Planning application

Council owned flats: 38-48 & 50-60 Aldykes Hatfield AL10 8EF

Awaiting decision Welwyn Hatfield 6/2026/1274/FULL FULL PERMISSION

Works: Windows or glazing

Still open. Anyone can comment while the consultation period runs, and comments go to the council rather than to us.

Proposal

Installation of external wall insulation, replacing windows and doors with energy-efficient units, insulating and upgrading balconies, and replacing the existing cladding with non combustible fibre-cement plank

As published by the council, reference 6/2026/1274/FULL

Application record

Reference
6/2026/1274/FULL
Type
FULL PERMISSION
Status
Under Consideration
Received
20 Jul 2026
Validated
21 Jul 2026
Ward
Hatfield South West
Parish
Hatfield
Decision by
Delegated
Postcode
AL10 8EF

Timeline

Dates from the published record

  1. 20 Jul 2026

    Received by Welwyn Hatfield

  2. 21 Jul 2026

    Validated

    Checked as complete and ready for consideration.

  3. 9 Aug 2026

    Added to PlanIndex

  4. 25 Aug 2026

    Status changed to Under Consideration

    Previously Under Consultation.

  5. Decision

    Awaiting decision

    Decision expected by 15 September 2026, 8 weeks from validation under the statutory target for most applications. Extensions of time are common and are agreed case by case.

    Welwyn Hatfield took a median of 58 days over the applications it decided in the last year.

Documents

Plans, drawings, consultee responses and the officer's report

3 documents on file for this application

A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.

Trade members open them from here.

Open the documents

What happens while it is decided

The process from here

This application is with Welwyn Hatfield for determination. The council publicises it, consults neighbours and technical bodies where required, and weighs the responses against local and national planning policy.

The statutory target is eight weeks for most applications and thirteen for major development, though extensions of time are common. Comments carry most weight while the case is undecided, so check the council portal for the deadline if you want to respond.

About full applications applications

How this application type works

A full application seeks permission for a complete, detailed proposal in one go: siting, design, access and landscaping are all fixed at this stage. It is the standard route for new buildings, conversions and changes of use. The statutory target is eight weeks for smaller schemes and thirteen weeks for major development, though complex cases often take longer by agreement.

More on full applications applications in our guide

Nearby applications

Within 500 metres

  • Council owned flats in Aldykes & Briars Wood 2-12, 14-24 Aldykes Hatfield & 38-48 & 50-60 Briars Wood Hatfield AL10 8EF

    6/2026/1272/FULL Submitted 20 Jul 2026 50m away

    81% historically approved · decision due ~14 Sep

    Installation of insulation to all of the external walls, replacement windows and doors to double/triple glazed units and thermal doors, balcony insulation system to be added to balcony slab and new railings (to match existing) to be installed, replacement of existing cladding panels with non combustible fibre-cement plank, colour to match existing

    Awaiting decision Full applications Windows or glazing 8 docs
  • Council owned flats: 26-36 Aldykes Hatfield AL10 8EF and 44-54 Feather Del, Hatfield AL10 8DD

    6/2026/1273/FULL Submitted 20 Jul 2026 92m away

    81% historically approved · decision due ~14 Sep

    Replacement windows and doors to double/triple glazed units and thermal doors with the addition of balcony insulation system to balcony slab and new railings (to match existing, installation of cavity wall insulation to all external walls

    Awaiting decision Full applications Windows or glazing 6 docs
  • 28 Briars Wood Hatfield AL10 8DG

    6/2023/0167/FULL Submitted 24 Jan 2023 126m away

    Change of use from amenity land to residential driveway and installation of hardstanding (retrospective)

    Granted Full applications
  • 5 Meadow Croft Hatfield AL10 0SG

    6/2021/2044/PN8 Submitted 6 Jul 2021 148m away

    Prior approval for the erection of a single storey rear extension measuring 5m in depth, 3.3m in height and 3m to the eaves.

    Granted Prior approval Extension
    Small domestic
  • 5 Meadow Croft Hatfield AL10 0SG

    6/2021/2048/LAWP Submitted 6 Jul 2021 148m away

    Certificate of lawfulness for erection of single storey rear extension and front porch

    Granted Lawful development Extension
    Small domestic
  • 7 Meadow Croft Hatfield AL10 0SG

    6/2021/2310/PN8 Submitted 3 Aug 2021 156m away

    Prior approval for the erection of a single storey rear extension measuring 5m in depth, 3.3m in height, 3m to the eaves

    Granted Prior approval Extension
    Small domestic

In Welwyn Hatfield

  • Old Owen's Sports Ground Coopers Lane Potters Bar EN6 4NF

    Installation of 1 no. single padel court

    27 May 2026 Full applications
  • 6/2026/0740/FULL Withdrawn

    Land to the rear of 8 Birds Close Welwyn Garden City AL7 4AR

    Erection of a single storey detached dwelling with basement

    27 Apr 2026 Full applications
  • 6/2026/1231/FULL Withdrawn

    St Johns Church Of England Jmi School Lemsford Village Lemsford Welwyn Garden City AL8 7TR

    Installation of new fencing and gates across the school boundary adjacent to the main road

    13 Jul 2026 Full applications
  • 15 Tiger Moth Way Hatfield AL10 9LT

    Change of use of general amenity land to residential garden and erection of a 2 metre high timber boundary fence following removal of existing hedge and boundary treatment

    1 Jun 2026 Full applications
  • Warren Lodge Stables Great North Road Hatfield AL9 5JX

    Change of use of land to use as a Gypsy/Traveller caravan site, comprising 9 pitches each accommodating two caravans, including no more than one static caravan/mobile home per pitch, together with the laying of hardstanding and erection of acoustic fence

    19 Feb 2026 Full applications