Planning application
Land adjacent to Sewells Welwyn Garden City AL8 7SN
Still open. Anyone can comment while the consultation period runs, and comments go to the council rather than to us.
Proposal
Proposed redevelopment of the land for four new family homes, alongside the proposed soft and hard landscaping scheme, car and cycle parking and refuse and recycling provision
As published by the council, reference 6/2025/2491/FULL
Application record
- Reference
- 6/2025/2491/FULL
- Type
- FULL PERMISSION
- Status
- Under Consultation
- Received
- 28 Nov 2025
- Validated
- 24 Dec 2025
- Ward
- Sherrards
- Decision by
- Delegated
- Postcode
- AL8 7SN
Timeline
Dates from the published record
-
28 Nov 2025
Received by Welwyn Hatfield
-
24 Dec 2025
Validated
Checked as complete and ready for consideration.
-
24 Jul 2026
Added to PlanIndex
-
13 Sep 2026
Status changed to Under Consultation
Previously Under Consideration.
-
Decision
Awaiting decision
Decision expected by 18 February 2026, 8 weeks from validation under the statutory target for most applications. Extensions of time are common and are agreed case by case.
Welwyn Hatfield took a median of 58 days over the applications it decided in the last year.
Documents
Plans, drawings, consultee responses and the officer's report
1 document on file for this application
A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.
Watch members (£5 a month) open the document list from here.
Open the documentsWhat happens while it is decided
This application is with Welwyn Hatfield for determination, against a statutory target of eight weeks. Over the last year Welwyn Hatfield decided full applications in a median of 102 days. More in our guide to how long planning decisions take.
About full applications
A full application seeks permission for a complete, detailed proposal in one go, with siting, design, access and landscaping all fixed at this stage. More in our guide to planning application types.
Nearby applications
Within 0.3 miles
-
8 Harwood Close Welwyn Garden City AL8 7SN
Retrospective application for outbuilding and decking in rear garden
Granted HouseholderSmall domestic -
Land at Digwell Lakes, A1000 Bessemer Road or Digswell Park Road, Welwyn Garden City, AL6 0ST
5 DAY NOTICE - All trees covered by TPO 877 (2023) W1. T1. Beech to fell (hollow at base, cavities and significant decay progression) T2. Beach to fell (dead) T3. Beech to fell/monolith (decay) T4. Beech to remove remaining crown and reduce stem by a further 2/3m (previously failed).
Granted Trees -
9 Archfield Welwyn Garden City AL7 1UH
Block up low window on front elevation, insert 1 x higher window on side elevation
Granted Householder Windows or glazingDomestic -
37 Rosedale Welwyn Garden City AL7 1DW
Erection of single storey rear extension
Granted Householder ExtensionSmall domestic -
37 Rosedale Welwyn Garden City AL7 1DW
Prior approval for the erection of a single storey rear extension measuring 5m in depth, 3m in height and 3m to the eaves.
Granted Prior approval ExtensionSmall domestic -
41 Rosedale Welwyn Garden City AL7 1DW
Reduce 1 x Cherry Plum by 1.5m height and width and 1 x Wild Plum to fell to ground level
Granted Trees
Other full applications
In Welwyn Hatfield
-
6/2026/1124/FULL Withdrawn
39 The Ridgeway Northaw EN6 4BD
Proposed construction of new house and garage following demolition of existing house and garage
-
6/2026/0929/FULL Granted
Old Owen's Sports Ground Coopers Lane Potters Bar EN6 4NF
Installation of 1 no. single padel court
-
6/2026/0740/FULL Withdrawn
Land to the rear of 8 Birds Close Welwyn Garden City AL7 4AR
Erection of a single storey detached dwelling with basement
-
6/2026/1231/FULL Withdrawn
St Johns Church Of England Jmi School Lemsford Village Lemsford Welwyn Garden City AL8 7TR
Installation of new fencing and gates across the school boundary adjacent to the main road
-
6/2026/0960/FULL Refused
15 Tiger Moth Way Hatfield AL10 9LT
Change of use of general amenity land to residential garden and erection of a 2 metre high timber boundary fence following removal of existing hedge and boundary treatment