Skip to content
PlanIndex Get alerts
Menu

Planning application

Land Adjacent To 9 Greenacre Place Newbury RG14 7GY

Awaiting decision West Berkshire 26/01773/TPW

Still open. Anyone can comment while the consultation period runs, and comments go to the council rather than to us.

Proposal

3015 - Ceder, 0544 - Ceder, 3014 - Ceder, 3016 - Ceder, 3017 - Ceder. Deodar cedar (Cedrus deodara) The work required is to trim back the hanging branches and to cut back the lower limbs that are breaching the driveway at 9 greenacre place and the close to the roof up to 2m of branch.

As published by the council, reference 26/01773/TPW

Application record

Reference
26/01773/TPW
Status
Awaiting decision
Received
14 Aug 2026
Validated
14 Aug 2026
Postcode
RG14 7GY

Timeline

Dates from the published record

  1. 14 Aug 2026

    Received by West Berkshire

  2. 19 Aug 2026

    Added to PlanIndex

  3. Decision

    Awaiting decision

    Decision expected by 9 October 2026, 8 weeks from validation under the statutory target for most applications. Extensions of time are common and are agreed case by case.

    West Berkshire took a median of 58 days over the applications it decided in the last year.

What happens while it is decided

This application is with West Berkshire for determination, against a statutory target of eight weeks. Over the last year West Berkshire's median decision took 58 days. More in our guide to how long planning decisions take.

About this record

The published feed does not state which type of application this is; the register entry on West Berkshire's portal will say. Our guide explains the common types.

Nearby applications

Within 500 metres

  • 19 Greenacre Place Newbury RG14 7GY

    26/01522/TPW Submitted 10 Jul 2026 0m away

    90% historically approved · decision due ~9 Oct

    The Ash tree in question is on the boarder of 19 Greenacre Place and 8 The Night Owls, RG19 8SB. Work (crown lift and reduction) was carried out to this tree approximately 5 years ago. Crown reduction (approximately 3 meters in line with previous cuts) and potentially the removal of a limb (it's this limb that is getting too close to the house). I propose a 2-3m reduction of the canopy of the tree and the removal of 1 significant limb as shown in the photos provided. Maximum diameter of cuts for the overall crown reduction would be 8cm. Maximum diameter of cut for the limb removal would be 40cm. The current height of the tree from ground level is 16-17m, the overall height of the tree after the reduction would be 13-14m. All pruning cuts to be carried out in accordance with BS3998.

    Awaiting decision Trees
  • 1 Greenham Cottage Pyle Hill Newbury Berkshire RG14 7SJ

    04/01854/RELAX Submitted 29 Jul 2004 93m away

    Variation of landscaping pre-condition No. 9 attached to planning permission 03/00781/FUL (Residential development for five detached dwellings with associated access and landscaping)

    Granted Conditions New dwelling 2 docs
  • 7 Night Owls Greenham Thatcham RG19 8SB

    26/01952/5DAY Submitted 4 Sep 2026 100m away

    90% historically approved · decision due ~30 Oct

    Maple with extensive Kretzschmaria deusta infection - fell to ground following recent branch failure.

    Decided Trees
  • 5 The Cedars Newbury RG14 7AA

    25/02333/TPW Submitted 9 Oct 2025 104m away

    Dismantle 5no. conifers at 3m high, 0.2m at the base.

    Decided Trees 3 docs
  • Woodpecker Cottage Pinchington Lane Greenham Thatcham RG19 8SR

    26/01389/5DAY Submitted 24 Jun 2026 176m away

    90% historically approved · decision due ~19 Aug

    Pine - Fell

    Decided
  • Pinchington Lodge Pinchington Lane Greenham Thatcham RG19 8SR

    26/01236/TPW Submitted 9 Jun 2026 176m away

    90% historically approved · decision due ~4 Aug

    T1 - Oak: The oak tree exhibits significant decay within the main stem and has previously suffered a major limb failure, resulting in substantial canopy loss. The tree is now leaning towards the adjacent property. Reduce to a monolith at approximately 2 metres (5/6 feet) in height for habitat purposes. T2, T3, T4 and T5 - Oaks (Group of 4): These mature oak trees overhang the neighbouring property (Beeridge and Co Builders Ltd). Works are required to mitigate risk from falling branches and manage overall size. Crown reduction by 2/3 metres. Final finished height: approximately 16/17 metres. Final crown spread: approximately 9/11 metres T6 - Ash (multi-stem): This ash tree is affected by ash dieback and is in decline. There is evidence of previous limb failure, significant deadwood, and a large suspended branch. Heavy pollard reduction by approximately 4/5 metres. Final finished height: approximately 12/13 metres. Final crown spread: approximately 6/8 metres

    Decided Trees