Land At Greendykes Road Broxburn West Lothian EH52 5AF

Awaiting decision West Lothian 0436/P/25 Planning Permission in Principle

Works: New dwelling Major scheme

Read from the description, not a valuation. How we read the register

Still open. Anyone can comment while the consultation period runs, and comments go to the council rather than to us.

Proposal

Planning permission in principle for the development of a 67.2ha site for residential development (class 9), local centre with mixed uses (classes 1A, 3, 4, 10,11), open space, parkland, landscaping, active travel, public transport, access, parking, and infrastructure works, with detailed design and layout for phase 1 (503 units) (EIA development)

As published by the council, reference 0436/P/25

Application record

Reference
0436/P/25
Type
Planning Permission in Principle
Status
Awaiting decision
Received
3 Jun 2025
Validated
4 Jun 2025
Ward
Broxburn, Uphall & Winchburgh
Parish
Broxburn
Decision by
Blank Field
Postcode
EH52 5AF

Timeline

Dates from the published record

  1. 3 Jun 2025

    Received by West Lothian

  2. 4 Jun 2025

    Validated

    Checked as complete and ready for consideration.

  3. 6 Aug 2026

    Added to PlanIndex

  4. Decision

    Awaiting decision

    Decision expected by 30 July 2025, 8 weeks from validation under the statutory target for most applications. Extensions of time are common and are agreed case by case.

    West Lothian took a median of 63 days over the applications it decided in the last year.

Who's behind it

Company information only, from the register and Companies House

Calton Planning + Development Limited Agent, a planning consultancy

6 applications on PlanIndex · across 4 councils

Trade members see everything this firm has filed, how it was decided, and get an email the day it files again.

See their track record

Documents

Plans, drawings, consultee responses and the officer's report

398 documents on file for this application

  • MRA REPORT DECEMBER 2025 PART1 Report · 23 Jan 2026
  • MRA REPORT DECEMBER 2025 PART2 Report · 23 Jan 2026
  • MRA REPORT DECEMBER 2025 PART3-C Report · 23 Jan 2026
  • MRA REPORT DECEMBER 2025 PART4 Report · 23 Jan 2026
  • WELLPOINT DECOMMISSIONING REPORT Report · 23 Jan 2026
  • PHASE 1 SI PARK Report · 19 Jan 2026
  • PHASE 1 SI SITE 2 Report · 19 Jan 2026
  • UPDATED SI FOR SITE 1 PART 1 OF 4 Report · 19 Jan 2026
  • UPDATED SI FOR SITE 1 PART 2 OF 4 Report · 19 Jan 2026
  • UPDATED SI FOR SITE 1 PART 3 OF 4 Report · 19 Jan 2026
  • UPDATED SI FOR SITE 1 PART 4 OF 4 Report · 19 Jan 2026
  • KAYA FLOODING COVERING LETTER Report · 24 Dec 2025
  • AMENDED FLOOD RISK TECHNICAL NOTE Report · 18 Dec 2025
  • OBJECTION FROM ECCLESMACHAN & THREEMILETOWN COMMUNITY COUNCIL Public Comment · 17 Jul 2025
  • GRAPHIC PS APPENDICES Report · 10 Jul 2025
  • GRAPHIC PLANNING STATEMENT Report · 10 Jul 2025
  • MRS VIVIENNE IS BEATTIE-OBJECTS(FULL) Public Comment · 09 Jul 2025
  • RESPONSE FROM WINCHBURGH DEVELOPMENTS General Comment · 07 Jul 2025
  • DOC06 OPEN SPACE REPORT APPENDICES Report · 02 Jul 2025
  • DOC06 OPEN SPACE REPORT Report · 02 Jul 2025
  • MISS REBECCA HAWKES-OBJECTS(FULL) Public Comment · 01 Jul 2025
  • MARNIE MCKENDRY -OBJECTS(FULL) Public Comment · 01 Jul 2025
  • MISS ZOE JARVIS-OBJECTS(FULL) Public Comment · 30 Jun 2025
  • MRS JOANNE JENKINS -OBJECTS(FULL) Public Comment · 30 Jun 2025
  • MR RYAN ROBERTSON-OBJECTS(FULL) Public Comment · 27 Jun 2025
  • JULIE ATKINSON-OBJECTS(FULL) Public Comment · 26 Jun 2025
  • MISS ANNE KIRKWOOD-OBJECTS(FULL) Public Comment · 25 Jun 2025
  • MR MURDO MACLEOD-OBJECTS(FULL) Public Comment · 25 Jun 2025
  • MRS JEAN KIRKWOOD-OBJECTS(FULL) Public Comment · 25 Jun 2025
  • CALTON_PLANNING_PRE_APP_CONSULT Report · 25 Jun 2025
  • CALTON_GREENDYKES_PAC_APPENDIX Report · 25 Jun 2025
  • 2305-SSM-DPP-XX-AR-10307 3D VISUALISATIONS SHEET1 - ORCHARD WAY LOOKING WEST Drawing · 24 Jun 2025
  • 2305-SSM-DPP-XX-AR-10308 3D VISUALISATIONS SHEET2 - GREENDYKES SQUARE LOOKING SO Drawing · 24 Jun 2025
  • 2305-SSM-DPP-XX-AR-10309 3D VISUALISATIONS SHEET3 - CENTRAL PARKWAY LOOKING EAST Drawing · 24 Jun 2025
  • 2305-SSM-DPP-XX-AR-10310 3D VISUALISATIONS SHEET4 - ALBYN GATE LOOKING NORTH Drawing · 24 Jun 2025
  • GRAPHIC VERSION OF PAC REPORT - APPENDICES PART 1 Report · 24 Jun 2025
  • GRAPHIC VERSION OF PAC REPORT - APPENDICES PART 2 Report · 24 Jun 2025
  • GRAPHIC VERSION OF PAC REPORT - APPENDICES PART 3 Report · 24 Jun 2025
  • GRAPHIC VERSION OF PAC REPORT - APPENDICES PART 4A Report · 24 Jun 2025
  • GRAPHIC VERSION OF PAC REPORT - APPENDICES PART 4B Report · 24 Jun 2025
  • GRAPHIC VERSION OF PAC REPORT - APPENDICES PART 5 Report · 24 Jun 2025
  • GRAPHIC VERSION OF PAC REPORT Report · 24 Jun 2025
  • MS LISA ROBERTSON-OBJECTS(FULL) Public Comment · 24 Jun 2025
  • MR SEAMUS SOMERVILLE-OBJECTS(FULL) Public Comment · 23 Jun 2025
  • MRS MONIKA SOMERVILLE -OBJECTS(FULL) Public Comment · 23 Jun 2025
  • MR SEAMUS SOMERVILLE-OBJECTS(FULL) Public Comment · 23 Jun 2025
  • MR FRANCIS RYAN-OBJECTS(FULL) Public Comment · 21 Jun 2025
  • MR DAVID CRAIG-OBJECTS(FULL) Public Comment · 19 Jun 2025
  • MRS SUZANNE BARTON-OBJECTS(FULL) Public Comment · 18 Jun 2025
  • MISS SOFIA THURU-NEUTRAL(FULL) Public Comment · 17 Jun 2025
  • MR DAVID SUTHERLAND-OBJECTS(FULL) Public Comment · 17 Jun 2025
  • MRS SONJA GRAY-OBJECTS(FULL) Public Comment · 17 Jun 2025
  • MISS ANNA JURKIEWICZ -OBJECTS(FULL) Public Comment · 16 Jun 2025
  • MRS FAY GALLACHER-OBJECTS(FULL) Public Comment · 16 Jun 2025
  • MS FIONA PRYDE-OBJECTS(FULL) Public Comment · 16 Jun 2025
  • MISS LOUISE KING-OBJECTS(FULL) Public Comment · 15 Jun 2025
  • MS DEBORAH WILLIAMSON -OBJECTS(FULL) Public Comment · 14 Jun 2025
  • MRS EMMA VAN DER WOLF-OBJECTS(FULL) Public Comment · 14 Jun 2025
  • MR GEORGE THOMSON-OBJECTS(FULL) Public Comment · 14 Jun 2025
  • DR ALASTAIR MORRISON-NEUTRAL(FULL) Public Comment · 14 Jun 2025
  • MR JAMIE DYER-OBJECTS(FULL) Public Comment · 14 Jun 2025
  • MRS YVONNE REID -OBJECTS(FULL) Public Comment · 14 Jun 2025
  • MS MARGARET MARTIN-OBJECTS(FULL) Public Comment · 13 Jun 2025
  • MR STEPHEN MCDONNELL-OBJECTS(FULL) Public Comment · 13 Jun 2025
  • MISS SARAH MACKIE-OBJECTS(FULL) Public Comment · 13 Jun 2025
  • MR LEE RICHARDSON-OBJECTS(FULL) Public Comment · 13 Jun 2025
  • MISS AIMI BURROWS -OBJECTS(FULL) Public Comment · 13 Jun 2025
  • MRS LISA CAIRNEY-OBJECTS(FULL) Public Comment · 13 Jun 2025
  • MRS CLAIRE WELSH-OBJECTS(FULL) Public Comment · 13 Jun 2025
  • MRS ANNETTE PIRIE-OBJECTS(FULL) Public Comment · 13 Jun 2025
  • MRS DANIELLE BIRKETT-OBJECTS(FULL) Public Comment · 13 Jun 2025
  • MRS JANE LAIRD-OBJECTS(FULL) Public Comment · 13 Jun 2025
  • MS JO WILSON-OBJECTS(FULL) Public Comment · 13 Jun 2025
  • MR ANDY G-OBJECTS(FULL) Public Comment · 13 Jun 2025
  • DR TOMMY MCCLELLAN -OBJECTS(FULL) Public Comment · 13 Jun 2025
  • RYAN DONAGHY-OBJECTS(FULL) Public Comment · 13 Jun 2025
  • MRS SUZANNE WHARTON-OBJECTS(FULL) Public Comment · 13 Jun 2025
  • MISS DIANE BURNSIDE -OBJECTS(FULL) Public Comment · 13 Jun 2025
  • MR ALLAN EDWARDS-OBJECTS(FULL) Public Comment · 13 Jun 2025
  • MS ELIZABETH GRAHAM -OBJECTS(FULL) Public Comment · 13 Jun 2025
  • MRS KERRY PEEBLES-OBJECTS(FULL) Public Comment · 13 Jun 2025
  • MRS AMY TURNBULL -OBJECTS(FULL) Public Comment · 12 Jun 2025
  • MR HUDSON BARNETT-OBJECTS(FULL) Public Comment · 12 Jun 2025
  • MISS AMY BRYCE-OBJECTS(FULL) Public Comment · 12 Jun 2025
  • MS MARY GOWANS-OBJECTS(FULL) Public Comment · 12 Jun 2025
  • MISS KATE CROSBIE-OBJECTS(FULL) Public Comment · 12 Jun 2025
  • MRS KAREN RYCE-OBJECTS(FULL) Public Comment · 12 Jun 2025
  • MISS ELAINE WILSON -OBJECTS(FULL) Public Comment · 12 Jun 2025
  • MISS NICOLA TOPPING -OBJECTS(FULL) Public Comment · 12 Jun 2025
  • MISS KIERA ROBERTSON-OBJECTS(FULL) Public Comment · 12 Jun 2025
  • MR PAUL MITCHELL-SUPPORTS(FULL) Public Comment · 12 Jun 2025
  • MRS GLYNIS SMITH-OBJECTS(FULL) Public Comment · 12 Jun 2025
  • MR JODY HICKS -OBJECTS(FULL) Public Comment · 12 Jun 2025
  • MISS VALERIE SYMINGTON -OBJECTS(FULL) Public Comment · 12 Jun 2025
  • MISS TANYA BRUCE-OBJECTS(FULL) Public Comment · 12 Jun 2025
  • MISS JOY PITTS-OBJECTS(FULL) Public Comment · 12 Jun 2025
  • MR IAN STEWART-OBJECTS(FULL) Public Comment · 12 Jun 2025
  • MRS SOPHIE DOOLEY-SUPPORTS(FULL) Public Comment · 12 Jun 2025
  • MS RAFFERTY MR GRIEVE Public Comment · 11 Jun 2025
  • MR MICHAEL GLADSTONE-OBJECTS(FULL) Public Comment · 09 Jun 2025
  • MISS HELEN MURPHY-OBJECTS(FULL) Public Comment · 09 Jun 2025
  • MR GEORGE LIDDLE -OBJECTS(FULL) Public Comment · 09 Jun 2025
  • MRS DIANE PENMAN -OBJECTS(FULL) Public Comment · 08 Jun 2025
  • MR DYLAN SEMPLE-OBJECTS(FULL) Public Comment · 07 Jun 2025
  • MR CHARLES MCDOUGALL-OBJECTS(FULL) Public Comment · 07 Jun 2025
  • MR ANDREW SAYERS -OBJECTS(FULL) Public Comment · 06 Jun 2025
  • MISS JEMMA FINLAYSON-OBJECTS(FULL) Public Comment · 06 Jun 2025
  • MRS JACLYN MCLEAN-WARD-OBJECTS(FULL) Public Comment · 06 Jun 2025
  • MRS ELAINE WILKIE-OBJECTS(FULL) Public Comment · 06 Jun 2025
  • MISS LAURYN APPLEBY -OBJECTS(FULL) Public Comment · 05 Jun 2025
  • MRS KELLY GIBSON -OBJECTS(FULL) Public Comment · 05 Jun 2025
  • MRS FIONA WALKER LINTON -OBJECTS(FULL) Public Comment · 05 Jun 2025
  • MR JACK STEEDMAN-OBJECTS(FULL) Public Comment · 05 Jun 2025
  • MS ANGELA BROWN-OBJECTS(FULL) Public Comment · 05 Jun 2025
  • MRS LIZANN REID (TAINSH)-OBJECTS(FULL) Public Comment · 05 Jun 2025
  • MR ROLAND TAYLOR-OBJECTS(FULL) Public Comment · 05 Jun 2025
  • MS MAIRI BROWN-OBJECTS(FULL) Public Comment · 05 Jun 2025
  • MS ANNE MARIE BOYD-OBJECTS(FULL) Public Comment · 05 Jun 2025
  • MISS ALANA MURPHY-OBJECTS(FULL) Public Comment · 05 Jun 2025
  • MR JAMES GRAY-OBJECTS(FULL) Public Comment · 05 Jun 2025
  • 24-162-40B SPA REFUSE VEHICLE SHEET 1 OF 2 Drawing · 04 Jun 2025
  • 24-162-41B SPA REFUSE VEHICLE SHEET 2 OF 2 Drawing · 04 Jun 2025
  • APPLICATION SUMMARY PDF Other · 04 Jun 2025
  • SUBMITTED PLANS Drawing · 04 Jun 2025
  • MR TERRY KING-OBJECTS(FULL) Public Comment · 04 Jun 2025
  • MR DOUG FREELAND-OBJECTS(FULL) Public Comment · 04 Jun 2025
  • MR AARON SABISTON-SUPPORTS(FULL) Public Comment · 04 Jun 2025
  • MRS CATHERINE CRAWFORD -OBJECTS(FULL) Public Comment · 04 Jun 2025
  • MISS CLAIRE GIBB-OBJECTS(FULL) Public Comment · 04 Jun 2025
  • MISS MAREE LOCK-OBJECTS(FULL) Public Comment · 04 Jun 2025
  • MISS CAROLANN SPEIRS-OBJECTS(FULL) Public Comment · 04 Jun 2025
  • MRS ANGELA GLADSTONE-NEUTRAL(FULL) Public Comment · 04 Jun 2025
  • MRS ANGELA GLADSTONE-OBJECTS(FULL) Public Comment · 04 Jun 2025
  • MR LEE FLANNIGAN-BROWN-OBJECTS(FULL) Public Comment · 04 Jun 2025
  • MRS LYNN THOMSON THOMSON-OBJECTS(FULL) Public Comment · 04 Jun 2025
  • MR BRIAN HUGHES-SUPPORTS(FULL) Public Comment · 04 Jun 2025
  • MISS KIRSTI PRESTON -OBJECTS(FULL) Public Comment · 04 Jun 2025
  • MRS CHRISTINE THOMSON THOMSON -OBJECTS(FULL) Public Comment · 04 Jun 2025
  • MRS KELLY ROONEY-OBJECTS(FULL) Public Comment · 04 Jun 2025
  • MR MAX MCPHIE-OBJECTS(FULL) Public Comment · 04 Jun 2025
  • MR COLIN MCLAREN-OBJECTS(FULL) Public Comment · 04 Jun 2025
  • MISS EMMA DAVIES-OBJECTS(FULL) Public Comment · 04 Jun 2025
  • MRS LAUREN FLANNIGAN-BROWN-OBJECTS(FULL) Public Comment · 04 Jun 2025
  • APPLICATION SUMMARY PDF Other · 03 Jun 2025
  • DOC09 EIA NON-TECH SUMMARY Report · 03 Jun 2025
  • DOC09A EIA REPORT VOLUME 4 APPENDIX 5 1 Report · 03 Jun 2025
  • DOC09A EIA REPORT VOLUME 4 APPENDIX 5 2 Report · 03 Jun 2025
  • DOC09A-Q EIA REPORT VOL 1 CHAP 4 SITE SELE AND DES ITER Report · 03 Jun 2025
  • DOC09A-Q EIA REPORT VOL 1 CHAP10 SUM OF EFFECTS Report · 03 Jun 2025
  • DOC09A-Q EIA REPORT VOL 3 FIGURES 5 12A - 5 13C Report · 03 Jun 2025
  • DOC09A-Q EIA REPORT VOL 3 FIGURES 5 9A - 5 11C Report · 03 Jun 2025
  • DOC09A-Q EIA REPORT VOLUME 1 CHAPTER 2 APPROACH TO EIA Report · 03 Jun 2025
  • DOC09A-Q EIA REPORT VOLUME 1 CHAPTER 5 LVIA Report · 03 Jun 2025
  • DOC09A-Q EIA REPORT VOLUME 1 CHAPTER 6 CULTURAL HERITAGE Report · 03 Jun 2025
  • DOC09A-Q EIA REPORT VOLUME 1 CHAPTER 7 BIODIVERSITY Report · 03 Jun 2025
  • DOC09A-Q EIA REPORT VOLUME 1 CHAPTER 8 TRANSPORT Report · 03 Jun 2025
  • DOC09A-Q EIA REPORT VOLUME 2 FIGURE 1 1 Report · 03 Jun 2025
  • DOC09A-Q EIA REPORT VOLUME 2 FIGURE 1 2 Report · 03 Jun 2025
  • DOC09A-Q EIA REPORT VOLUME 2 FIGURE 10 1 Report · 03 Jun 2025
  • DOC09A-Q EIA REPORT VOLUME 2 FIGURE 3 1 Report · 03 Jun 2025
  • DOC09A-Q EIA REPORT VOLUME 2 FIGURE 3 10 Report · 03 Jun 2025
  • DOC09A-Q EIA REPORT VOLUME 2 FIGURE 3 11 Report · 03 Jun 2025
  • DOC09A-Q EIA REPORT VOLUME 2 FIGURE 3 12 Report · 03 Jun 2025
  • DOC09A-Q EIA REPORT VOLUME 2 FIGURE 3 2 Report · 03 Jun 2025
  • DOC09A-Q EIA REPORT VOLUME 2 FIGURE 3 3A Report · 03 Jun 2025
  • DOC09A-Q EIA REPORT VOLUME 2 FIGURE 3 3B Report · 03 Jun 2025
  • DOC09A-Q EIA REPORT VOLUME 2 FIGURE 3 3C Report · 03 Jun 2025
  • DOC09A-Q EIA REPORT VOLUME 2 FIGURE 3 4 Report · 03 Jun 2025
  • DOC09A-Q EIA REPORT VOLUME 2 FIGURE 3 5 Report · 03 Jun 2025
  • DOC09A-Q EIA REPORT VOLUME 2 FIGURE 3 6A Report · 03 Jun 2025
  • DOC09A-Q EIA REPORT VOLUME 2 FIGURE 3 6B Report · 03 Jun 2025
  • DOC09A-Q EIA REPORT VOLUME 2 FIGURE 3 6C Report · 03 Jun 2025
  • DOC09A-Q EIA REPORT VOLUME 2 FIGURE 3 6D Report · 03 Jun 2025
  • DOC09A-Q EIA REPORT VOLUME 2 FIGURE 3 7 Report · 03 Jun 2025
  • DOC09A-Q EIA REPORT VOLUME 2 FIGURE 3 8 Report · 03 Jun 2025
  • DOC09A-Q EIA REPORT VOLUME 2 FIGURE 3 9 Report · 03 Jun 2025
  • DOC09A-Q EIA REPORT VOLUME 2 FIGURE 4 1 Report · 03 Jun 2025
  • DOC09A-Q EIA REPORT VOLUME 2 FIGURE 4 2 Report · 03 Jun 2025
  • DOC09A-Q EIA REPORT VOLUME 2 FIGURE 4 3 Report · 03 Jun 2025
  • DOC09A-Q EIA REPORT VOLUME 2 FIGURE 4 4 Report · 03 Jun 2025
  • DOC09A-Q EIA REPORT VOLUME 2 FIGURE 4 5A Report · 03 Jun 2025
  • DOC09A-Q EIA REPORT VOLUME 2 FIGURE 4 5B Report · 03 Jun 2025
  • DOC09A-Q EIA REPORT VOLUME 2 FIGURE 6 1 Report · 03 Jun 2025
  • DOC09A-Q EIA REPORT VOLUME 2 FIGURE 6 2A Report · 03 Jun 2025
  • DOC09A-Q EIA REPORT VOLUME 2 FIGURE 6 2B Report · 03 Jun 2025
  • DOC09G EIA REPORT VOLUME 4 APPENDIX 7 4 Report · 03 Jun 2025
  • DOC09H EIA REPORT VOLUME 4 APPENDIX 7 5 Report · 03 Jun 2025
  • DOC09I EIA REPORT VOLUME 4 APPENDIX 7 6 Report · 03 Jun 2025
  • DOC09J EIA REPORT VOLUME 4 APPENDIX 7 7 Report · 03 Jun 2025
  • DOC09K EIA REPORT VOLUME 4 APPENDIX 7 8 Report · 03 Jun 2025
  • DOC09M EIA REPORT VOLUME 4 APPENDIX 7 10 Report · 03 Jun 2025
  • DOC9L EIA REPORT VOLUME 4 APPENDIX 7 9 Report · 03 Jun 2025
  • A LOCATION PLAN Drawing · 03 Jun 2025
  • APPLICATION PDF Application Form · 03 Jun 2025
  • 2024 CHERRYWOOD S459 HOUSE TYPE-24S459-P2 PLANNING ELEVATION RENDER AS REV A Drawing · 03 Jun 2025
  • 2024 LAYFORD S555 HOUSE TYPE-24S555-P1 PLANNING RENDER AS REV A Drawing · 03 Jun 2025
  • 2024 LONGMONT SA22 - HA 2B4P BUNGALOW-24SA22-P1 - PLANNING ELEVATIONS RENDER REV Drawing · 03 Jun 2025
  • 2024 THORNTON S350 HOUSE TYPE-24S350-P1 PLANNING RENDER AS REV A Drawing · 03 Jun 2025
  • 2305-SSM-DPP-DR-AR-10101- REV 02 DETAILED APPLICATION EXISTING SITE PLAN Drawing · 03 Jun 2025
  • 2305-SSM-DPP-DR-AR-10201- REV 04 CHARACTER AREAS PLAN Drawing · 03 Jun 2025
  • 2305-SSM-DPP-DR-AR-10205- REV 03 LANDSCAPE MASTERPLAN- SHEET 4 Drawing · 03 Jun 2025
  • 14348-GOO-P1-XX-DR-C-0501 PROPOSED PARK LEVELS - PHASE 1 Drawing · 03 Jun 2025
  • 14348-GOO-P1-XX-DR-C-0504 PROPOSED OFFSITE PATH LONG SECTIONS Drawing · 03 Jun 2025
  • 14348-GOO-P1-XX-DR-C-0505 PROPOSED OFFSITE PATH SECTIONS Drawing · 03 Jun 2025
  • 14348-GOO-P1-XX-DR-C-0702 B8020 SECTIONS Drawing · 03 Jun 2025
  • 14348-GOO-P2-XX-DR-C-0502 PROPOSED LEVELS SHEET 2 Drawing · 03 Jun 2025
  • 14348-GOO-P2-XX-DR-C-0551 DRAINAGE LAYOUT SHEET 1 Drawing · 03 Jun 2025
  • 14348-GOO-P2-XX-DR-C-0591 PRE DEVELOPMENT FLOW PATHS Drawing · 03 Jun 2025
  • DOC 11 - DRAINAGE STRATEGY REPORT PHASE 1 Report · 03 Jun 2025
  • DOC02 PAC PART 6 Report · 03 Jun 2025
  • DOC02 PAC PART 8 Report · 03 Jun 2025
  • DOC02 PAC PART 1 Report · 03 Jun 2025
  • DOC03 SOCB Report · 03 Jun 2025
  • DOC04 DAS PART 1 Report · 03 Jun 2025
  • DOC05 PHASE 2 DESIGN CODE PART 3 BackGround Papers · 03 Jun 2025
  • DOC05 PHASE 2 DESIGN CODE PART 4 BackGround Papers · 03 Jun 2025
  • DOC05 PHASE 2 DESIGN CODE PART 6 BackGround Papers · 03 Jun 2025
  • DOC08 PLANNING APPLICATION COVERING LETTER Correspondence · 03 Jun 2025
  • DOC09Q EIA REPORT VOLUME 4 APPENDIX 8 2 BackGround Papers · 03 Jun 2025
  • DOC10 APPENDIX B FRA - INDEPENDENT CHECK BackGround Papers · 03 Jun 2025
  • DOC10 FLOOD RISK ASSESSMENT - PHASES 1 AND 2 BackGround Papers · 03 Jun 2025
  • DOC12 DRAINAGE STRATEGY REPORT PART 1 - PHASE 2 BackGround Papers · 03 Jun 2025
  • DOC09O EIA REPORT VOLUME 4 APPENDIX 8 1 PART 3 BackGround Papers · 03 Jun 2025
  • DOC09O EIA REPORT VOLUME 4 APPENDIX 8 1 PART 4 BackGround Papers · 03 Jun 2025
  • DOC10 FLOOD RISK ASSESSMENT - PHASES 1 AND 2 BackGround Papers · 03 Jun 2025
  • DOC12 DRAINAGE STRATEGY REPORT PART 1 - PHASE 2 BackGround Papers · 03 Jun 2025
  • DOC12 DRAINAGE STRATEGY REPORT PART 2 - PHASE 2 BackGround Papers · 03 Jun 2025
  • DOC12 DRAINAGE STRATEGY REPORT PART 3 - PHASE 2 BackGround Papers · 03 Jun 2025
  • DOC13 SI PART 8 Report · 03 Jun 2025
  • DOC14 - CMRA SITE 1 Report · 03 Jun 2025
  • POST SUBMISSION ADDITIONAL DOCUMENTS-003 BackGround Papers · 03 Jun 2025
  • 24-162-50 CUT AND FILL PLAN SHEET 1 OF 2 PHASE 1 Drawing · 03 Jun 2025
  • 24-162-51 CUT AND FILL PLAN SHEET 2 OF 2 PHASE 1 Drawing · 03 Jun 2025
  • 24-162-61 PRE DEV FALL ARROWS SHEET 2 OF 2 Drawing · 03 Jun 2025
  • 24-162-62 POST DEV FALL ARROWS SHEET 1 OF 2 Drawing · 03 Jun 2025
  • 2024 BOSWOOD S461 HOUSE TYPE-24S461-P1 PLANNING - RENDER AS REV A Drawing · 03 Jun 2025
  • 2024 BROOKWOOD S460 HOUSE TYPE-24S460-P1 PLANNING RENDER AS REV A Drawing · 03 Jun 2025
  • 2024 BURLWOOD S458 HOUSE TYPE-24S458-P1 PLANNING - RENDER AS REV A Drawing · 03 Jun 2025
  • 2024 CLAYWOOD S469 HOUSE TYPE-24S469-P1 PLANNING RENDER AS REV A Drawing · 03 Jun 2025
  • 2024 CRESTMONT S252 HOUSE TYPE-24S252-P1 PLANNING RENDER AS REV A Drawing · 03 Jun 2025
  • 2024 DENWOOD S462 HOUSE TYPE-24S462-1P2 PLANNING ELEVATION RENDER AS REV A Drawing · 03 Jun 2025
  • 2305-SSM-DPP-DR-AR-10103- REV 03 PHASE 1 DETAILED MASTERPLAN Drawing · 03 Jun 2025
  • 2305-SSM-DPP-DR-AR-10106- REV 03 VEHICLE MOBILITY PLAN Drawing · 03 Jun 2025
  • 2305-SSM-DPP-DR-AR-10200- REV 03 OPEN SPACE STRATEGY PLAN Drawing · 03 Jun 2025
  • 2305-SSM-DPP-DR-AR-10202- REV 03 LANDSCAPE MASTERPLAN- SHEET 1 Drawing · 03 Jun 2025
  • 2305-SSM-DPP-DR-AR-10203- REV 03 LANDSCAPE MASTERPLAN- SHEET 2 Drawing · 03 Jun 2025
  • 2305-SSM-DPP-DR-AR-10208- REV 01 OPEN SPACE 3 PLAN- GREENDYKES SOUTH PARK AND WO Drawing · 03 Jun 2025
  • 2305-SSM-DPP-DR-AR-10209- REV 01 OPEN SPACE 4 PLAN- CENTRAL PARKWAY Drawing · 03 Jun 2025
  • 2305-SSM-DPP-DR-AR-10210- REV 01 OPEN SPACE 5 PLAN- BING-VIEW PARK Drawing · 03 Jun 2025
  • 2305-SSM-DPP-DR-AR-10211- REV 02 OPEN SPACE SECTIONS SHEET 1 Drawing · 03 Jun 2025
  • 2305-SSM-DPP-DR-AR-10213- REV 02 OPEN SPACE SECTIONS SHEET 3 Drawing · 03 Jun 2025
  • 2305-SSM-DPP-DR-AR-10215- REV 01 CYCLE AND WASTE STORAGE DETAILS Drawing · 03 Jun 2025
  • 2305-SSM-DPP-DR-AR-10303- REV 02 AFFORDABLE HOUSING PLAN Drawing · 03 Jun 2025
  • 2305-SSM-DPP-DR-AR-10304- REV 02 STREET ELEVATIONS SHEET 2 Drawing · 03 Jun 2025
  • 2305-SSM-DPP-DR-AR-10304- REV 03 STREET ELEVATIONS SHEET 1 Drawing · 03 Jun 2025
  • 2305-SSM-PPP-DR-AR-00103- REV 03 SITE PLAN AS PROPOSED Drawing · 03 Jun 2025
  • 2305-SSM-PPP-DR-AR-00200- REV 01 PHASE 2 PARAMETER PLAN - LAND USE Drawing · 03 Jun 2025
  • 2305-SSM-PPP-DR-AR-00202- REV 01 PHASE 2 PARAMETER PLAN - ACCESS AND MOVEMENT Drawing · 03 Jun 2025
  • 2305-SSM-PPP-DR-AR-00203- REV 01 PROPOSED REGULATORY PLAN Drawing · 03 Jun 2025
  • 14348-GOO-P2-XX-DR-C-0552 DRAINAGE LAYOUT SHEET 2 Drawing · 03 Jun 2025
  • 14348-GOO-P2-XX-DR-C-0592 POST DEVELOPMENT FLOW PATHS Drawing · 03 Jun 2025
  • DOC 13 SI PART 2 Report · 03 Jun 2025
  • PHASE 2 DRAINAGE ASSESSMENT - INDEPENDENT CHECK CERTIFICATE BackGround Papers · 03 Jun 2025
  • 24-162-14A ROAD ADOPTION PLAN SHEET 1 OF 2 Drawing · 03 Jun 2025
  • 24-162-15A ROAD ADOPTION PLAN SHEET 2 OF 2 Drawing · 03 Jun 2025
  • 24-162-20 DRAINAGE LAYOUT SHEET 1 OF 2 Drawing · 03 Jun 2025
  • 24-162-21 DRAINAGE LAYOUT SHEET 2 OF 2 Drawing · 03 Jun 2025
  • 24-162-30 LEVELS LAYOUT SHEET 1 OF 7 Drawing · 03 Jun 2025
  • 24-162-31 LEVELS LAYOUT SHEET 2 OF 7 Drawing · 03 Jun 2025
  • 24-162-32 LEVELS LAYOUT SHEET 3 OF 7 Drawing · 03 Jun 2025
  • 24-162-33 LEVELS LAYOUT SHEET 4 OF 7 Drawing · 03 Jun 2025
  • 24-162-34 LEVELS LAYOUT SHEET 5 OF 7 Drawing · 03 Jun 2025
  • 24-162-35 LEVELS LAYOUT SHEET 6 OF 7 Drawing · 03 Jun 2025
  • 24-162-36 LEVELS LAYOUT SHEET 7 OF 7 Drawing · 03 Jun 2025
  • 24-162-60 PRE DEV FALL ARROWS SHEET 1 OF 2 Drawing · 03 Jun 2025
  • 24-162-63 POST DEV FALL ARROWS SHEET 2 OF 2 Drawing · 03 Jun 2025
  • 2021 HOUSING ASSOCIATION 4 BED 6 PERSON TERRACE-PLANNING AS BackGround Papers · 03 Jun 2025
  • 2023 CLARMONT SA20 HA 2B4P COTTAGE FLATS-SA20-P1 PLANNING LAYOUT Drawing · 03 Jun 2025
  • 2023 EDENMONT SA21 - HA 2B4P TERRACE-SA21-P5 PLANNING STONE AS Drawing · 03 Jun 2025
  • 2024 ADDINGTON S353 HOUSE TYPE-24S353-P1 PLANNING RENDER AS REV A Drawing · 03 Jun 2025
  • 2024 ALSTON S351 HOUSE TYPE-24S351-P1 PLANNING RENDER AS REV A Drawing · 03 Jun 2025
  • 2024 CHERRYWOOD S459 HOUSE TYPE-24S459-P1 PLANNING FLOOR PLANS AS REV A Drawing · 03 Jun 2025
  • 2024 DENWOOD S462 HOUSE TYPE-24S462-1P1 PLANNING FLOOR PLANS AS Drawing · 03 Jun 2025
  • 2024 EMBERWOOD S470 HOUSE TYPE-24S470-P1 PLANNING RENDER AS REV A Drawing · 03 Jun 2025
  • 2024 FENTON S354 HOUSE TYPE-24S354-P1 PLANNING - RENDER AS REV A Drawing · 03 Jun 2025
  • 2024 HAZELFORD S553 HOUSE TYPE-24S553-P1 PLANNING RENDER AS REV A Drawing · 03 Jun 2025
  • 2024 LONGMONT SA22 - HA 2B4P BUNGALOW-24SA22-P2 - PLANNING FLOOR PLANS REV A Drawing · 03 Jun 2025
  • 2024 SOUTHWOOD S451 HOUSE TYPE-24S451-P1 PLANNING RENDER AS REV A Drawing · 03 Jun 2025
  • 2024 YARWOOD S456 HOUSE TYPE-24S456-P1 PLANNING - RENDER AS REV A Drawing · 03 Jun 2025
  • 2305-SSM-DPP-DR-AR-10100- REV 02 DETAILED APPLICATION LOCATION PLAN Drawing · 03 Jun 2025
  • 2305-SSM-DPP-DR-AR-10102- REV 02 DETAILED APPLICATION EXISTING SITE SECTIONS Drawing · 03 Jun 2025
  • 2305-SSM-DPP-DR-AR-10104- REV 03 PHASE 1 DETAILED MASTERPLAN SAFE ROUTE TO SCHOO Drawing · 03 Jun 2025
  • 2305-SSM-DPP-DR-AR-10204- REV 03 LANDSCAPE MASTERPLAN- SHEET 3 Drawing · 03 Jun 2025
  • 2305-SSM-DPP-DR-AR-10206- REV 01 OPEN SPACE 1 PLAN- GREENDYKES SQUARE AND NORTH Drawing · 03 Jun 2025
  • 2305-SSM-DPP-DR-AR-10207- REV 01 OPEN SPACE 2 PLAN- ALBYN GATE Drawing · 03 Jun 2025
  • 2305-SSM-DPP-DR-AR-10212- REV 02 OPEN SPACE SECTIONS SHEET 2 Drawing · 03 Jun 2025
  • 2305-SSM-DPP-DR-AR-10214- REV 01 LANDSCAPE AND BOUNDARY DETAILS Drawing · 03 Jun 2025
  • 2305-SSM-DPP-DR-AR-10300- REV 04 SITE DEVELOPMENT PHASING PLAN Drawing · 03 Jun 2025
  • 2305-SSM-DPP-DR-AR-10301- REV 03 FLEXIBLE COMMUNITY SPACE PLAN Drawing · 03 Jun 2025
  • 2305-SSM-DPP-DR-AR-10302- REV 04 HOUSE TYPES LAYOUT Drawing · 03 Jun 2025
  • 2305-SSM-DPP-DR-AR-10307- REV 03 WASTE STRATEGY Drawing · 03 Jun 2025
  • 2305-SSM-DPP-DR-AR-10350- REV 03 BLOCK A PLOTS 262 AND 263 FLOOT PLANS SHEET 1 Drawing · 03 Jun 2025
  • 2305-SSM-DPP-DR-AR-10351- REV 03 BLOCK A PLOTS 262 AND 263 FLOOT PLANS SHEET 2 Drawing · 03 Jun 2025
  • 2305-SSM-DPP-DR-AR-10352- REV 03 BLOCK A PLOTS 262 AND 263 ELEVATIONS Drawing · 03 Jun 2025
  • 2305-SSM-DPP-DR-AR-10353- REV 03 BLOCK B PLOTS 264 TO 269 FLOOR PLANS SHEET 1 Drawing · 03 Jun 2025
  • 2305-SSM-DPP-DR-AR-10354- REV 03 BLOCK B PLOTS 264 TO 269 FLOOR PLANS SHEET 2 Drawing · 03 Jun 2025
  • 2305-SSM-DPP-DR-AR-10355- REV 03 BLOCK B PLOTS 264 TO 269 ELEVATIONS Drawing · 03 Jun 2025
  • 2305-SSM-DPP-DR-AR-10356- REV 03 FLAT TYPES Drawing · 03 Jun 2025
  • 2305-SSM-DPP-DR-AR-10400- REV 03 GATEWAY PARK ILLUSTRATIVE PLAN Drawing · 03 Jun 2025
  • 2305-SSM-DPP-DR-AR-10402- REV 01 GATEWAY PARK DETAILED LANDSCAPE Drawing · 03 Jun 2025
  • 2305-SSM-PPP-DR-AR-00100- REV 03 LOCATION PLAN Drawing · 03 Jun 2025
  • 2305-SSM-PPP-DR-AR-00101- REV 03 EXISTING SITE PLAN Drawing · 03 Jun 2025
  • 2305-SSM-PPP-DR-AR-00102- REV 02 PHOTOSHEET LOCAL CONTEXT Drawing · 03 Jun 2025
  • 2305-SSM-PPP-DR-AR-00201- REV 02 PHASE 2 PARAMETER PLAN - GREEN INFRASTRUCTURE Drawing · 03 Jun 2025
  • 3327-LIGHTING SHEET 1 Drawing · 03 Jun 2025
  • 3327-LIGHTING SHEET 2 Drawing · 03 Jun 2025
  • 3327-LIGHTING SHEET 2 Drawing · 03 Jun 2025
  • 14348-GOO-P1-XX-DR-C-0501 PROPOSED PARK LEVELS - PHASE 1 Drawing · 03 Jun 2025
  • 14348-GOO-P1-XX-DR-C-0502 PROPOSED PARK CUT FILL - PHASE 1 Drawing · 03 Jun 2025
  • 14348-GOO-P1-XX-DR-C-0503 PROPOSED OFFSITE PATH LEVELS - SAFE ROUTES TO SCHOOL Drawing · 03 Jun 2025
  • 14348-GOO-P1-XX-DR-C-0701 B8020 WIDENING GA Drawing · 03 Jun 2025
  • 14348-GOO-P1-XX-DR-C-0703 B8020 LEVELS Drawing · 03 Jun 2025
  • 14348-GOO-P1-XX-DR-C-0705 B8020 TRACKING Drawing · 03 Jun 2025
  • 14348-GOO-P2-XX-DR-C-0501 PROPOSED LEVELS SHEET 1 Drawing · 03 Jun 2025
  • 14348-GOO-P2-XX-DR-C-0503 CUT FILL Drawing · 03 Jun 2025
  • 14348-GOO-XX-XX-DR-C-1501 TOP SOIL STRATEGY BackGround Papers · 03 Jun 2025
  • AFFORDABLE TOWNHOUSE ELEVATIONS Drawing · 03 Jun 2025
  • AFFORDABLE TOWNHOUSE FLOOR PLANS Drawing · 03 Jun 2025
  • DOC09A-Q EIA REPORT VOLUME 2 FIGURE 6 3 Report · 03 Jun 2025
  • DOC09A-Q EIA REPORT VOLUME 2 FIGURE 7 1 Report · 03 Jun 2025
  • DOC09A-Q EIA REPORT VOLUME 2 FIGURE 7 2 Report · 03 Jun 2025
  • DOC09A-Q EIA REPORT VOLUME 2 FIGURES 5 1-5 7 Report · 03 Jun 2025
  • DOC09A-Q EIA REPORT VOLUME 3 FIGURES 5 8A-5 8G Report · 03 Jun 2025
  • DOC09A-Q EIA REPORT VOLUME 4 APPENDIX 2 1 Report · 03 Jun 2025
  • DOC09A-Q EIA REPORT VOLUME 4 APPENDIX 2 2 Report · 03 Jun 2025
  • DOC09A-Q EIA REPORT VOLUME 4 COVER AND CONTENTS Report · 03 Jun 2025
  • DOC09A-Q EIA VOL 1 CHAP 3 PROPOSED DEV DESCRIPTION Report · 03 Jun 2025
  • DOC09A-Q EIA VOLUME 1 CHAPTER 1 INTRODUCTION Report · 03 Jun 2025
  • DOC09A-Q REPORT VOLUME 1 COVER AND CONTENTS Report · 03 Jun 2025
  • DOC09A-Q REPORT VOLUME 2 COVER AND CONTENTS Report · 03 Jun 2025
  • DOC09A-Q VOLUME 3 COVER AND CONTENTS Report · 03 Jun 2025
  • DOC09A-QEIA REPORT VOL 1 CHAP 9 SCHEDULE OF MITIGATION Report · 03 Jun 2025
  • DOC09B EIA REPORT VOLUME 4 APPENDIX 6 1 Report · 03 Jun 2025
  • DOC09D EIA REPORT VOLUME 4 APPENDIX 7 1 Report · 03 Jun 2025
  • DOC09F EIA REPORT VOLUME 4 APPENDIX 7 3 Report · 03 Jun 2025
  • 2024 ASHTON SA30 - HA 3B5P TERRACE-24SA30-P5 PLANNING STONE AS Drawing · 03 Jun 2025
  • 2024 ASHTON SA30 - HA 3B5P TERRACE-24SA30-P6 PLANNING STONE OPP Drawing · 03 Jun 2025
  • 2024 ASTERWOOD S453 HOUSE TYPE-24S453-P1 PLANNING RENDER AS REV A Drawing · 03 Jun 2025
  • 2024 BELLWOOD S455 HOUSE TYPE-24S455-P1 PLANNING - RENDER AS REV A Drawing · 03 Jun 2025
  • 2024 SANDALWOOD S465 HOUSE TYPE-24S465-P1 PLANNING FLOOR PLANS AS REV A Drawing · 03 Jun 2025
  • 2305-SSM-DPP-DR-AR-10105- REV 03 SOFT MOBILITY PLAN Drawing · 03 Jun 2025
  • 2305-SSM-DPP-DR-AR-10401- REV 02 GATEWAY PARK SECTIONS Drawing · 03 Jun 2025
  • BAIRD PLANNING RENDER AS Drawing · 03 Jun 2025
  • DARROCH PLANNING RENDER AS Drawing · 03 Jun 2025
  • DOC01 PLANNING STATEMENT Report · 03 Jun 2025
  • DOC02 PAC PART 2 Report · 03 Jun 2025
  • DOC02 PAC PART 3 Report · 03 Jun 2025
  • DOC02 PAC PART 4 Report · 03 Jun 2025
  • DOC02 PAC PART 5 Report · 03 Jun 2025
  • DOC02 PAC PART 7 Report · 03 Jun 2025
  • DOC04 DAS PART 2 Report · 03 Jun 2025
  • DOC04 DAS PART 3 Report · 03 Jun 2025
  • DOC04 DAS PART 4 Report · 03 Jun 2025
  • DOC04 DAS PART 5 Report · 03 Jun 2025
  • DOC04 DAS PART 6 Report · 03 Jun 2025
  • DOC04 DAS PART 7 Report · 03 Jun 2025
  • DOC04 DAS PART 8 Report · 03 Jun 2025
  • DOC04 DAS PART 9 Report · 03 Jun 2025
  • DOC04 DAS PART 10 Report · 03 Jun 2025
  • DOC04 DAS PART 11 Report · 03 Jun 2025
  • DOC04 DAS PART 12 Report · 03 Jun 2025
  • DOC05 PHASE 2 DESIGN CODE PART 1 BackGround Papers · 03 Jun 2025
  • DOC05 PHASE 2 DESIGN CODE PART 2 BackGround Papers · 03 Jun 2025
  • DOC05 PHASE 2 DESIGN CODE PART 5 BackGround Papers · 03 Jun 2025
  • DOC05 PHASE 2 DESIGN CODE PART 7 BackGround Papers · 03 Jun 2025
  • DOC07 SUSTAINABILITY STATEMENT Report · 03 Jun 2025
  • DOC09O EIA REPORT VOLUME 4 APPENDIX 8 1 PART 1 BackGround Papers · 03 Jun 2025
  • DOC09O EIA REPORT VOLUME 4 APPENDIX 8 1 PART 2 BackGround Papers · 03 Jun 2025
  • DOC09O EIA REPORT VOLUME 4 APPENDIX 8 1 PART 3 BackGround Papers · 03 Jun 2025
  • DOC09O EIA REPORT VOLUME 4 APPENDIX 8 1 PART 4 BackGround Papers · 03 Jun 2025
  • DOC09P EIA REPORT VOLUME 4 APPENDIX 8 3 BackGround Papers · 03 Jun 2025
  • DOC09P EIA REPORT VOLUME 4 APPENDIX 8 3 BackGround Papers · 03 Jun 2025
  • DOC12 DRAINAGE STRATEGY REPORT PART 4 - PHASE 2 BackGround Papers · 03 Jun 2025
  • DOC13 SI PART 1 Report · 03 Jun 2025
  • DOC13 SI PART 3 Report · 03 Jun 2025
  • DOC13 SI PART 4 Report · 03 Jun 2025
  • DOC13 SI PART 5 Report · 03 Jun 2025
  • DOC13 SI PART 6 Report · 03 Jun 2025
  • DOC13 SI PART 7 Report · 03 Jun 2025
  • DOC13 SI PART 9 Report · 03 Jun 2025
  • DOC14 - CMRA SITE 2 Report · 03 Jun 2025
  • DOC16 ENVIRONMENTAL NOISE ASSESSMENT Report · 03 Jun 2025
  • DOC17 AIR QUALITY IMPACT ASSESSMENT Report · 03 Jun 2025
  • DOC18 TREE SURVEY AND ARBORICULTURAL REPORT Report · 03 Jun 2025
  • PHASE 2 DRAINAGE ASSESSMENT - COMPLIANCE CERTIFICATE BackGround Papers · 03 Jun 2025
  • POST SUBMISSION ADDITIONAL DOCUMENTS-002 BackGround Papers · 03 Jun 2025
  • POST SUBMISSION ADDITIONAL DOCUMENTS-004 BackGround Papers · 03 Jun 2025
  • SSM PRODUCTION SCHEDULE REV 03 BackGround Papers · 03 Jun 2025

Watch members (£5 a month) open the document list from here.

Open the documents

What happens while it is decided

This application is with West Lothian for determination, against a statutory target of eight weeks. Over the last year West Lothian decided outline applications in a median of 30 days. More in our guide to how long planning decisions take.

About outline applications

An outline application tests the principle of developing a site, holding back details such as appearance and landscaping as reserved matters for later approval. More in our guide to planning application types.

Nearby applications

Within 0.3 miles

In West Lothian

  • 0819/P/25 Granted

    Land North Of Windward Cottage Cemetery Road Fauldhouse West Lothian EH47 9BN

    Planning permission in principle for residential development

    Received 8 Oct, published by the council 28 Jul 2026 Outline
  • 0739/EXC/26 Granted

    Camilty Overhead Spur Line Auchinoon Hill Mast Kirknewton EH27 8DH

    Consultation from SP Energy Networks on application under Section 37 of the Electricity Act 1989 for 11kV overhead line

    Received 3 Sep, published by the council 10 Sep 2026 Outline
  • 0787/P/26 Awaiting decision

    2 Barkhill Road Linlithgow West Lothian EH49 6GZ

    Planning permission in principle for the erection of a house

    Received 21 Sep, published by the council 6 Oct 2026 Outline
  • 0783/EXC/26 Awaiting decision

    Blairmuckhole Farm Blairmuckhole And Forrestdyke Road Harthill North Lanarkshire ML7 5TR

    Consultation from North Lanarkshire Council on planning application 26/00951/FUL for construction of 3 wind turbines, associated access tracks and crane hardstandings and associated works

    Received 18 Sep, published by the council 6 Oct 2026 Outline
  • 0738/EXC/26 Granted

    381 Metres Northeast Of Whitemoss Farmhouse B7031 From Junction With A70 To Greenburn East Calder Kirknewton EH27 8DA

    Consultation from City of Edinburgh Council on planning application 26/02893/FUL for an outdoor activity centre and associated facilities

    Received 3 Sep, published by the council 17 Sep 2026 Outline