C4] to 8 occupant House in multiple occupation [Sui Generis] including single storey rear extension.