Skip to content
PlanIndex Get alerts
Menu

Planning application

The Bungalow Lings Wood Lings Way Northampton NN3 8BE

Awaiting decision West Northamptonshire 2026/2766/PND Prior Notification Determination

Works: Demolition

Still open. Anyone can comment while the consultation period runs, and comments go to the council rather than to us.

Proposal

Determination as to whether prior approval is required (under Schedule 2, Part 11, Class B of the above Order) for demolition of building

As published by the council, reference 2026/2766/PND

Application record

Reference
2026/2766/PND
Type
Prior Notification Determination
Status
4 - Consultations Despatched (1-10)
Received
7 Jul 2026
Validated
3 Sep 2026
Ward
Blackthorn and Rectory Farm Ward
Parish
Northampton Town Council
Decision by
Delegated
Postcode
NN3 8BE

Comment by 30 September 2026

The council is taking comments on this application until then. Comments go to West Northamptonshire through their own planning portal.

Timeline

Dates from the published record

  1. 7 Jul 2026

    Received by West Northamptonshire

  2. 3 Sep 2026

    Validated

    Checked as complete and ready for consideration.

  3. 9 Sep 2026

    Added to PlanIndex

  4. 16 Sep 2026

    Status changed to 4 - Consultations Despatched (1-10)

    Previously 3 - Case Officer Allocated (1-10).

  5. Decision

    Awaiting decision

    Decision expected by 29 October 2026, 8 weeks from validation under the statutory target for most applications. Extensions of time are common and are agreed case by case.

    West Northamptonshire took a median of 67 days over the applications it decided in the last year.

Documents

Plans, drawings, consultee responses and the officer's report

9 documents on file for this application

A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.

Trade members open them from here.

Open the documents

What happens while it is decided

This application is with West Northamptonshire for determination, against a statutory target of eight weeks. Over the last year West Northamptonshire decided prior approval applications in a median of 41 days. More in our guide to how long planning decisions take.

About prior approval applications

Prior approval applies where permitted development rights already grant the principle of the work, leaving the council only the specific matters the rules name, commonly within 56 days. More in our guide to planning application types.

Nearby applications

Within 500 metres

  • 3 North Priors Court Northampton NN3 8LA

    2026/2342/LDP Submitted 28 May 2026 125m away

    Proposed conversion of existing garage into habitable space.

    Granted Lawful development 7 docs
  • 31 South Priors Court Northampton NN3 8LD

    2024/4915/LDP Submitted 21 Oct 2024 269m away

    Certificate of Lawfulness for proposed development comprising of garage conversion

    Withdrawn Lawful development 5 docs
  • 7 Lingswood Park Northampton NN3 8TA

    2026/0959/FULL Submitted 25 Feb 2026 375m away

    88% historically approved · decision due ~22 Apr

    Single storey front extension, single storey side extension, erection of new boundary wall and all elevations to be rendered

    Awaiting decision Full applications Extension 13 docs
    Small domestic

In West Northamptonshire

  • 2026/2942/PA Granted

    Land at Long Buckby Covered Reservoir, Lodge Lane, Long Buckby NN6 7PJ

    1 no. 12m telecommunications pole with up to 3 no. antennas attached, plus associated base unit.

    20 Jul 2026 Prior approval
  • 2026/2779/PA Granted

    Toyota Ferris Row Northampton NN3 9HX

    Determination as to whether prior approval is required (under Schedule 2, Part 14, Class J of the above Order) for Installation of roof mounted 126.5kW solar PV system comprising of 275 x Canadian Solar 460w modules

    6 Jul 2026 Prior approval
  • 2026/3553/PNHPD Awaiting decision

    36 Station Road Cogenhoe NN7 1LU

    Determination as to whether prior approval is required (under Schedule 2, Part 1, Class A of the above Order) for proposed demolition of existing rear projection and erection of new single storey rear extension extending 4.5m beyond the rear wall of the original dwelling house, maximum height of 3m and height at the eaves 2.65m.

    3 Sep 2026 Prior approval
  • 2026/2847/PNHPD Granted

    Cestria 19 Badby Road West Daventry NN11 4HJ

    Determination as to whether prior approval is required (under Schedule 2, Part 1, Class A of the above Order) for proposed infill extension to the rear of the property extending 4.80m beyond the rear wall of the original dwelling house, maximum height of 2.40m and height at the eaves 2.20m

    16 Jul 2026 Prior approval
  • 2026/3614/PA Awaiting decision

    Warehouse Unit Parsons Road Daventry NN11 8NF

    Prior approval [Under Schedule 2, Part 14, Class J of the GPDO] for the installation of a PV array on the roof of an existing warehouse at Apex Park.

    2 Sep 2026 Prior approval