Skip to content
PlanIndex Get alerts
Menu

Planning application

Telecommunications Mast Radlett Road Watford WD24 4LH

Awaiting decision Watford 26/00628/GPDO GPDO Part 24 Telecommunications

Still open. Anyone can comment while the consultation period runs, and comments go to the council rather than to us.

Proposal

Notification of the installation of a 22.5m monopole supporting, 12no. antennas, 4 no.s dishes, 7 no. cabinets and ancillary equipment. For informative purposes, permitted by Class A(a) of Part 16 of Schedule 2 of the GPDO are shown on the accompanying drawings.

As published by the council, reference 26/00628/GPDO

Application record

Reference
26/00628/GPDO
Type
GPDO Part 24 Telecommunications
Status
Pending consideration
Received
12 Aug 2026
Validated
12 Aug 2026
Ward
Tudor
Decision by
Delegated
Postcode
WD24 4LH

Comment by 18 September 2026

The council is taking comments on this application until then. Have your say on Watford's portal.

Timeline

Dates from the published record

  1. 12 Aug 2026

    Received by Watford

  2. 2 Sep 2026

    Added to PlanIndex

  3. Decision

    Awaiting decision

    Decision expected by 7 October 2026, 8 weeks from validation under the statutory target for most applications. Extensions of time are common and are agreed case by case.

    Watford took a median of 55 days over the applications it decided in the last year.

Documents

Plans, drawings, consultee responses and the officer's report

12 documents on file for this application

A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.

Trade members open them from here.

Open the documents

What happens while it is decided

The process from here

This application is with Watford for determination. The council publicises it, consults neighbours and technical bodies where required, and weighs the responses against local and national planning policy.

The statutory target is eight weeks for most applications and thirteen for major development, though extensions of time are common. Comments carry most weight while the case is undecided, so check the council portal for the deadline if you want to respond.

About telecoms applications

How this application type works

Telecommunications applications cover masts, antennas and cabinets, most of which come forward as prior approval cases under permitted development rules. The council typically has 56 days to consider siting and appearance only. The need for the network itself is treated as established, so objections carry most weight where they address visual impact or siting.

More on telecoms applications in our guide

Nearby applications

Within 500 metres

  • 14 Shaftesbury Road Watford Hertfordshire WD17 2RQ

    22/00736/FULH Submitted 2 Jun 2022 181m away

    Erection of a single storey rear extension with roof lights.

    Refused Householder Extension Loft or dormer 8 docs
    Small domestic
  • 8 Queens Place Watford Hertfordshire WD17 2RD

    23/00109/FUL Submitted 13 Feb 2023 209m away

    Retrospective change of use of existing 6 bed HMO (Use Class C4) to 8 bed HMO (Use Class Sui Generis)

    Decided Full applications 14 docs
  • 4 Queens Place Watford Hertfordshire WD17 2RD

    23/00720/FULH Submitted 16 Aug 2023 221m away

    Erection of first floor part rear extension

    Refused Householder Extension 4 docs
    Domestic
  • 4 Queens Place Watford Hertfordshire WD17 2RD

    23/00715/LDC Submitted 15 Aug 2023 221m away

    Lawful Development Certificate for Proposed Loft Conversion

    Refused Lawful development Loft or dormer 4 docs
  • 141 Gladstone Road Watford WD17 2RA

    24/00621/FUL Submitted 28 Jun 2024 222m away

    Change of use from existing small HMO to larger HMO including extension of roof to raise the ridge and x4 side dormers providing additional accomodation

    Refused Full applications Extension Loft or dormer +1 20 docs
  • Land Adjacent To 111 Queens Road Watford

    23/01125/FULH Submitted 6 Dec 2023 223m away

    Erection of a single storey rear extension and rear dormer window.

    Decided Householder Extension Loft or dormer +1 6 docs
    Small domestic

In Watford

  • 25/00721/GPDO Withdrawn

    Grass Verge Off Coates Way St Albans Road Watford WD25 9NW

    Notification of the installation of a 20 metre high monopole supporting 6 no. antennas and 2 no. transmission dishes, together with 3 no. ground based equipment cabinets and ancillary development thereto

    4 Aug 2025 Telecoms
  • 25/00534/GPDO Granted

    Grass Verge On Junction Of Wiggenhall Road And Farraline Road Wiggenhall Road Watford WD18 0DQ

    Installation of a 20m high Hutchinson Engineering Phase 8 monopole with wrap around cabinet supporting 6no. antennas, 2no. 300mm transmission dishes, 3no equipment cabinets and ancillary development thereto.

    6 Jun 2025 Telecoms
  • 25/00366/GPDO Granted

    Pavement Outside North Watford Methodist Church The Harebreaks Watford

    Notification of the installation of a 17.5 m monopole supporting 6no. antennas, 1no. 300mm transmission dish and ancillary development thereto. For informative purposes, 3no. equipment cabinets permitted by Class A(a) of Part 16 of Schedule 2 of the GPDO are shown on the accompanying drawings.

    14 Apr 2025 Telecoms
  • 24/00080/GPDO Granted

    Grass Verge Adjacent To 27 Greenhill Crescent Watford

    Notification of installation of: Slimline monopole, antenna apertures, dishes, cabinets and associated ancillary development.

    2 Feb 2024 Telecoms
  • 23/00849/GPDO Granted

    Land At 113 Bushey Mill Lane Watford

    The installation of a 20-metre-high monopole telecommunications mast supporting 6 no. antennas, the installation of 2 no. equipment cabinets and a meter cabinet and development works ancillary thereto. Prior approval application for siting and appearance.

    20 Sep 2023 Telecoms