Planning application

Land South of Turweston Road Brackley

Awaiting decision West Northamptonshire 2025/3061/MAF Full Planning Permission (Major)

Works: Extension Major scheme

Read from the description, not a valuation. How we read the register

Still open. Anyone can comment while the consultation period runs, and comments go to the council rather than to us.

Proposal

Erection of 320 dwellings on the Brackley East Sustainable Urban Extension including site accesses off Turweston Road, highway works, parking, public open space, equipped children’s play areas, allotments, landscaping, sustainable urban drainage, foul water drainage, ground works, noise attenuation measures, electrical sub-stations and associated works.

As published by the council, reference 2025/3061/MAF

Application record

Reference
2025/3061/MAF
Type
Full Planning Permission (Major)
Status
4 - Consultations Despatched (1-10)
Received
16 Jul 2025
Validated
6 Aug 2025
Ward
Brackley Ward
Parish
Brackley
Decision by
Committee

Site history

Applications at this address on the West Northamptonshire register

This site has had 3 applications since 2025: 1 approved, 0 refused.

  • 2026/1744/NMA Granted

    Land South Of Turweston Road Brackley

    Non-Material Amendment is sought to pre-commencement Condition 31 to amend the trigger point in regards to Units 1-15 for when the approved works can be carried out to application S/2017/0601/EIA [Variation of conditions 3 (Approved plans), 10 (Protected species), 13 (Levels), 19 (Badgers), 20 (Bats), 21 (Great Crested Newts), 22 (Planting - south western boundary), 23 (Planting - watercourses), 24 (Ecology), 25 (Attenuation basins), 34 (Hedgerows) and 37 (Landscaping), and the removal of condition 38 (Sustainable Homes) to planning permission S/2011/0141/MAO (Residential development comprising up to 350 dwellings and access from Turweston Road (outline) (includes Environmental Statement) at Land South of Turweston Road, Brackley) To seek approval for the rewording of some of the ecological conditions, and the removal of the outdated condition Code for Sustainable Homes].

    Decided 11 Jun 2026 Amendments
  • 2025/1871/COND Awaiting decision

    Land South Of Turweston Road Brackley

    Partial discharge of Condition 17 (Drainage) relating to Phase 1 of the development only of Planning Permission S/2017/0601/EIA. (Variation of conditions 3 (Approved plans), 10 (Protected species), 13(levels), 19(Badgers), 20 (Bats), 21(Great Crested Newts), 22(Planting - south western boundary), 23 (Planting - watercourses), 24 (Ecology), 25 ( Attenuation basins), 34 (Hedgerows) and 37(Landscaping), and the removal of Condition 38 (sustainable Homes) to planning permission S/2011/0141/MAO (Residential development comprising up to 350 dwellings and access from Turweston Road (outline) (includes Environmental Statement) at Land South of Turweston Road, Brackley) To seek approval for the rewording of some of the ecological conditions, and the removal of the outdated condition Code for Sustainable Homes at Land South of Turweston Road Brackley)

    Submitted 30 Apr 2025 Conditions

Timeline

Dates from the published record

  1. 16 Jul 2025

    Received by West Northamptonshire

  2. 6 Aug 2025

    Validated

    Checked as complete and ready for consideration.

  3. 4 Aug 2026

    Added to PlanIndex

  4. Decision

    Awaiting decision

    Decision expected by 5 November 2025, 13 weeks from validation under the statutory target. Extensions of time are common and are agreed case by case.

    West Northamptonshire took a median of 67 days over the applications it decided in the last year.

Documents

Plans, drawings, consultee responses and the officer's report

144 documents on file for this application

A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.

Trade members open them from here.

Open the documents

What happens while it is decided

This application is with West Northamptonshire for determination, against a statutory target of thirteen weeks. Over the last year West Northamptonshire decided full applications in a median of 101 days. More in our guide to how long planning decisions take.

About full applications

A full application seeks permission for a complete, detailed proposal in one go, with siting, design, access and landscaping all fixed at this stage. More in our guide to planning application types.

In West Northamptonshire

  • 2026/1962/FULL Refused

    19 Deanshanger Road Wicken MK19 6BS

    Extension to existing dormer windows, alterations to fenestration, replacement of windows and doors, installation of solar roof panels on garage roof, replacement garage

    27 Apr 2026 Full applications
  • 2026/2265/FULL Granted

    Eltisley Cottage 5 Chapel Street Kilsby CV23 8XE

    Construction of detached concrete garage

    20 May 2026 Full applications
  • 2026/2062/FULL Granted

    4 Paget Close Northampton NN4 7EF

    Replacement of existing timber windows with lead diamond pattern inserts to UPVC windows dark brown to front and anthracite grey to rear

    6 May 2026 Full applications
  • 2026/2234/HH Granted

    2 Manor Close Deanshanger MK19 6GX

    Loft conversion

    18 May 2026 Full applications
  • 2026/1933/FULL Refused

    12 Winchester Road Northampton NN4 8AY

    Increase of 6 occupant House in multpiple occupation [use class C4] to 8 occupant House in multiple occupation [Sui Generis] including single storey rear extension.

    23 Apr 2026 Full applications