Planning application
Land East Of Sewage Works On Track Known As Muddy, Prestwick Lane, Grayswood, Surrey
Works: New dwelling Domestic
Read from the description, not a valuation. How we read the register
Still open. Anyone can comment while the consultation period runs, and comments go to the council rather than to us.
Proposal
Erection of a detached self build dwelling and detached garage with associated landscaping.
As published by the council, reference WA/2026/01374
Application record
- Reference
- WA/2026/01374
- Type
- FULL APPLICATION
- Status
- Undecided
- Received
- 17 Jul 2026
- Validated
- 29 Jul 2026
- Ward
- Haslemere East and Grayswood
- Parish
- Haslemere
- Decision by
- Delegated
Site history
Applications at this address on the Waverley register
This site has had 2 applications since 2017: 1 approved, 0 refused.
-
WA/2017/0737 Granted
Land East Of Sewage Works On Track Known As Muddy, Prestwick Lane, Grayswood, Surrey
Erection of stables/stores and hard standing together with change of use of land to equestrian following demolition of existing stables (as amplified by ecological report received 30/06/2017 and supporting statement received 03/07/2017). (Revision of wa/
Timeline
Dates from the published record
-
17 Jul 2026
Received by Waverley
-
29 Jul 2026
Validated
Checked as complete and ready for consideration.
-
3 Aug 2026
Added to PlanIndex
-
Decision
Awaiting decision
Decision expected by 23 September 2026, 8 weeks from validation under the statutory target for most applications. Extensions of time are common and are agreed case by case.
Waverley took a median of 57 days over the applications it decided in the last year.
Documents
Plans, drawings, consultee responses and the officer's report
42 documents on file for this application
A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.
Watch members (£5 a month) open the document list from here.
Open the documentsWhat happens while it is decided
This application is with Waverley for determination, against a statutory target of eight weeks. Over the last year Waverley decided full applications in a median of 84 days. More in our guide to how long planning decisions take.
About full applications
A full application seeks permission for a complete, detailed proposal in one go, with siting, design, access and landscaping all fixed at this stage. More in our guide to planning application types.
Other full applications
In Waverley
-
WA/2025/02136 Granted
Little Hatch, Tennysons Lane, Haslemere, Surrey, GU27 3AF
Erection of a dwelling with pv panels and air source heat pump together with a detached garage and associated works following demolition of existing single storey dwelling garage and outbuilding (as amended by plans and documents received on 30.01.2026 And 10.09.2026).
-
WA/2026/01487 Refused
Robins Farm, Fisher Lane, Chiddingfold, Godalming, Surrey, GU8 4TB
Change of use of part of existing barn (north barn) to provide office and ancillary storage together with alterations to fenestration.
-
WA/2026/01484 Granted
Burton Pavilion, Milford Heath Road, Milford, Godalming, Surrey, GU8 5BX
Erection of a single storey extension.
-
WA/2026/01392 Granted
Meadfields Farm, Three Gates Lane, Haslemere, Surrey, GU27 2LD
Change of use of loft space above garage/store to provide a short-term holiday let.
-
WA/2026/01432 Refused
2 Flat 1, Rowland Road, Cranleigh, Surrey, GU6 8SW
Erection of ground floor extension and alterations to elevations; erection of a garage/store with habitable accommodation above following demolition of existing garage/store (as amended by plans received 04/09/2026).