Skip to content
PlanIndex Get alerts
Menu

Planning application

Ellan Vannin Long Heys Lane Dalton Wigan Lancashire WN8 7RS

Granted West Lancashire 2022/1154/FUL Full Planning Application

Works: Roofing Small domestic

Read from the description, not a valuation. How we read the register

Permission granted. Work must normally begin within three years of the decision or the permission lapses.

Proposal

Increase ridge height above single storey living room, to convert loft space, to accommodate bedroom with en-suite bathroom. Replace existing chimney stack with narrower chimney. Solar Panels added to front and side elevations.

As published by the council, reference 2022/1154/FUL

Application record

Reference
2022/1154/FUL
Type
Full Planning Application
Status
Decided
Decision
Planning Permission Granted
Received
27 Oct 2022
Validated
23 Nov 2022
Decided
26 Apr 2023
Ward
Parbold
Parish
Dalton
Decision by
Committee
Postcode
WN8 7RS

Timeline

Dates from the published record

  1. 27 Oct 2022

    Received by West Lancashire

  2. 23 Nov 2022

    Validated

    Checked as complete and ready for consideration.

  3. 26 Apr 2023

    Decision issued: Planning Permission Granted

  4. 4 Sep 2026

    Added to PlanIndex

Who's behind it

Company information only, from the register and Companies House

Agent on file, a design practice

11 applications on PlanIndex · across 5 councils · 80% granted

Trade members see who it is, their full track record, and every application they have filed.

See who's behind it

Documents

Plans, drawings, consultee responses and the officer's report

18 documents on file for this application

A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.

Trade members open them from here.

Open the documents

What a grant of permission means

The process from here

Permission has been granted, usually subject to conditions listed on the decision notice, some of which must be discharged before work starts. The decision notice on the council portal sets out exactly what was approved.

Work must normally begin within three years of the decision or the permission lapses. Neighbours cannot appeal a grant; challenging one means judicial review of how the decision was made, within tight time limits.

About full applications applications

How this application type works

A full application seeks permission for a complete, detailed proposal in one go: siting, design, access and landscaping are all fixed at this stage. It is the standard route for new buildings, conversions and changes of use. The statutory target is eight weeks for smaller schemes and thirteen weeks for major development, though complex cases often take longer by agreement.

More on full applications applications in our guide

Nearby applications

Within 500 metres

  • Ellan Vannin Long Heys Lane Dalton Wigan Lancashire WN8 7RS

    2022/1154/FUL Submitted 27 Oct 2022 0m away

    Increase ridge height above single storey living room, to convert loft space, to accommodate bedroom with en-suite bathroom. Replace existing chimney stack with narrower chimney. Solar Panels added to front and side elevations.

    Granted Full applications Roofing 18 docs
    Small domestic
  • Ellan Vannin Long Heys Lane Dalton Wigan Lancashire WN8 7RS

    2021/0482/FUL Submitted 14 Apr 2021 4m away

    Proposed extension over existing ground floor level with front dormer, rear Juliette balcony & front & rear velux roof window- remove & rebuild chimney stack

    Refused Full applications Extension Loft or dormer +1 7 docs
  • The Barn Long Heys Lane Dalton Wigan Lancashire WN8 7RS

    2021/0615/FUL Submitted 11 May 2021 77m away

    Retrospective application for detached garage with dimensions differing from application 2019/1085/FUL; wooden store, wall to the front of detached garage, walls to entrance, gate posts and gate to north of dwelling house.

    Granted Full applications 7 docs
    Domestic
  • The Barn Long Heys Lane Dalton Wigan Lancashire WN8 7RS

    2021/0615/FUL Submitted 11 May 2021 77m away

    Retrospective application for detached garage with dimensions differing from application 2019/1085/FUL; wooden store, wall to the front of detached garage, walls to entrance, gate posts and gate to north of dwelling house.

    Granted Full applications 7 docs
    Domestic
  • Bradshaws Farm Long Heys Lane Dalton Wigan Lancashire WN8 7RS

    2026/0719/FUL Submitted 28 Aug 2026 403m away

    86% historically approved · decision due ~23 Oct

    Proposed single-storey extension to side and two-storey porch extension. Raise ridge of first floor side extension subsequent to permission 2013/1186/FUL. Solar panels to main roof.

    Awaiting decision Full applications Extension 9 docs
    Small domestic

In West Lancashire

  • 2026/0728/FUL Awaiting decision

    Lower Wrennalls House Coopers Lane Hilldale Heskin Chorley Lancashire PR7 5PU

    Proposed erection of equestrian stable block.

    1 Sep 2026 Full applications
  • 2026/0724/FUL Awaiting decision

    Stone Hall Cottage Crow Lane Dalton Wigan Lancashire WN8 7RY

    Part retrospective alterations and extensions incorporating partial demolition and reconstruction of the existing dwelling.

    31 Aug 2026 Full applications
  • 2026/0722/FUL Awaiting decision

    Wrightington Hospital Hall Lane Wrightington Wigan Lancashire WN6 9EP

    Proposed demolition of hospital building and construction of a new hospital building extension (Use Class C2) that comprises ground floor and part first floor with link walkway and associated acces...

    28 Aug 2026 Full applications
  • 2026/0626/FUL Granted

    20A Church Road Skelmersdale Lancashire WN8 8PH

    Proposed single story front extension and conversion of existing garage into habitable accommodation

    24 Jul 2026 Full applications
  • 2026/0352/FUL Granted

    Moor Farm Liverpool Old Road Sollom Tarleton Preston Lancashire PR4 6HR

    Erection of an agricultural building (retrospective).

    28 Apr 2026 Full applications