Skip to content
PlanIndex Get alerts
Menu

Planning application

Mcdonalds Restaurants Ltd Brackley Road Towcester NN12 6TQ

Granted West Northamptonshire 2025/4822/FULL Full Planning Permission

Works: Windows or glazing

Permission granted. Work must normally begin within three years of the decision or the permission lapses.

Proposal

Replacement of vertical timber slats with new timber lookalike aluminium slats, for maintenance purposes. The redecoration of door and window frames and the refreshing of the wall render.

As published by the council, reference 2025/4822/FULL

Application record

Reference
2025/4822/FULL
Type
Full Planning Permission
Status
10 - Approved
Decision
Approval
Received
5 Nov 2025
Validated
5 Nov 2025
Decided
21 Jan 2026
Ward
Towcester Ward
Parish
Towcester
Decision by
Delegated
Postcode
NN12 6TQ

Timeline

Dates from the published record

  1. 5 Nov 2025

    Received by West Northamptonshire

  2. 21 Jan 2026

    Decision issued: Approval

  3. 10 Aug 2026

    Added to PlanIndex

Documents

Plans, drawings, consultee responses and the officer's report

8 documents on file for this application

A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.

Trade members open them from here.

Open the documents

What a grant of permission means

The process from here

Permission has been granted, usually subject to conditions listed on the decision notice, some of which must be discharged before work starts. The decision notice on the council portal sets out exactly what was approved.

Work must normally begin within three years of the decision or the permission lapses. Neighbours cannot appeal a grant; challenging one means judicial review of how the decision was made, within tight time limits.

About full applications applications

How this application type works

A full application seeks permission for a complete, detailed proposal in one go: siting, design, access and landscaping are all fixed at this stage. It is the standard route for new buildings, conversions and changes of use. The statutory target is eight weeks for smaller schemes and thirteen weeks for major development, though complex cases often take longer by agreement.

More on full applications applications in our guide

Nearby applications

Within 500 metres

  • Mcdonalds Restaurants Ltd Brackley Road Towcester NN12 6TQ

    2026/0276/FULL Submitted 14 Jan 2026 0m away

    Proposal for the installation of four rapid electric vehicle charging stations and ancillary equipment within the car park of McDonald's, Towcester.

    Granted Full applications 23 docs
  • Land at Towcester Services A43 Towcester NN12 6TQ

    2026/1353/FULL Submitted 16 Mar 2026 0m away

    89% historically approved · decision due ~3 Jun

    Change of use of land to open storage (Use class B8) for storage of vehicles. Installation of fencing and hardstanding (part retrospective).

    Awaiting decision Full applications 13 docs
  • Mcdonalds Restaurants Ltd Brackley Road Towcester NN12 6TQ

    2026/0625/ADV Submitted 5 Feb 2026 0m away

    Advertisement consent to relocate freestanding sign to include new Golden Arch on 12m pole.

    Withdrawn Advertising 10 docs
  • Starbucks Brackley Road Towcester NN12 6TQ

    2026/2363/FULL Submitted 29 May 2026 0m away

    Installation of four rapid electric vehicle charging stations and ancillary equipment within the car park, including one fully accessible EV charging bay.

    Granted Full applications 28 docs
  • Land to the north western side of A43 Towcester NN12 6TQ

    2025/3816/FULL Submitted 20 Aug 2025 0m away

    Change of use of land to open storage (Use class B8) for storage of vehicles, caravans, trailers and containers. Installation of fencing and hardstanding (part retrospective)

    Refused Full applications 16 docs
  • Telecommunications Mast 31494 Brackley Road Towcester NN12 6TQ

    WNS/2023/0303/TLN Submitted 20 Feb 2023 0m away

    Notification of installation of electronic communications for the removal and replacement of 3no. existing antenna on the existing support poles, the installation of 1no. GPS node and the installation of ancillary equipment

    Decided Prior approval 4 docs

In West Northamptonshire

  • 2026/1962/FULL Refused

    19 Deanshanger Road Wicken MK19 6BS

    Extension to existing dormer windows, alterations to fenestration, replacement of windows and doors, installation of solar roof panels on garage roof, replacement garage

    27 Apr 2026 Full applications
  • 2026/2265/FULL Granted

    Eltisley Cottage 5 Chapel Street Kilsby CV23 8XE

    Construction of detached concrete garage

    20 May 2026 Full applications
  • 2026/2062/FULL Granted

    4 Paget Close Northampton NN4 7EF

    Replacement of existing timber windows with lead diamond pattern inserts to UPVC windows dark brown to front and anthracite grey to rear

    6 May 2026 Full applications
  • 2026/2234/HH Granted

    2 Manor Close Deanshanger MK19 6GX

    Loft conversion

    18 May 2026 Full applications
  • 2026/1933/FULL Refused

    12 Winchester Road Northampton NN4 8AY

    Increase of 6 occupant House in multpiple occupation [use class C4] to 8 occupant House in multiple occupation [Sui Generis] including single storey rear extension.

    23 Apr 2026 Full applications