Skip to content
PlanIndex Get alerts
Menu

Planning application

Unit C Brackmills Business Park Caswell Road Northampton NN4 7PW

Granted West Northamptonshire 2026/0679/FULL Full Planning Permission

Permission granted. Work must normally begin within three years of the decision or the permission lapses.

Proposal

Proposed roller shutter door, dust extraction unit, external racking, perimeter fencing, security gates and personnel gate. Relocation of air conditioning unit and removal of bollards in order to reinstate existing vehicular access (with proposed left turn only)

As published by the council, reference 2026/0679/FULL

Application record

Reference
2026/0679/FULL
Type
Full Planning Permission
Status
10 - Approved
Decision
Approval
Received
6 Feb 2026
Validated
6 Feb 2026
Decided
2 Jun 2026
Ward
Nene Valley Ward
Parish
Hardingstone Parish Council
Decision by
Delegated
Postcode
NN4 7PW

Timeline

Dates from the published record

  1. 6 Feb 2026

    Received by West Northamptonshire

  2. 2 Jun 2026

    Decision issued: Approval

  3. 10 Aug 2026

    Added to PlanIndex

Documents

Plans, drawings, consultee responses and the officer's report

19 documents on file for this application

A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.

Trade members open them from here.

Open the documents

What a grant of permission means

The process from here

Permission has been granted, usually subject to conditions listed on the decision notice, some of which must be discharged before work starts. The decision notice on the council portal sets out exactly what was approved.

Work must normally begin within three years of the decision or the permission lapses. Neighbours cannot appeal a grant; challenging one means judicial review of how the decision was made, within tight time limits.

About full applications applications

How this application type works

A full application seeks permission for a complete, detailed proposal in one go: siting, design, access and landscaping are all fixed at this stage. It is the standard route for new buildings, conversions and changes of use. The statutory target is eight weeks for smaller schemes and thirteen weeks for major development, though complex cases often take longer by agreement.

More on full applications applications in our guide

Nearby applications

Within 500 metres

  • 52 Caswell Road Northampton NN4 7PW

    2026/1734/MAF Submitted 8 Apr 2026 0m away

    89% historically approved · decision due ~18 Sep

    Erection of a temporary industrial storage building (Use Class B8)

    Awaiting decision Full applications 23 docs
    Major scheme
  • 4 Sketty Close Northampton NN4 7PL

    2026/2402/MAF Submitted 2 Jun 2026 240m away

    89% historically approved · decision due ~13 Oct

    Demolition of the existing buildings and structures. Erection of a new warehouse building for manufacturing, storage and distribution with ancillary office space and staff facilities. Parking, servicing yard, bin store, landscaping, new gate and associated works

    Awaiting decision Full applications Demolition 73 docs
    Major scheme
  • 5 Reynoldston Close Northampton NN4 7BX

    2026/2358/S73 Submitted 29 May 2026 357m away

    94% historically approved · decision due ~24 Jul

    Variation of Condition 2 (plans)-Amended roof falls, steelwork and cladding designs meant the rainwater downpipes required relocating and the parapet height reduced. External plant has been swapped for a quieter unit. The fence and vehicle barrier lines have been changed to better suit access and escape strategies. The new chiller compound is to have a 1.8m mesh fence to prevent unauthorised access to 2024/5310/FULL ( for Single storey extension to existing telecommunications centre with ground floor external plant)

    Awaiting decision Amendments Extension 13 docs
    Small domestic
  • Country Lion Oxwich Close Northampton NN4 7BH

    2024/4464/FULL Submitted 19 Sep 2024 360m away

    Siting of two Portacabins for use as a Heavy Goods Vehicle driver testing facility

    Granted Full applications 14 docs
  • Alcura House Units A And B Compass Business Park Caswell Road Northampton NN4 7BZ

    2026/0808/106D Submitted 19 Feb 2026 379m away

    98% historically approved · decision due ~16 Apr

    Discharge of pre-commencement covenants 3.1 and 3.2 (Social Value Strategy) within the S106 agreement relating to Planning Permission 2025/1579/FULL [Proposed redevelopment of the site to provide employment floorspace for a flexible range of uses (within Classes E(g)(iii), B2 and / or B8) with ancillary offices together with the provision of a service yard, parking, landscaping and associated works]

    Awaiting decision Conditions 5 docs
  • Alcura House Units A And B Compass Business Park Caswell Road Northampton NN4 7BZ

    2026/3263/COND Submitted 4 Aug 2026 379m away

    98% historically approved · decision due ~29 Sep

    Discharge of Condition 14 (Remediation Scheme) of planning permission 2025/1579/FULL (Proposed redevelopment of the site to provide employment floorspace for a flexible range of uses (within Classes E(g)(iii), B2 and / or B8) with ancillary offices together with the provision of a service yard, parking, landscaping and associated works at Compass Business Park Alcura House Units A and B Caswell Road Northampton NN4 7BZ).

    Awaiting decision Conditions 6 docs

In West Northamptonshire

  • 2026/1962/FULL Refused

    19 Deanshanger Road Wicken MK19 6BS

    Extension to existing dormer windows, alterations to fenestration, replacement of windows and doors, installation of solar roof panels on garage roof, replacement garage

    27 Apr 2026 Full applications
  • 2026/2265/FULL Granted

    Eltisley Cottage 5 Chapel Street Kilsby CV23 8XE

    Construction of detached concrete garage

    20 May 2026 Full applications
  • 2026/2062/FULL Granted

    4 Paget Close Northampton NN4 7EF

    Replacement of existing timber windows with lead diamond pattern inserts to UPVC windows dark brown to front and anthracite grey to rear

    6 May 2026 Full applications
  • 2026/2234/HH Granted

    2 Manor Close Deanshanger MK19 6GX

    Loft conversion

    18 May 2026 Full applications
  • 2026/1933/FULL Refused

    12 Winchester Road Northampton NN4 8AY

    Increase of 6 occupant House in multpiple occupation [use class C4] to 8 occupant House in multiple occupation [Sui Generis] including single storey rear extension.

    23 Apr 2026 Full applications