Planning application

7 Signal Park Daventry Northamptonshire NN11 4RU

Granted West Northamptonshire WND/2022/0808 Full Planning Permission

Permission granted. Work must normally begin within three years of the decision or the permission lapses.

Proposal

Installation of 15m high galvanised steel training tower in south east corner of car park and relocation of 2 no. car parking spaces

As published by the council, reference WND/2022/0808

Application record

Reference
WND/2022/0808
Type
Full Planning Permission
Status
10 - Approved
Decision
Approval
Received
2 Sep 2022
Validated
9 Sep 2022
Decided
31 Oct 2022
Ward
Daventry East Ward
Parish
Daventry East2
Decision by
Delegated
Postcode
NN11 4RU

Timeline

Dates from the published record

  1. 2 Sep 2022

    Received by West Northamptonshire

  2. 9 Sep 2022

    Validated

    Checked as complete and ready for consideration.

  3. 31 Oct 2022

    Decision issued: Approval

  4. 4 Sep 2026

    Added to PlanIndex

Documents

Plans, drawings, consultee responses and the officer's report

6 documents on file for this application

A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.

Trade members open them from here.

Open the documents

What a grant of permission means

The process from here

Permission has been granted, usually subject to conditions listed on the decision notice, some of which must be discharged before work starts. The decision notice on the council portal sets out exactly what was approved.

Work must normally begin within three years of the decision or the permission lapses. Neighbours cannot appeal a grant; challenging one means judicial review of how the decision was made, within tight time limits.

About full applications applications

How this application type works

A full application seeks permission for a complete, detailed proposal in one go: siting, design, access and landscaping are all fixed at this stage. It is the standard route for new buildings, conversions and changes of use. The statutory target is eight weeks for smaller schemes and thirteen weeks for major development, though complex cases often take longer by agreement.

More on full applications applications in our guide

Nearby applications

Within 500 metres

  • Unit 16 Signal Park Daventry Northamptonshire NN11 4RU

    WND/2022/0610 Submitted 27 Jun 2022 0m away

    4 no. non illuminated and 3 no. internally illuminated fascia signs

    Granted Advertising 3 docs
  • 7 Signal Park Daventry Northamptonshire NN11 4RU

    WND/2022/1086 Submitted 2 Dec 2022 0m away

    Change of use from Class B2 (general industrial) and/or Class B8 (storage and distribution) to Class B2 B8 and Class E (c) (iii) - building to be used as a training facility

    Granted Full applications 6 docs
  • 66 Christchurch Drive Daventry Northamptonshire NN11 4RW

    WND/2022/0868 Submitted 21 Sep 2022 78m away

    First floor extension above existing garage. Extension of canopy porch and new front window and door.

    Refused Full applications Extension Windows or glazing 9 docs
    Small domestic
  • 21 Christchurch Drive Daventry NN11 4RD

    2026/2836/HH Submitted 13 Jul 2026 243m away

    92% historically approved · decision due ~12 Oct

    Proposed single storey extension to front & side of detached house.

    Awaiting decision Householder New dwelling Extension 5 docs
    Small domestic
  • 22 Balliol Road Daventry NN11 4RE

    2025/4505/COND Submitted 31 Oct 2025 285m away

    Discharge of conditions 3 [Materials] and 5 [Boundary Treatment] for application 2024/1948/FULL - Erection of 3 Bedroom attached Dwelling and Parking Spaces with dropped kerbs

    Granted Conditions 5 docs
    Domestic
  • 3 Bodleian Close, Daventry, NN11 4RY

    2025/4779/LDP Submitted 3 Nov 2025 300m away

    Garage Conversion to habitable space, new front Porch and single storey rear/side extension for new bathroom/storage rooms.

    Withdrawn Lawful development Extension 13 docs
    Small domestic

In West Northamptonshire

  • 2026/1962/FULL Refused

    19 Deanshanger Road Wicken MK19 6BS

    Extension to existing dormer windows, alterations to fenestration, replacement of windows and doors, installation of solar roof panels on garage roof, replacement garage

    27 Apr 2026 Full applications
  • 2026/2265/FULL Granted

    Eltisley Cottage 5 Chapel Street Kilsby CV23 8XE

    Construction of detached concrete garage

    20 May 2026 Full applications
  • 2026/2062/FULL Granted

    4 Paget Close Northampton NN4 7EF

    Replacement of existing timber windows with lead diamond pattern inserts to UPVC windows dark brown to front and anthracite grey to rear

    6 May 2026 Full applications
  • 2026/2234/HH Granted

    2 Manor Close Deanshanger MK19 6GX

    Loft conversion

    18 May 2026 Full applications
  • 2026/1933/FULL Refused

    12 Winchester Road Northampton NN4 8AY

    Increase of 6 occupant House in multpiple occupation [use class C4] to 8 occupant House in multiple occupation [Sui Generis] including single storey rear extension.

    23 Apr 2026 Full applications