Planning application
Oxhey Early Years Centre Eastbury Road Watford WD19 4RL
Still open. Anyone can comment while the consultation period runs, and comments go to the council rather than to us.
Proposal
Removal of existing hedging and unsafe wire mesh fencing and installation of a new 1.8m boundary fencing system and access gates to a nursery school frontage. The supply and erection of welded mesh fencing with steel posts.
As published by the council, reference 26/00606/FUL
Application record
- Reference
- 26/00606/FUL
- Type
- Full Planning Permission
- Status
- Pending consideration
- Received
- 5 Aug 2026
- Validated
- 5 Aug 2026
- Ward
- Oxhey
- Decision by
- Delegated
- Postcode
- WD19 4RL
Timeline
Dates from the published record
-
5 Aug 2026
Received by Watford
-
15 Aug 2026
Added to PlanIndex
-
Decision
Awaiting decision
Decision expected by 30 September 2026, 8 weeks from validation under the statutory target for most applications. Extensions of time are common and are agreed case by case.
Watford took a median of 55 days over the applications it decided in the last year.
Documents
Plans, drawings, consultee responses and the officer's report
14 documents on file for this application
A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.
Trade members open them from here.
Open the documentsWhat happens while it is decided
The process from here
This application is with Watford for determination. The council publicises it, consults neighbours and technical bodies where required, and weighs the responses against local and national planning policy.
The statutory target is eight weeks for most applications and thirteen for major development, though extensions of time are common. Comments carry most weight while the case is undecided, so check the council portal for the deadline if you want to respond.
About full applications applications
How this application type works
A full application seeks permission for a complete, detailed proposal in one go: siting, design, access and landscaping are all fixed at this stage. It is the standard route for new buildings, conversions and changes of use. The statutory target is eight weeks for smaller schemes and thirteen weeks for major development, though complex cases often take longer by agreement.
Nearby applications
Within 500 metres
-
51 Eastbury Road Watford WD19 4JN
Erection of first floor upward extension to create two storey dwelling, front porch, outbuilding and fenestration
Decided Householder Extension Windows or glazing 12 docsSmall domestic -
51 Eastbury Road Watford WD19 4JN
Erection of a single storey outbuilding for installation of swimming pool and gym (REVISED PLAN AND TREE REPORT)
Refused Householder Trees 14 docsSmall domestic -
51 Eastbury Road Watford WD19 4JN
Variation of condition 4 of planning permission 23/00579/FULH to install a balcony at the rear
Withdrawn Amendments 9 docs -
45 Colne Avenue Watford WD19 4JF
Lawful Development Certificate for roof dormer addition to semi-detached dwelling
Granted Lawful development New dwelling Loft or dormer 8 docsDomestic -
45 Colne Avenue Watford Hertfordshire WD19 4JF
The erection of single storey rear extension which would extend beyond the rear wall of the original house by 5.99m for which the maximum height would be 2.99m and for which the height of the eaves would be 2.99
Granted Prior approval Extension 9 docsSmall domestic -
Happy Hour Public House Eastbury Road Watford WD19 4JL
Planning application for the demolition of existing building and erection of 32 dwellings together with a means of access from Eastbury Road, provision of associated parking, amenity space and landscaping.
Decided Full applications Demolition 102 docsMajor scheme
Other full applications applications
In Watford
-
26/00701/FUL Awaiting decision
Penman Johnson Solicitors 5 George Street Watford Hertfordshire WD18 0SQ
Installation, to existing commercial building, of replacement fenestration and wall lights, 2 mechanical ventilation recovery units and 6 louvre outlet grilles, and external ceiling and associated led lighting to existing undercroft
-
26/00694/FUL Awaiting decision
Leavesden Road Baptist Church Community Hall Leavesden Road Watford WD24 5ER
Installation of rooflights to the existing community hall roof and associated internal works to facilitate use of the existing roof space.
-
26/00681/FUL Awaiting decision
Blackwood 4A Bay Tree Walk Watford Hertfordshire WD17 4YX
Demolition of the existing dwelling and ancillary buildings and erection of three detached dwellings with associated access, parking, landscaping and private amenity space.
-
26/00523/FUL Decided
Unit 1 Riverwell Square Shrodells Road Watford Hertfordshire WD18 0HA
Proposed installation of fixed outdoor street furniture seating area including, tables and bench seating
-
26/00679/FUL Awaiting decision
Flat 1 22 Second Avenue Watford WD25 9PX
Replacement door